Name of Washery/Location
Year of
|
Capa-
|
|
comm.
|
city
|
|
|
( MTY)
|
Dudga-ii
|
1969
|
2.00
|
Bhojudih
|
1962
|
1.70
|
Patherdih
|
1964
|
1.60
|
Sudamdih
|
1980
|
1.60
|
Moonidih
|
1983
|
1.60
|
Mahuda
|
1989
|
0.63
|
BCCL
|
|
9.13
|
Kathara
|
1970
|
3.00
|
Swang
|
1970
|
0.75
|
Rajrappa
|
1986
|
3.00
|
Kedla
|
1997
|
2.60
|
CCL
|
|
9.35
|
Nandan
|
1984
|
1.20
|
WCL
|
|
1.20
|
|
|
|
CIL(07-08)
|
|
19.68
|
|
|
|
NON-COKING COAL WASHERIES :
|
|
|
Dugda-i
|
1961/1999
|
1.00
|
Madhuban
|
1999/2003
|
2.50
|
BCCL
|
|
3.50
|
Gidi
|
1970/1998
|
2.50
|
Piparwar
|
1997
|
6.50
|
Kargali
|
1958/1999
|
2.72
|
CCL
|
|
11.72
|
Bina
|
1999
|
4.50
|
NCL
|
|
4.50
|
CIL(07-08)
|
|
19.72
|
CIL is going to set up 19 nos. of coal washeries on Build, Operate & Maintain basis in the first phase. These washeries are expected to be commissioned by 2011-12. CMPDI has prepared a Model Bid Document for this purpose. These washeries will be set up in different subsidiaries except NCL. Details of ,subsidiary wise, no.of washeries to be set up & their capacities are listed below:
Subsidiary Nos. of washery Capacity
ECL : Chitra(2.5MTY), SonpurBazari(5.0MTY). 02 7.50MTY
BCCL : Madhuban(5.0MTY) , Patherdih(5.0MTY), 06 18.60 MTY
Patherdih(2.5MTY) ,Bhojudih(2.0MTY),
Dugda(2.5MTY) ,Dahibari(1.6MTY).
CCL : Ashoka(10.0MTY), Piparwar(3.5MTY), 04 19.5 MTY
Karo(2.5MTY) ,Konar(3.5MTY).
MCL : Basundhara(10.0MTY), Hingula(10.0MTY), 04 40.0MTY
Jagannath(10.0MTY),
Samleshwari(10.0MTY).
SECL : Kusmunda(5.0MTY), Baroud(5.0MTY). 02 10.0MTY
WCL : Ghughus/Wani (5.0MTY) 01 5.0 MTY
---------- -------------
Total : 19 100.6 MTY
------------ -------------
Global tenders floated :
BCCL- for washery at Madhuban,Patherdih(5 MTY),Dugda.
CCL- for washery at Ashoka.
MCL- for washery at Basundhara.