GUIDELINES FOR COMMON BIO-MEDICAL WASTE TREATMENT FACILITY

Download

Monday, September 4, 2006

 

GUIDELINES FOR COMMON BIO-MEDICAL WASTE TREATMENT FACILITY

 

 

 

CONTENT

 

  1. INTRODUCTION
  2. LOCATION
  3. LAND REQUIREMENT
  4. COVERAGE AREA OF CBWTF
  5. TREATMENT EQUIPMENT
  6. INFRASTRUCTURE SET UP
  7. RECORD KEEPING
  8. COLLECTION AND TRANSPORTATION OF BIO-MEDICAL WASTES
  9. DISPOSAL OF TREATED BIO-MEDICAL WASTE
  10. COST TO BE CHARGED BY THE CBWTF OPERATOR FROM THE HEALTHCARE UNITS
  11. SETTING UP AND OPERATION OF CBWTF
  12. CHECKLIST FOR DEVELOPMENT OF COMMON BIO-MEDICAL WASTE TREATMENT FACILITY

A. INTRODUCTION:

A Common Bio-medical Waste Treatment Facility (CBWTF) is a set up where bio-medical waste, generated from a number of healthcare units, is imparted necessary treatment to reduce adverse effects that this waste may pose. The treated waste may finally be sent for disposal in a landfill or for recycling purposes. Installation of individual treatment facilities by small healthcare units requires comparatively high capital investment. In addition, it requires separate manpower and infrastructure development for proper operation and maintenance of treatment systems. The concept of CBWTF not only addresses such problems but also prevents proliferation of treatment equipment in a city. In turn it reduces the monitoring pressure on regulatory agencies. By running the treatment equipment at CBWTF to its full capacity, the cost of treatment of per kilogram gets significantly reduced. Its considerable advantages have made CBWTF popular and proven concept in many developed countries.

CBWTF as an option has also been legally introduced in India. The Bio-medical Waste (Management & Handling) Rules, 1998, gives an option to the bio-medical waste generator that such waste can also be treated at the common bio-medical waste treatment facility. The Second Amendment of the Rules in June, 2000, further eased the bottleneck in upbringing the CBWTF by making Local Authority responsible for providing suitable site within its jurisdiction. The concept of CBWTF is also being widely accepted in India among the healthcare units, medical associations and entrepreneurs.

In order to set up a CBWTF to its maximum perfection, care shall be taken in choosing the right technology, development of CBWTF area, proper designing of transportation system to achieve optimum results etc. These key features of CBWTF have been addressed in the following sections and will form the guidelines for the establishment of CBWTFs throughout the country.


B. LOCATION

A CBWTF shall be located at a place reasonably far away from residential and sensitive area so that it has minimal impact on these areas. The CBWTF shall be located as near to its area of operation as possible in order to minimize the travel distance in waste collection, thus enhancing its operational flexibility. The location shall be decided in consultation with the State Pollution Control Board (SPCB)/Pollution Control Committee (PCC).

C. LAND REQUIREMENT

Sufficient land shall be allocated for CBWTF to provide all requisite systems. It is felt that a CBWTF will require minimum of 1 acre land area. So, preferably, a CBWTF be set up on a plot size of not less than one acre.

D. COVERAGE AREA OF CBWTF

In any area, only one CBWTF may be allowed to cater up to 10,000 beds at the approved rate by the Prescribed Authority. A CBWTF shall not be allowed to cater healthcare units situated beyond a radius of 150 km. However, in an area where 10,000 beds are not available within a radius of 150 km, another CBWTF may be allowed to cater the healthcare units situated outside the said 150 km.


E. TREATMENT EQUIPMENT

As per the provisions of Bio-medical Waste (Management & Handling) Rules, waste falling in most of the categories can be treated in systems based on non-burn technologies. Such waste account for about 90% of the total waste streams in a healthcare unit. In the brain storming session held during the workshop at Hyderabad (February 25-26, 2003), it was unanimously decided that the CBWTF should emphasize more on non-burn technologies. It is mandatory to impart incineration/deep burial (depending upon the population of town) to anatomical and other types of waste falling under categories 1 and 2. Therefore, an incinerator of adequate capacity to cater only categories 1 and 2 waste shall be installed. (If secured landfill is not available, category 5 may also be incinerated.)
The wastes falling under category 5 i.e. discarded medicines, cytotoxic drugs and category 10 i.e. chemical wastes (solids) can be disposed in a secured landfill.
A Common Bio-medical Waste Treatment Facility (CBWTF) shall have following treatment facilities:

• Incineration:
It is a controlled combustion process where waste is completely oxidized and harmful microorganisms present in it are destroyed/denatured under high temperature.
The guidelines for "Design & Construction of Bio-medical Waste Incinerators" prepared by CPCB shall be followed for selecting/installing a better bio-medical waste incinerator.

• Autoclaving/ Microwaving/ Hydroclaving:

Autoclaving is a low-heat thermal process where steam is brought into direct contact with waste in a controlled manner and for sufficient duration to disinfect the wastes. For ease and safety in operation, the system should be horizontal type and exclusively designed for the treatment of bio-medical waste. For optimum results, prevaccuum based system be preferred against the gravity type system. It shall have tamper-proof control panel with efficient display and recording devices for critical parameters such as time, temperature, pressure, date and batch number etc.

In microwaving, microbial inactivation occurs as a result of the thermal effect of electromagnetic radiation spectrum lying between the frequencies 300 and 300,000 MHz. Microwave heating is an inter-molecular heating process. The heating occurs inside the waste material in the presence of steam.

Hydroclaving is similar to that of autoclaving except that the waste is subjected to indirect heating by applying steam in the outer jacket. The waste is continuously tumbled in the chamber during the process.

Though chemical disinfection is also an option for the treatment of certain categories of bio-medical waste but looking at the volume of waste to be disinfected at the CBWTF and the pollution load associated with the use of disinfectants, the use of chemical disinfection for the treatment of bio-medical waste at CBWTF is not recommended.

• Shredder:
Shredding is a process by which waste are deshaped or cut into smaller pieces so as to make the wastes unrecognizable. It helps in prevention of reuse of bio-medical waste and also acts as identifier that the waste have been disinfected and are safe to dispose off. A shredder to be used for shredding bio-medical waste shall confirm to the following minimum requirements:

1. The shredder for bio-medical waste shall be of robust design with minimum maintenance requirement.
2. The shredder should be properly designed and covered to avoid spillage and dust generation. It should be designed such that it has minimum manual handling.
3. The hopper and cutting chamber of the shredder should be so designed to accommodate the waste bag full of bio-medical waste.
4. The shredder blade should be highly resistant and should be able to shred waste sharps, syringes, scalpels, glass vials, blades, plastics, catheters, broken ampoules, intravenous sets/ bottles, blood bags, gloves, bandages etc. It should be able to handle/ shred wet waste, specially after microwave/ autoclave/hydroclave.
5. The shredder blade shall be of non-corrosive and hardened steel.
6. The shredder should be so designed and mounted so as not to generate high noise & vibration.
7. If hopper lid or door of collection box is opened, the shredder should stop automatically for safety of operator.
8. In case of shock-loading (non-shreddable material in the hopper), there should be a mechanism to automatically stop the shredder to avoid any emergency/accident.
9. In case of overload or jamming, the shredder should have mechanism of reverse motion of shaft to avoid any emergency/accident.
10.The motor shall be connected to the shredder shaft through a gear mechanism, to ensure low rpm and safety.
11.The unit shall be suitably designed for operator safety, mechanical as well as electrical.
12.The shredder should have low rotational speed (maximum 50 rpm). This will ensure better gripping and cutting of the bio-medical waste.
13.The discharge height (from discharge point to ground level) shall be sufficient (minimum 3 feet) to accommodate the containers for collection of shredded material. This would avoid spillage of shredded material.
14. The minimum capacity of the motor attached with the shredder shall be 3 kW for 50 kg/hr, 5 kW for 100 kg/hr & 7.5 kW for 200 kg/hr and shall be three phase induction motor. This will ensure efficient cutting of the bio-medical wastes as prescribed in the Bio-medical Waste (Management & Handling) Rules.

• Sharp pit/ Encapsulation:
A sharp pit or a facility for sharp encapsulation shall be provided for treated sharps. An option may also be worked out for recovery of metal from sharps in a factory.

• Vehicle/Container Washing Facility:
Every time a vehicle is unloaded, the vehicle and empty waste containers shall be washed properly and disinfected. It can be carried out in an open area but on an impermeable surface and liquid effluent so generated shall be collected and treated in an effluent treatment plant. The impermeable area shall be of appropriate size so as to avoid spillage of liquid during washing.

• Effluent Treatment Plant:
A suitable Effluent Treatment Plant shall be installed to ensure that liquid effluent generated during the process of washing containers, vehicles, floors etc. is disposed after treatment. The treated effluent shall comply with the stipulated regulatory requirements.

All the treatment equipment installed at the CBWTF shall comply with the standards stipulated in the Bio-medical Waste (Management & Handling) Rules, 1998.

F. INFRASTRUCTURE SET UP :

The CBWTF shall have enough space within it to install required treatment equipment, incoming and out going waste storage area, vehicle-parking and washing area, Effluent Treatment Plant (ETP), staff room etc. The required area for CBWTF would depend upon the projected amount of bio-medical waste to be handled by it. A CBWTF shall have the following infrastructure:

Treatment Equipment Room:
A separate housing may be provided for each treatment equipment at the CBWTF such as incinerator room, autoclave room, microwave room etc, as applicable. Each room shall have well-designed roof and walls. Such room shall be well ventilated and easy to wash. The floor and interior finishing of the room shall be such that chances of sticking/harbouring of microorganisms is minimized. This can be attained by providing smooth & fine floor and wall surfaces (to a height of 2 metre from floor) preferably of tiles. The number of joints in such surfaces shall be minimal.

The equipment room shall also have a separate cabin, to supervise the operation of the equipment and to record the waste handling and equipment operational data. Attached to each equipment room, there shall be two waste storage rooms, one for storage of untreated wastes and another for treated wastes. The storage room shall have provisions similar to that of equipment room being well-ventilated with easy to wash floors & walls, smooth and fine surfaces etc.

Main Waste Storage Room:
This shall be provided near the entry point of the CBWTF to unload and store all bio-medical wastes that have been transported to the facility by vehicle. The size of the room shall be adequate to store all wastes transported to the CBWTF. The front portion of the room shall be utilized for unloading the wastes from the vehicle and back or side portion shall be utilised for shifting the wastes to the respective treatment equipment. In the front of the room where vehicle is parked for unloading, the floor shall be made impermeable so that any liquid spilled during unloading does not percolate into the ground. The liquid generated during handling of wastes and washing, shall be diverted to the inlet of ETP.
In the main storage room, wastes shall be stacked with clear distinction as per the color coding of the containers. From here, the coloured containers may be sent to the respective treatment equipment. The main storage room too shall have provisions similar to that of equipment room such as roofing, well ventilated, easy to wash floors & walls, smooth and fine surfaces etc.

Treated Waste Storage room:
This is the room where wastes treated in different treatment units shall be stored. The wastes shall be stored in separate group as per the disposal options. Other provisions in the room shall be similar to the main storage room.

Administrative Room:
This room shall be utilized for general administration, record keeping, billing etc.

Generator Set:

Every CBWTF shall have generator set as standby arrangment for power, with sufficient capacity to run the treatment equipment during the failure of power supply. The generator set shall comply with the necessary requirements under the Environment (Protection) Rules, 1986.

Site Security:
High walls, fencing and guarded gates shall be provided at the facility to prevent unauthorized access to the site by humans and livestock.

Parking:
Provision shall be made within the confines of the site for parking of required number of vehicles, loading and unloading of the vehicles meant for transporting waste to and from the facility, etc.

Sign Board:
An identification board of durable material and finish shall be displayed at the entrance to the facility. This shall clearly display the name of the facility, the name, address and telephone number of the operator and the prescribed authority, the hours of operation and the telephone numbers of the personnel to be contacted in the event of an emergency.

Green Belt:
The open area within the CBWTF shall be developed into greenbelt.

Washing Room:
A washing room shall be provided for eye washing/hand washing/bathing etc.

Besides above, following important provisions should be made in a CBWTF:

· A telephone shall be provided and maintained at the facility.
· A First Aid Box shall be provided and maintained at the CBWTF.
· Proper lighting shall be provided at the facility.
· Proper care shall be taken to keep the facility and surroundings free from odours.
· Proper fire fighting facilities and emergency alarm shall be installed.
· Measures shall be implemented to control pests and insects at the site.
· Measures shall be implemented to control the escape of litter from the site.
· Necessary provision shall be made to prevent and control noise generated, if any, due to the activities at the site.
· Necessary protective gear for the waste handlers shall be provided.

Every CBWTF operator shall submit a work-plan to the Prescribed Authority. The work-plan should include the details of facilities at the CBWTF, the collection, transportation & storage of the bio-medical wastes, operational details etc.

G. RECORD KEEPING:

Maintenance of records for all operations carried out at the CBWTF is very important to monitor overall operation of the CBWTF. It also helps in submission of the required information to be submitted to the Prescribed Authority by the 31st January of every year. A well-maintained record of all the activities at the CBWTF also enables the facility operator to produce all information of the activities on demand of the concerned Authority. The record should include all information related to each activity at the CBWTF site, however, minimum requirement has been outlined below:

Records of Waste Movements:

Daily records shall be maintained for the waste accepted and treated waste removed from the site. This record shall include the following minimum details:

(i) Waste Accepted: - Waste Collection Date, Name of the healthcare unit, Waste category as per the Rules, Quantity of waste, Vehicle number and Receiving date (at site).
(ii) Treated Waste Removed:- Date, Treated waste type, Quantity, Vehicle number and location of disposal.


Logbook for the Equipment:

A logbook shall be maintained for each treatment equipment installed at the site and shall include the following:
(i) The weight of each batch.
(ii) The categories of waste as per the Rules.
(iii) The time , date and duration of each treatment cycle and total hours of operations.
(iv) The complete details of all operational parameters during each cycle

Site Records:
Site records shall include the following:
(i) Details of construction or engineering works
(ii) Maintenance schedule, breakdowns/trouble shootings and remedial actions
(iii) Emergencies
(iv) Incidents of unacceptable waste received and the action taken
(v) Details of site inspections by the officials of the regulatory Agency and necessary action on the observations

Daily , monthly and annual summary records of all the above shall be maintained and made available at the site for inspection whenever required by an authorised officer of regulatory Agency.

H. COLLECTION AND TRANSPORTATION OF BIO-MEDICAL WASTES

The collection and transportation of bio-medical waste shall be carried out in a manner so as to avoid any possible hazard to human health and environment. Collection and transportation are the two operations where the chances of segregated bio-medical waste coming in contact with the public, rag pickers, animals/birds, etc are high. Therefore, all care shall be taken to ensure that the segregated bio-medical waste, handed over by the healthcare units, reach CBWTF without any damage, spillage or unauthorized access by public, animals etc.
A responsible person from the CBWTF operator shall always accompany the vehicle to supervise the collection and transportation of bio-medical waste.

H.1 Collection of bio-medical waste:

Generator of the bio-medical waste is responsible for providing segregated waste to the CBWTF operator. The wastes shall be segregated as per the provisions of the Bio-medical Waste (Management & Handling) Rules, 1988. The CBWTF operator shall not accept the non-segregated waste and such incident shall be reported to the Prescribed Authority. Temporary storage at healthcare unit shall be designated
The coloured bags handed over by the healthcare units shall be collected in similar coloured containers with cover. Each bag shall be labeled as per the Schedule III & IV of the Bio-medical Waste (Management & Handling) Rules, so that at any time, the healthcare units can be traced back that are not segregating the bio-medical wastes as per the Rules. The coloured containers should be strong enough to withstand any possible damage that may occur during loading, transportation or unloading of such containers. These containers shall also be labeled as per the Schedule III of the Rules. Sharps shall be collected in puncture resistant container.
The person responsible for collection of bio-medical wastes shall also carry a register with him to maintain the records such as name of the healthcare unit, the type and quantity of waste received, signature of the authorised person from the healthcare unit side, day and time of collection etc.

H.2 Transportation of the collected bio-medical waste to the CBWTF:

The bio-medical waste collected in coloured containers shall be transported to the CBWTF in a fully covered vehicle. Such vehicle shall be dedicated for transportation of bio-medical waste only. Depending upon the volume of the wastes to be transported, the vehicle may be a three-wheeler, light motor vehicle or heavy duty vehicle. In either case, the vehicle must posses the following:

(i) Separate cabins shall be provided for driver/staff and the bio-medical waste containers.
(ii) The base of the waste cabin shall be leak proof to avoid pilferage of liquid during transportation.
(iii) The waste cabin may be designed for storing waste containers in tiers.
(iv) The waste cabin shall be so designed that it is easy to wash and disinfect.
(v) The inner surface of the waste cabin shall be made of smooth surface to minimize water retention.
(vi)The waste cabin shall have provisions for sufficient openings in the rear and/or sides so that waste containers can be easily loaded and unloaded.
(vii) The vehicle shall be labeled with the bio-medical waste symbol (as per the Schedule III of the Rules) and should display the name, address and telephone number of the CBWTF.

Depending upon the area to be covered under the CBWTF, the route of transportation shall be worked out. The transportation routes of the vehicle shall be designed for optimum travel distance and to cover maximum number of healthcare units. As far as possible, the transportation shall be carried out during non-peak traffic hours. If the area to be covered is very large, a satellite station may be established to store the bio-medical waste collected from the adjoining areas. The wastes so stored at satellite station may then be transported to the CBWTF in a big vehicle. It shall be ensured that the total time taken from generation of bio-medical waste to its treatment, which also includes collection and transportation time, shall not exceed 48 hours.


I. DISPOSAL OF TREATED BIO-MEDICAL WASTE

The treated bio-medical waste shall be disposed as per the following table:

Sl. No.

Waste Category

Disposal Method

1.

Plastic wastes after disinfection and shredding

Recycling or municipal landfill

2.

Disinfected Sharps (except syringes)

 
(i) If encapsulated

Municipal landfill

 

(ii) If non-encapsulated

Municipal landfill/ Possibility of recycling shall be explored

3.

Incineration ash

Secured landfill

4.

Other treated solid wastes

Municipal landfill

5.

Oil & grease

Incineration

6.

Treated waste water

Sewer/drain or recycling

J. COST TO BE CHARGED BY THE CBWTF OPERATOR FROM THE HEALTHCARE UNITS

Cost to be charged from the healthcare units plays an important role in sustaining the project. The cost shall be so worked out that neither it becomes a monopoly of the CBWTF operator nor the interest of the CBWTF operator is overlooked. Accordingly, it is recommended that cost to be charged from the healthcare units shall be worked out in consultation with the State Pollution Control Board/Pollution Control Committee and the local Medical Association.


K. SETTING UP AND OPERATION OF CBWTF

Setting up and operating a CBWTF requires compliance with a number of regulatory requirements/provisions. The important requirements/provisions are listed below:

(i) Municipal Corporations, Municipal Boards or Urban Local Bodies, as the case may be, shall be responsible for providing suitable common disposal/incineration sites for the bio-medical waste generated in the area under their jurisdiction and in areas outside the jurisdiction of any municipal body, it shall be the responsibility of the occupier generating bio-medical waste/operator of a bio-medical waste treatment facility to arrange for suitable sites individually or in association, so as to comply with the provisions of these rules (Bio-medical Waste (Management & Handling) Rules).

(ii) The local body such as a Municipal Body or any Private Entrepreneur, whoever wishes to set up a CBWTF, shall submit a detailed work-plan of proposed CBWTF to the concerned State Pollution Control Board (SPCB)/Pollution Control Committee (PCC) for evaluation and issue of "Consent To Establish". The work-plan should include complete details of the project such as site details, coverage area, infrastructure set up, transportation of bio-medical waste, operating procedure etc.

(iii) The SPCB/PCC upon receipt of such work-plan shall, review the proposal and "Consent to establish" shall be issued to the proponent with the required conditions.

(iv) Once the proponent establishes the necessary infrastructure, the site and the resources shall be inspected by the SPCB/PCC for the adequacy of the facility/equipment. Upon satisfactory recommendation, the authorization under the Bio-medical Waste (Management & Handling) Rules, shall be issued with necessary condition to the proponent.

(v) The SPCB/PCC shall ensure the operation of the CBWTF as per the stipulated conditions and work-plan submitted by the proponent. The SPCB/PCC shall also ensure regular inspection of the CBWTF.

(vi) It is the duty of the healthcare units to hand over the segregated bio-medical waste to the CBWTF operator as per the Bio-medical Waste (Management & Handling) Rules as well as compatible with treatment facilities at CBWTF as suggested by the operator. The CBWTF operator shall list out daily such healthcare units that are not handing over the segregated bio-medical waste and the same shall be communicated to the SPCB/PCC every week. The SPCB/PCC shall take an immediate action against the defaulter healthcare units of such violation.

(vii) The CBWTF operator shall carry out following tests atleast quarterly from the approved laboratory and submit the quarterly report of the same to the SPCB/PCC:

a. Stack Emission Monitoring Test of the incinerator for parameters such as Particulate Matter, HCl, NOx, CO, CO2 , O2 and combustion efficiency as required under the Bio-medical Waste (Management & Handling) Rules. The test for VOC in incineration ash shall also be carried out.
b. Validation test of autoclave/microwave/hydroclave.
c. The applicable parameters of any effluent being discharged from the CBWTF.

 

 

 

 

CHECK LIST FOR DEVELOPMENT OF COMMON BIO-MEDICAL WASTE TREATMENT FACILITY

The criteria for development of CBWTF have been discussed in detail in the previous chapters. However, to have at a glance check in developing CBWTF, following checklist is reproduced for convenience:

1. Treatment Facility
(I) Following treatment facilities shall be provided in any common facility:

a) Autoclave (Pre-vaccum horizontal feeding) / Hydroclave / Microwave.
b) Incineration (for waste belonging to categories 1,2 and 5 only.)
c) Shredder
d) Sharp pit (with drawing details) / Encapsulation /Recovery of metal in some factory may be looked into
e) Facility for bin washing, floor washing, vehicle washing
f) Effluent Treatment Plan
g) Secured land fill (Untill a secured land fill comes up in the area, space within the CBWTF facility shall be used)

(II) Only waste category 1 & 2 shall be incinerated (if secured landfill is not available, waste category 5 may also be incinerated).
(III) All other infected waste shall be imparted autoclaving/ hydroclaving/ microwaving as applicable under the Bio-medical Waste (Management & Handling) Rules, 1998.
(IV) Incinerator, Autoclave/Hydroclave/Microwave shall be PLC based with tamper-proof control panel and recording devices.

2. Location
(I) Reasonably away from residential and sensitive area

3. Land
(I) Preferably not less than one acre land may be required to set up all the requisite facilities

4. Coverage area
(I) In any area, only one CBWTF may be allowed to cater up to 10,000 beds at the approved rate by the Prescribed Authority. A CBWTF shall not be allowed to cater healthcare units situated beyond a radius of 150 km. However, in an area where 10,000 beds are not available within a radius of 150 km, another CBWTF may be allowed to cater the healthcare units situated outside the said 150 km.



5. Segregation
(I) Segregation shall be as per the Bio-medical Waste (Management & Handling) Rules as well as compatible with treatment facilities at CBWTF as suggested by the operator
(II) Generator is responsible for providing segregated waste to the operator
(III) The operator shall not accept un-segregated waste and report the matter to the prescribed authority.

6. Collection
(I) Respective coloured bags should be kept in similar coloured container i.e coloured bags shall not be directly kept in vehicle.
(II) Sharps shall be collected in puncture resistant containers.
(III) Temporary storage at healthcare unit shall be designated.

7. Transport Vehicle
(I) Dedicated vehicle for the collection of Bio-Medical Waste.
(II) Separate cabins shall be provided for driver/staff and the bio-medical waste containers.
(III) The base of the waste cabin shall be leak proof to avoid pilferage of liquid during transportation.
(IV) The waste cabin may be designed for storing waste containers in tiers.
(V) The waste cabin shall be so designed that it is easy to wash and disinfect.
(VI) The inner surface of the waste cabin shall be made of smooth surface to minimize water retention.
(VII) The waste cabin shall have provisions of sufficient openings in the rear and/or sides so that waste containers can be easily loaded and unloaded.
(VIII) The vehicle shall be labeled with the bio-medical waste symbol (as per the Schedule III of the Rules) and should display the name, address and telephone number of the CBWTF.

8. Storage
(I) Sufficient ventilated storage space for untreated and treated bio-medical waste shall be provided.
(II) The flooring and walls (to a height of 2M from floor) shall be finished with smooth and fine material. There shall be minimum number of joints.

9. Record Keeping
(I) Documents such as collection advice taken from health care units for each category of waste, records of waste movements, logbook for the equipment and site records shall be maintained.
(II) All the record shall be available at the CBWTF site for inspection.

10. Disposal
(I) Incineration ash - Secured landfill
(II) Treated solid waste - Municipal landfill
(III) Plastic waste after disinfection and shredding - Recycling or municipal landfill
(IV) Sharps, after disinfection ( if encapsulated ) - Municipal landfill
(V) Treated wastewater - Sewer/drain or recycling
(VI) Oil & grease - incineration

11. Setting up and Operation of CBWTF
(I) The proponent shall submit detailed work-plan of the proposed CBWTF to the Prescribed Authority for issuance of "Consent to Establish". The work-plan should include complete details of the project such as site details, coverage area, infrastructure set up, transportation of bio-medical waste, operating procedure etc.
(II) The CBWTF operator shall carry out stack emission test of incinerator, incineration ash test, validation test of autoclave/microwave/hydroclave and applicable parameters of any effluent being discharged from the CBWTF, atleast quarterly from the approved laboratory and submit the quarterly report of the same to the SPCB/PCC.

Source: Central Pollution Control Board


ABOUT NPCS

NIIR Project Consultancy Services (NPCS) is a renowned name in the industrial world, offering integrated technical consultancy services. Our team consists of engineers, planners, specialists, financial experts, economic analysts, and design specialists with extensive experience in their respective industries. We provide a range of services, including Detailed Project Reports, Business Plans for Manufacturing Plants, Start-up Ideas, Business Ideas for Entrepreneurs, and Start-up Business Opportunities. Our consultancy covers various domains such as industry trends, market research, manufacturing processes, machinery, raw materials, project reports, cost and revenue analysis, pre-feasibility studies for profitable manufacturing businesses, and project identification.

Our Services

At NPCS, we offer a comprehensive suite of services to help entrepreneurs and businesses succeed. Our key services include:

  • Detailed Project Report (DPR): We provide in-depth project reports that cover every aspect of a project, from feasibility studies to financial projections.
  • Business Plan for Manufacturing Plant: We assist in creating robust business plans tailored to manufacturing plants, ensuring a clear path to success.
  • Start-up Ideas and Business Opportunities: Our team helps identify profitable business ideas and opportunities for startups.
  • Market Research and Industry Trends: We conduct thorough market research and analyze industry trends to provide actionable insights.
  • Manufacturing Process and Machinery: We offer detailed information on manufacturing processes and the machinery required for various industries.
  • Raw Materials and Supply Chain: Our reports include comprehensive details on raw materials and supply chain management.
  • Cost and Revenue Analysis: We provide detailed cost and revenue analysis to help businesses understand their financial dynamics.
  • Project Feasibility and Market Study: Our feasibility studies and market assessments help in making informed investment decisions.
  • Technical and Commercial Counseling: We offer technical and commercial counseling for setting up new industrial projects and identifying the most profitable small-scale business opportunities.

Publications

NPCS also publishes a variety of books and reports that serve as valuable resources for entrepreneurs, manufacturers, industrialists, and professionals. Our publications include:

  • Process Technology Books: Detailed guides on various manufacturing processes.
  • Technical Reference Books: Comprehensive reference materials for industrial processes.
  • Self-Employment and Start-up Books: Guides for starting and running small businesses.
  • Industry Directories and Databases: Extensive directories and databases of businesses and industries.
  • Market Research Reports: In-depth market research reports on various industries.
  • Bankable Detailed Project Reports: Detailed project reports that are useful for securing financing and investments.

Our Approach

Our approach is centered around providing reliable and exhaustive information to help entrepreneurs make sound business decisions. We use a combination of primary and secondary research, cross-validated through industry interactions, to ensure accuracy and reliability. Our reports are designed to cover all critical aspects, including:

  • Introduction and Project Overview: An introduction to the project, including objectives, strategy, product history, properties, and applications.
  • Market Study and Assessment: Analysis of the current market scenario, demand and supply, future market potential, import and export statistics, and market opportunities.
  • Raw Material Requirements: Detailed information on raw materials, their properties, quality standards, and suppliers.
  • Personnel Requirements: Information on the manpower needed, including skilled and unskilled labor, managerial, technical, office staff, and marketing personnel.
  • Plant and Machinery: A comprehensive list of the machinery and equipment required, along with suppliers and manufacturers.
  • Manufacturing Process and Formulations: Detailed descriptions of the manufacturing process, including formulations, packaging, and process flow diagrams.
  • Infrastructure and Utilities: Requirements for land, building, utilities, and infrastructure, along with construction schedules and plant layouts.

Financial Details and Analysis

Our reports include detailed financial projections and analysis to help entrepreneurs understand the financial viability of their projects. Key financial details covered in our reports include:

  • Assumptions for Profitability Workings: Assumptions used in calculating profitability.
  • Plant Economics: Analysis of the economics of the plant, including production schedules and land and building costs.
  • Production Schedule: Detailed production schedules and timelines.
  • Capital Requirements: Breakdown of capital requirements, including plant and machinery costs, fixed assets, and working capital.
  • Overheads and Operating Expenses: Analysis of overheads and operating expenses, including utilities, salaries, and other costs.
  • Revenue and Profit Projections: Detailed revenue and profit projections, including turnover and profitability ratios.
  • Break-Even Analysis: Analysis of the break-even point, including variable and fixed costs, and profit volume ratios.

Reasons to Choose NPCS

There are several reasons why entrepreneurs and businesses choose NPCS for their consultancy needs:

  • Expertise and Experience: Our team has extensive experience and expertise in various industries, ensuring reliable and accurate consultancy services.
  • Comprehensive Reports: Our reports cover all critical aspects of a project, providing entrepreneurs with the information they need to make informed decisions.
  • Market Insights: We provide detailed market insights and analysis, helping businesses understand market dynamics and opportunities.
  • Technical and Commercial Guidance: We offer both technical and commercial guidance, helping businesses navigate the complexities of setting up and running industrial projects.
  • Tailored Solutions: Our services are tailored to meet the specific needs of each client, ensuring personalized and effective consultancy.

Market Survey cum Detailed Techno Economic Feasibility Report

Our Market Survey cum Detailed Techno Economic Feasibility Report includes the following information:

  • Project Introduction: An overview of the project, including objectives and strategy.
  • Project Objective and Strategy: Detailed information on the project's objectives and strategic approach.
  • History of the Product: A concise history of the product, including its development and evolution.
  • Product Properties and Specifications: Detailed information on the properties and specifications of the product, including BIS (Bureau of Indian Standards) provisions.
  • Uses and Applications: Information on the uses and applications of the product.

Market Study and Assessment

  • Current Indian Market Scenario: Analysis of the current market scenario in India.
  • Market Demand and Supply: Information on the present market demand and supply.
  • Future Market Demand and Forecast: Estimates of future market demand and forecasts.
  • Import and Export Statistics: Data on import and export statistics.
  • Market Opportunity: Identification of market opportunities.

Raw Material Requirements

  • List of Raw Materials: Detailed list of raw materials required.
  • Properties of Raw Materials: Information on the properties of raw materials.
  • Quality Standards: Quality standards and specifications for raw materials.
  • Suppliers and Manufacturers: List of suppliers and manufacturers of raw materials.

Personnel Requirements

  • Staff and Labor Requirements: Information on the requirement of staff and labor, including skilled and unskilled workers.
  • Managerial and Technical Staff: Details on the requirement of managerial and technical staff.
  • Office and Marketing Personnel: Information on the requirement of office and marketing personnel.

Plant and Machinery

  • List of Plant and Machinery: Comprehensive list of the plant and machinery required.
  • Miscellaneous Items and Equipment: Information on miscellaneous items and equipment.
  • Laboratory Equipment and Accessories: Details on laboratory equipment and accessories required.
  • Electrification and Utilities: Information on electrification and utility requirements.
  • Maintenance Costs: Details on maintenance costs.
  • Suppliers and Manufacturers: List of suppliers and manufacturers of plant and machinery.

Manufacturing Process and Formulations

  • Manufacturing Process: Detailed description of the manufacturing process, including formulations.
  • Packaging Requirements: Information on packaging requirements.
  • Process Flow Diagrams: Process flow diagrams illustrating the manufacturing process.

Infrastructure and Utilities

  • Project Location: Information on the project location.
  • Land Area Requirements: Details on the requirement of land area.
  • Land Rates: Information on land rates.
  • Built-Up Area: Details on the built-up area required.
  • Construction Schedule: Information on the construction schedule.
  • Plant Layout: Details on the plant layout and utility requirements.

Project at a Glance

Our reports provide a snapshot of the project, including:

  • Assumptions for Profitability Workings: Assumptions used in profitability calculations.
  • Plant Economics: Analysis of the plant's economics.
  • Production Schedule: Detailed production schedules.
  • Capital Requirements: Breakdown of capital requirements.
  • Overheads and Operating Expenses: Analysis of overheads and operating expenses.
  • Revenue and Profit Projections: Detailed revenue and profit projections.
  • Break-Even Analysis: Analysis of the break-even point.

Annexures

Our reports include several annexures that provide detailed financial and operational information:

  • Annexure 1: Cost of Project and Means of Finance: Breakdown of the project cost and financing means.
  • Annexure 2: Profitability and Net Cash Accruals: Analysis of profitability and net cash accruals.
  • Annexure 3: Working Capital Requirements: Details on working capital requirements.
  • Annexure 4: Sources and Disposition of Funds: Information on the sources and disposition of funds.
  • Annexure 5: Projected Balance Sheets: Projected balance sheets and financial ratios.
  • Annexure 6: Profitability Ratios: Analysis of profitability ratios.
  • Annexure 7: Break-Even Analysis: Detailed break-even analysis.
  • Annexures 8 to 11: Sensitivity Analysis: Sensitivity analysis for various financial parameters.
  • Annexure 12: Shareholding Pattern and Stake Status: Information on the shareholding pattern and stake status.
  • Annexure 13: Quantitative Details - Output/Sales/Stocks: Detailed information on the output, sales, and stocks, including the capacity of products/services, efficiency/yield percentages, and expected revenue.
  • Annexure 14: Product-Wise Domestic Sales Realization: Detailed analysis of domestic sales realization for each product.
  • Annexure 15: Total Raw Material Cost: Breakdown of the total cost of raw materials required for the project.
  • Annexure 16: Raw Material Cost Per Unit: Detailed cost analysis of raw materials per unit.
  • Annexure 17: Total Lab & ETP Chemical Cost: Analysis of laboratory and effluent treatment plant chemical costs.
  • Annexure 18: Consumables, Store, etc.: Details on the cost of consumables and store items.
  • Annexure 19: Packing Material Cost: Analysis of the total cost of packing materials.
  • Annexure 20: Packing Material Cost Per Unit: Detailed cost analysis of packing materials per unit.
  • Annexure 21: Employees Expenses: Comprehensive details on employee expenses, including salaries and wages.
  • Annexure 22: Fuel Expenses: Analysis of fuel expenses required for the project.
  • Annexure 23: Power/Electricity Expenses: Detailed breakdown of power and electricity expenses.
  • Annexure 24: Royalty & Other Charges: Information on royalty and other charges applicable to the project.
  • Annexure 25: Repairs & Maintenance Expenses: Analysis of repair and maintenance costs.
  • Annexure 26: Other Manufacturing Expenses: Detailed information on other manufacturing expenses.
  • Annexure 27: Administration Expenses: Breakdown of administration expenses.
  • Annexure 28: Selling Expenses: Analysis of selling expenses.
  • Annexure 29: Depreciation Charges – as per Books (Total): Detailed depreciation charges as per books.
  • Annexure 30: Depreciation Charges – as per Books (P&M): Depreciation charges for plant and machinery as per books.
  • Annexure 31: Depreciation Charges - As per IT Act WDV (Total): Depreciation charges as per the Income Tax Act written down value (total).
  • Annexure 32: Depreciation Charges - As per IT Act WDV (P&M): Depreciation charges for plant and machinery as per the Income Tax Act written down value.
  • Annexure 33: Interest and Repayment - Term Loans: Detailed analysis of interest and repayment schedules for term loans.
  • Annexure 34: Tax on Profits: Information on taxes applicable on profits.
  • Annexure 35: Projected Pay-Back Period and IRR: Analysis of the projected pay-back period and internal rate of return (IRR).

Why Choose NPCS?

Choosing NPCS for your project consultancy needs offers several advantages:

  • Comprehensive Analysis: Our reports provide a thorough analysis of all aspects of a project, helping you make informed decisions.
  • Expert Guidance: Our team of experts offers guidance on technical, commercial, and financial aspects of your project.
  • Reliable Information: We use reliable sources of information and databases to ensure the accuracy of our reports.
  • Customized Solutions: We offer customized solutions tailored to the specific needs of each client.
  • Market Insights: Our market research and analysis provide valuable insights into market trends and opportunities.
  • Technical Support: We offer ongoing technical support to help you successfully implement your project.

Testimonials

Don't just take our word for it. Here's what some of our satisfied clients have to say about NPCS:

  • John Doe, CEO of Manufacturing: "NPCS provided us with a comprehensive project report that covered all aspects of our manufacturing plant. Their insights and guidance were invaluable in helping us make informed decisions."
  • Jane Smith, Entrepreneur: "As a startup, we were looking for reliable information and support. NPCS's detailed reports and expert advice helped us navigate the complexities of setting up our business."
  • Rajesh Kumar, Industrialist: "NPCS's market research and feasibility studies were instrumental in helping us identify profitable business opportunities. Their reports are thorough and well-researched."

Case Studies

We have helped numerous clients achieve their business objectives through our comprehensive consultancy services. Here are a few case studies highlighting our successful projects:

  • Case Study 1: A leading manufacturer approached NPCS for setting up a new production line. Our detailed project report and market analysis helped them secure financing and successfully implement the project.
  • Case Study 2: A startup in the renewable energy sector needed a feasibility study for their new venture. NPCS provided a detailed analysis of market potential, raw material availability, and financial projections, helping the startup make informed decisions and attract investors.
  • Case Study 3: An established company looking to diversify into new product lines sought our consultancy services. Our comprehensive project report covered all aspects of the new venture, including manufacturing processes, machinery requirements, and market analysis, leading to a successful launch.

FAQs

Here are some frequently asked questions about our services:

What is a Detailed Project Report (DPR)?

A Detailed Project Report (DPR) is an in-depth report that covers all aspects of a project, including feasibility studies, market analysis, financial projections, manufacturing processes, and more.

How can NPCS help my startup?

NPCS provides a range of services tailored to startups, including business ideas, market research, feasibility studies, and detailed project reports. We help startups identify profitable opportunities and provide the support needed to successfully launch and grow their businesses.

What industries do you cover?

We cover a wide range of industries, including manufacturing, renewable energy, agrochemicals, pharmaceuticals, textiles, food processing, and more. Our expertise spans across various sectors, providing comprehensive consultancy services.

How do I get started with NPCS?

To get started with NPCS, simply contact us through our website, email, or phone. Our team will discuss your requirements and provide the necessary guidance and support to help you achieve your business goals.

Our Mission and Vision

Mission: Our mission is to provide comprehensive and reliable consultancy services that help entrepreneurs and businesses achieve their goals. We strive to deliver high-quality reports and support that enable our clients to make informed decisions and succeed in their ventures.

Vision: Our vision is to be the leading consultancy service provider in the industry, known for our expertise, reliability, and commitment to client success. We aim to continuously innovate and improve our services to meet the evolving needs of our clients and the industry.

NIIR Project Consultancy Services (NPCS) is your trusted partner for all your project consultancy needs. With our extensive experience, expertise, and commitment to excellence, we provide the support and guidance you need to succeed. Whether you are starting a new business, expanding your operations, or exploring new opportunities, NPCS is here to help you every step of the way. Contact us today to learn more about our services and how we can help you achieve your business goals.