GAS BASED POWER PLANT

PROJECT DESCRIPTION

Electricity is an essential requirement for all facets of our life. It has been recognized as a basic human need. It is a critical infrastructure on which the socio economic development of the country depends. Supply of electricity at reasonable rate to rural India is essential for its overall development. Equally important is availability of reliable and quality power at competitive rates to Indian industry to make it globally competitive and to enable it to exploit the tremendous potential of employment generation. Services sector has made significant contribution to the growth of our economy. Availability of quality supply of electricity is very crucial to sustained growth of this segment. Recognizing that electricity is one of the key drivers for rapid economic growth and poverty alleviation, the nation has set itself the target of providing access to all households in next five years. As per Census 2001, about 44% of the households do not have access to electricity. Hence meeting the target of providing universal access is a daunting task requiring significant addition to generation capacity and expansion of the transmission and distribution network. Indian Power sector is witnessing major changes. Growth of Power Sector in India since its Independence has been noteworthy. However, the demand for power has been outstripping the growth of availability. The National Electricity Policy aims at achieving the following objectives such as viability of Power - Demand to be fully met by 2012. The energy and peaking shortages will be overcome and adequate spinning reserve to be available and supply of reliable and quality power of specified standards in an efficient manner and at reasonable rates. The per capita availability of electricity is to be increased to over 1000 units by 2012 and many more. The gigantic task of rural electrification requires appropriate cooperation among various agencies of the State Governments, Central Government and participation of the community. Education and awareness programmers would be essential for creating demand for electricity and for achieving the objective of effective community participation. Inadequacy of generation has characterized power sector operation in India. To provide availability of over 1000 units of per capita electricity by year 2012 it had been estimated that need based capacity addition of more than 1,00,000 MW would be required during the period 2002-12. The Government of India has initiated several reform measures to create a favorable environment for addition of new generating capacity in the country. The progress of implementation of capacity addition plans and growth of demand would need to be constantly monitored and necessary adjustments made from time to time. In creating new generation capacities, appropriate technology may be considered keeping in view the likely widening of the difference between peak demand and the base load. Gas based power Plants are clean fuel power projects, which uses natural gas as a fuel for power generation and can distribute in grids. Since the Carbon Dioxide (CO2) emission due to combustion of natural gas is substantially less as compared to combustion of coal, lignite or naphtha thus helps in reducing GHG emission. Indian economy is highly dependent on Coal as fuel to generate energy and for production processes. Thermal Power Plants are the major consumers of Coal in India, and yet the basic power needs of a large section of society are not being met. This results in excessive demands for electricity and places immense stress on the environment. Changing coal consumption patterns will require a multi pronged strategy focusing on demand, reducing wastage of energy and the optimum use of Clean Energy Sources like Natural Gas. A gas based power plant has excellent environmental benefits in terms of reduction in carbon emissions and coal resource conservation. Also, gas based power plants would not lead to production of huge quantities of solid waste (like ash in thermal power plants) and hence reduces the burden of solid waste disposal. There is a very good scope in the power sector and new entrepreneurs should venture into this field. Few Indian Major Players are as under: A D Hydro Power Ltd. Aban Energies Ltd. Aban Power Co. Ltd. Abohar Power Generation Ltd. Adani Power Dahej Ltd. Adani Power Ltd. Adani Power Maharashtra Ltd. Adani Power Rajasthan Ltd. Alaknanda Hydro Power Co. Ltd. Almi Hydro-Electric Projects Ltd. Andhra Pradesh Gas Power Corpn. Ltd. Andhra Pradesh Power Generation Corpn. Ltd. Ansal A P I Power Ltd. Arasmeta Captive Power Co. Pvt. Ltd. Asia Bioenergy (India) Ltd. Asian Renewable Energy Pvt. Ltd. Atria Power Corpn. Ltd. Auro Energy Ltd. Avantha Power & Infrastructure Ltd. Ayyappa Hydro Power Ltd. B F Utilities Ltd. B P L Power Projects (A P) Pvt. Ltd. B S E S Kerala Power Ltd. Bahur Power Co. Pvt. Ltd. Baledh Energy Projects Ltd. Bhander Power Ltd. Bhartiya Rail Bijlee Co. Ltd. Bhilai Electric Supply Co. Pvt. Ltd. Bhilwara Energy Ltd. Bhoruka Power Corpn. Ltd. Bhushan Energy Ltd. Bina Power Supply Co. Ltd. Brahmanvel Energy Ltd. C E S C Ltd. Cauvery Hydro Energy Ltd. Central India Power Co. Ltd. Chambal Energy (Chhattisgarh) Ltd. Chambal Energy (Orissa) Ltd. Chhabra Power Ltd. Coastal Tamil Nadu Power Ltd. D C M Shriram Thermal Energy Ltd. D C W Power Corporation Ltd. D L F Power Ltd. D P S C Ltd. D S L Hydrowatt Ltd. Dabripada Energy Ltd. Dakshin Haryana Bijli Vitran Nigam Ltd. Damodar Valley Corpn. Dheeru Powergen Pvt. Ltd. Dholpur Gas Power Ltd. Divyansh Powergen Pvt. Ltd. Durgapur Projects Ltd. East West Power Generation Co. Ltd. Emco Energy Ltd. Emco Power Ltd. Empee Power Co. (India) Ltd. Enercon (India) Ltd. Enercon Wind Farms (Karnataka) Pvt. Ltd. Enercon Windfarms (India) Ltd. Energy Development Co. Ltd. Essar Electric Power Devp. Corpn. Ltd. Essar Power (Orissa) Ltd. Essar Power Ltd. Essar Power M P Ltd. Eswind Green Power Ltd. Facor Power Ltd. Finolex Energy Corpn. Ltd. G I Power Corpn. Ltd. G M R Energy Ltd. G M R Mining & Energy Pvt. Ltd. G M R Power Corpn. Pvt. Ltd. G S P C Pipavav Power Co. Ltd. G V K Gautami Power Ltd. G V K Industries Ltd. G V K Power & Infrastructure Ltd. G V K Power (Goindwal Sahib) Ltd. Gati Infrastructure Ltd. Ghogarpalli Integrated Power Co. Ltd. Giral Lignite Power Ltd. Global Energy Ltd. Goriganga Hydro Power Pvt. Ltd. Greenview Power Projects Ltd. Gujarat Energy Transmission Corpn. Ltd. Gujarat Industries Power Co. Ltd. Gujarat Paguthan Energy Corpn. Pvt. Ltd. Gujarat State Electricity Corpn. Ltd. Gujarat State Energy Generation Ltd. Gujarat Windfarms Ltd. Haryana Power Generation Corpn. Ltd. Hateshwari Om Power Enterprises Pvt. Ltd. Hemavathy Power & Light Pvt. Ltd. Himachal Pradesh State Electricity Board Himachal Sorang Power Pvt. Ltd. Hindustan Powergen Ltd. Hirakud Power Co. Ltd. I L & F S Wind Farms Ltd. Icomm Energy Ltd. Ind-Barath Energies Ltd. India Wind Power Ltd. Indiabulls Hydro Electric Power Ltd. Indiabulls Power Generation Ltd. Indiabulls Power Ltd. Indo Lahari Bio Power Ltd. Indowind Energy Ltd. Indraprastha Power Generation Co. Ltd. Industrial Energy Ltd. Industrial Power Infrastructure Ltd. Industrial Power Utility Ltd. Ispat Energy Ltd. J R Power Gen Pvt. Ltd. J S W Energy (Ratnagiri) Ltd. J S W Energy (Vijayanagar) Ltd. J S W Energy Ltd. Jaiprakash Power Ventures Ltd. Jalashaayi Alamparathodu Hydro Power Ltd. Jambhora Energy Projects Ltd. Jaypee Karcham Hydro Corpn. Ltd. Jaypee Powergrid Ltd. Jhabua Power Investments Pvt. Ltd. Jhabua Power Ltd. Jharkhand Integrated Power Ltd. Jindal India Power Ventures Ltd. Jindal India Thermal Power Ltd. Jindal Power Ltd. Joiner Hydro Power Projects Ltd. K P C Bidadi Power Corpn. Pvt. Ltd. K S K Dibbin Hydro Power Pvt. Ltd. K S K Narmada Power Co. Pvt. Ltd. K S K Vidarbha Power Co. Pvt. Ltd. Kamarhatty Power Ltd. Kameng Dam Hydro Power Pvt. Ltd. Kanti Bijlee Utpadan Nigam Ltd. Karma Energy Ltd. Karnataka Power Corpn. Ltd. Kasargod Power Corpn. Ltd. Kaveri Gas Power Ltd. Kaya Hydropower Projects Ltd. Kerala State Electricity Board Khandesh Energy Projects Ltd. Kinnera Power Co. Ltd. Konaseema Gas Power Ltd. Korba West Power Co. Ltd. Kurnool Power Projects Ltd. L & T Power Invsts. Pvt. Ltd. L & T Uttaranchal Hydropower Ltd. L V S Power Ltd. Lanco Green Power Pvt. Ltd. Lenus Power Ltd. M S M Energies Ltd. M S M Energy Ltd. Maa Usha Urja Ltd. Madkini Hydro Power Pvt. Ltd. Maharashtra State Electricity Board Maharashtra State Power Generation Co. Ltd. Maithon Power Ltd. Malana Power Co. Ltd. Malanpur Captive Power Ltd. Megha Technical & Engineers Pvt. Ltd. Meghalaya Power Ltd. Meghalaya State Electricity Board Meghmani Energy Ltd. Monnet Power Co. Ltd. Mundra Power Sez Ltd. Murdeshwar Power Corpn. Ltd. My Home Power Ltd. N C C Power Corpn. Ltd. N C C Power Projects Ltd. N H D C Ltd. N H P C Ltd. N L C Tamil Nadu Power Ltd. N S L Sugars Ltd. N T P C Hydro Ltd. N T P C Ltd. N T P C-S A I L Power Co. Pvt. Ltd. Nava Bharat Energy India Ltd. Nava Bharat Ventures Ltd. Neyveli Lignite Corpn. Ltd. Niskalp Energy Ltd. Non-Con Energies (India) Ltd. North Eastern Electric Power Corpn. Ltd. Northern Power Distribution Co. Of Andhra Pradesh Ltd. Nuclear Power Corpn. Of India Ltd. Om Shakthi Renergies Pvt. Ltd. Omaxe Powers Pvt. Ltd. Orient Green Power Co. Ltd. Orissa Hydro Power Corpn. Ltd. Orissa Integerated Power Ltd. Orissa Power Generation Corpn. Ltd. Patan Wind Energy Ltd. Patel Energy Ltd. Penna Electricity Ltd. Pentafour Solec Technology Ltd. Pioneer Wincon Pvt. Ltd. Pipavav Power Devp. Co. Ltd. Pragati Power Corpn. Ltd. Pravara Renewable Energy Ltd. Punjab Biomass Power Ltd. Punjab Genco Ltd. Punjab State Electricity Board R B C Motors India Ltd. R D F Power Projects Ltd. Raj West Power Pvt. Ltd. Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Rajasthan Renewable Energy Corpn. Ltd. Ratnagiri Gas & Power Pvt. Ltd. Reliance Energy Trdg. Ltd. Reliance Infrastructure Ltd. Reliance Power Ltd. Reliance Utilities & Power Pvt. Ltd. Renewable Energy Systems Ltd. Renusagar Power Co. Ltd. Res Photovoltaics Ltd. Roshni Powertech Ltd. S I L Business Enterprises Ltd. S J V N Ltd. S L S Power Inds. Ltd. S M C Power Generation Ltd. Sagar Power Ltd. Sai Regency Power Corpn. Pvt. Ltd. Sakhigopal Integrated Power Co. Ltd. Saptashva Solar Ltd. Satya Maharshi Power Corpn. Ltd. Selco International Ltd. Selene Power Co. Ltd. Sentia Thermal Power & Infrastructure Ltd. Sepset Thermal Power & Infrastructure Ltd. Serida Power Ltd. Shapoorji Pallonji Infrastructure Capital Co. Ltd. Shivani Power Spinners Ltd. Shree Maheshwar Hydel Power Corpn. Ltd. Shriram Non Conventional Energy Ltd. Sikkim Hydro Power Ventures Ltd. Simhapuri Energy Pvt. Ltd. South Asian Agro Inds. Ltd. Southern Energy Devp. Corpn. Ltd. Spectrum Power Generation Ltd. Spic Electric Power Corpn. Pvt. Ltd. Sree Adi Sakthi Mukkuttathode Hydro Power Ltd. Sree Kailas Palchuram Hydro Power Ltd. Sri Panchajanya Power Pvt. Ltd. Sriba Industries Ltd. Srivathsa Power Projects Ltd. Subhash Kabini Power Corpn. Ltd. Sun Source (India) Ltd. Sundram Non-Conventional Energy Systems Ltd. Supreme Renewable Energy Ltd. Surana Green Power Ltd. Suryachakra Global Enviro Power Ltd. Suryachakra Power Corpn. Ltd. Synergy Shakthi Renewable Energy Ltd. T C P Ltd. Tamil Nadu Electricity Board Tamil Nadu Inds. Captive Power Co. Ltd. Tata Power Co. Ltd. Teesta Urja Ltd. Tehri Hydro Devp. Corpn. Ltd. Terra Energy Ltd. Tidong Hydro Power Ltd. Torrent Energy Ltd. Torrent Pipavav Generation Ltd. Torrent Power Ltd. Triton Energy Ltd. Tulsyan Power Ltd. U H L Power Co. Ltd. U P Hydro Projects Ltd. Upper Bari Power Generation Ltd. Uttar Haryana Bijli Vitran Nigam Ltd. Uttar Pradesh Rajya Vidyut Utpadan Nigam Ltd. V S Lignite Power Pvt. Ltd. Vadinar Power Co. Ltd. Vamshi Industrial Power Ltd. Vamshi Industries Ltd. Veer Energy & Infrastructure Ltd. Vemagiri Power Generation Ltd. Vennar Ceramics Ltd. Vidarbha Power Ltd. Videocon Power Ltd. Wardha Power Co. Ltd. Warora Power Co. Ltd. Websol Energy Systems Ltd. West Bengal Power Devp. Corpn. Ltd. West Bengal State Electricity Board Western Alliance Power Ltd. Youngthang Power Ventures Ltd.

PROJECT AT A GLANCE
COST OF PROJECT MEANS OF FINANCE
Particulars Existing Proposed Total Particulars Existing Proposed Total
Land & Site Development Exp. ********** ********** ********** Capital ********** ********** **********
Buildings ********** ********** ********** Share Premium ********** ********** **********
Plant & Machineries ********** ********** ********** Other Type Share Capital ********** ********** **********
Motor Vehicles ********** ********** ********** Reserves & Surplus ********** ********** **********
Office Automation Equipments ********** ********** ********** Cash Subsidy ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** Internal Cash Accruals ********** ********** **********
Franchise & Other Deposits ********** ********** ********** Long/Medium Term Borrowings ********** ********** **********
Preliminary& Pre-operative Exp ********** ********** ********** Debentures / Bonds ********** ********** **********
Provision for Contingencies ********** ********** ********** Unsecured Loans/Deposits ********** ********** **********
Margin Money - Working Capital ********** ********** ********** ********** ********** **********
TOTAL ********** ********** ********** TOTAL ********** ********** **********
COST OF PROJECT
Particulars Existing Proposed Total
C O S T O F P R O J E C T
Land & Site Development Exp.
Land Area Required ********** ********** **********
Land Development Cost, Boundary Wall, Gate & Road etc. ********** ********** **********
********** ********** **********
Buildings ********** ********** **********
Factory Building - ********** ********** **********
Office Buildings ********** ********** **********
********** ********** **********
Plant & Machineries ********** ********** **********
Indigenous Machineries ********** ********** **********
Erection & Installation ********** ********** **********
Laboratory Equipments ********** ********** **********
Miscellaneous Equipments like pumps, valves, pipeline & fittings ********** ********** **********
Imported Machineries ********** ********** **********
Technical know how ********** ********** **********
********** ********** **********
Office Vehicles ********** ********** **********
Office Automation Equipments (Telephone/ Fax/ Computer) ********** ********** **********
Office Equipment, Furniture plus Other Equipment & Accessories ********** ********** **********
Other Misc. Assets ********** ********** **********
Pre-operative & Preliminary Expenses ********** ********** **********
Provision for Contingencies ********** ********** **********
********** ********** **********
Total Capital Cost of Project ********** ********** **********
Margin Money for Working Capital ********** ********** **********
Total Cost of Project ********** ********** **********
PROFITABILITY AND NET CASH ACCRUALS
Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
********** ********** ********** ********** **********
Revenue/Income/Realisation ********** ********** ********** ********** **********
Gross Sales Realisation ********** ********** ********** ********** **********
Less : Excise Duties/Levies ********** ********** ********** ********** **********
Net Sales Realisation ********** ********** ********** ********** **********
Total Revenue/Income/Realisation ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Expenses/Cost of Products/Services/Items ********** ********** ********** ********** **********
Raw Material Cost ********** ********** ********** ********** **********
Indigenous ********** ********** ********** ********** **********
Total Nett Consumption ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** **********
Sub Total of Net Consumption ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** **********
Power/Electricity Expenses ********** ********** ********** ********** **********
Depreciation ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** **********
Repairs & Maintenance Exp. ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** **********
Cost of Output of Goods Sold ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Gross Profit ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Financial Charges ********** ********** ********** ********** **********
Long/Medium Term Borrowing ********** ********** ********** ********** **********
On Wkg. Capital Borrowings ********** ********** ********** ********** **********
Total Financial Charges ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** **********
Total Cost of Sales ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Net Profit Before Taxes ********** ********** ********** ********** **********
Tax on Profit ********** ********** ********** ********** **********
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Added Back ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Net Cash Accruals ********** ********** ********** ********** **********
ASSSESSEMENT OF WORKING CAPITAL REQUIREMENTS
Particulars Stk.Prd. Stk.Prd. Operating Years
1st Year 2nd Yr&+ 1-2 2-3 3-4 4-5 5-6
Capacity Months Months % ********** ********** ********** ********** **********
CURRENT ASSETS ********** ********** ********** ********** **********
Stocks on Hand ********** ********** ********** ********** **********
Raw Material Cost ********** ********** ********** ********** **********
Indigenous ********** ********** M ********** ********** ********** ********** **********
Lab & ETP Chemical ********** ********** M ********** ********** ********** ********** **********
Packing Material ********** ********** M ********** ********** ********** ********** **********
Consumable Store ********** ********** M ********** ********** ********** ********** **********
Work-in-Process ********** ********** D ********** ********** ********** ********** **********
Finished Goods ********** ********** M ********** ********** ********** ********** **********
Current Expenses ********** ********** M ********** ********** ********** ********** **********
Receivables ********** ********** M ********** ********** ********** ********** **********
********** ********** ********** ********** ********** ********** **********
Total ********** ********** ********** ********** **********
Cash/Bank Balances ********** ********** ********** ********** **********
Gross Wkg. Capital ********** ********** ********** ********** **********
********** ********** ********** ********** **********
PROFITABILITY RATIOS, DSCR, DEBT EQUITY
Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
Profit Percentages to Net Sales
Gross Profit ********** ********** ********** ********** **********
% Of G.P. to Net Sales ********** ********** ********** ********** **********
Net Profit Before Taxes ********** ********** ********** ********** **********
% of N.P.B.T. To Net Sales ********** ********** ********** ********** **********
Net Profit After Taxes ********** ********** ********** ********** **********
% of N.P.A.T. To Net Sales ********** ********** ********** ********** **********
Debt Service Coverage Ratio
Funds Available to Service Debts
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
Debt Service Obligations
Repayment of Long/Medium Ter ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
********** ********** ********** ********** **********
D. S. C. R. (Individual) ********** ********** ********** ********** **********
D. S. C. R. (Cumulative) ..... ********** ********** ********** ********** **********
D. S. C. R. (Overall) ........ ********** ********** ********** ********** **********
Parameters
Initial Equity Capital ********** ********** ********** ********** ********** **********
Credit Balance in P & L ********** ********** ********** ********** ********** **********
Total Capital excl Unsec Deposits ********** ********** ********** ********** ********** **********
Unsecured Dep. ********** ********** ********** ********** ********** **********
Total Equity incl Unsecured Deposits ********** ********** ********** ********** ********** **********
Long/Medium Term Borrowings from Bank ********** ********** ********** ********** ********** **********
Term lia. Incl Unsecured Deposit ********** ********** ********** ********** ********** **********
Total Liabilities ********** ********** ********** ********** ********** **********
Total Liabilities incl Unsecured Deposits ********** ********** ********** ********** ********** **********
DEBT EQUITY RATIO considering
i.e.Total Term Lia./NW
Unsecured Dep. as Equity ********** ********** ********** ********** ********** **********
Unsecured Dep. as Debt ********** ********** ********** ********** ********** **********
Total Outside Lia./NW ********** ********** ********** ********** **********
Assets Turnover Ratio (x) ********** ********** ********** ********** **********
No. of Shares of 10.00 each ********** ********** ********** ********** **********
Earnings Per Share (EPS) (in `) ********** ********** ********** ********** **********
Proposed divident ********** ********** ********** ********** **********
Cash EPS (in `) ********** ********** ********** ********** **********
Dividend Per Share(DPS) (in `) ********** ********** ********** ********** **********
Payout Ratio (%Age) ********** ********** ********** ********** **********
Retained Earnings/Share (in `) ********** ********** ********** ********** **********
Retained Earnings (%Age) ********** ********** ********** ********** **********
Book Value Per Share (in `) ********** ********** ********** ********** **********
Debt Per Share (in `) ********** ********** ********** ********** **********
Probable Mkt.Price/Share(in `) ********** ********** ********** ********** **********
Price / Book Value (x) ********** ********** ********** ********** **********
Price Earnings Ratio (x) ********** ********** ********** ********** **********
Yield (%Age) ********** ********** ********** ********** **********
BREAK EVEN ANALYSIS
Particulars Operating Years
Ratio 1-2 2-3 3-4 4-5 5-6
BREAK EVEN ANALYSIS
Total Value of Output ********** ********** ********** ********** **********
Variable Cost & Expenses
Raw Material Cost ********** ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** ********** **********
Sales Commission/Exp. ********** ********** ********** ********** ********** **********
Sub-total ********** ********** ********** ********** **********
Less:W.I.P. Adjustments ********** ********** ********** ********** **********
Total Variable Cost ********** ********** ********** ********** **********
Net Contribution ********** ********** ********** ********** **********
Profit Volume Ratio (%) ********** ********** ********** ********** **********
Semi-Var./Semi-Fixed Exp.
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Interest on Wkg.Capital ********** ********** ********** ********** ********** **********
Tot.Semi-Var./Fixed Exp. ********** ********** ********** ********** **********
**********
Fixed Expenses / Cost **********
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Intrest-Fixed Borrowing ********** ********** ********** ********** ********** **********
Intrest-Working Capital ********** ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** ********** **********
Deferred Expenses W/Off ********** ********** ********** ********** ********** **********
Total Fixed Expenses ********** ********** ********** ********** **********
Tot.Fixed/Semi-Fixed Exp ********** ********** ********** ********** **********
Tot.Cash Fixed/SemiFixed ********** ********** ********** ********** **********
Cash Break Even Sales ********** ********** ********** ********** **********
Cash Margin of Safety ********** ********** ********** ********** **********
Break Even Sales ********** ********** ********** ********** **********
Margin of safety ********** ********** ********** ********** **********
At Maximum Utilisation : Year ********** ********** ********** ********** **********
(as % of Installed Capacity)
Cash B.E.P. : % xx% xx% xx% xx% xx%
B.E.P. : % xx% xx% xx% xx% xx%
M E A N S O F F I N A N C E

Equity Share Capital

********** ********** **********

Others - Preference Share Capital

********** ********** **********
Total Equity Share Capital ********** ********** **********
********** ********** **********

Long/Medium Term Borrowings

********** ********** **********
FROM BANK ********** ********** **********
From Other Financial Institutions ********** ********** **********
Total Long/Medium Term Borrowings ********** ********** **********
********** ********** **********

Total Means of Finance

********** ********** **********
INTEREST AND REPAYMENT ON TERM LOANS
A Name of Institution-Bank ABC BANK
B Term Borrowing Amount ********** xx
C Repayment Term (Years) ********** Years
D Repayment Instalments ********** Instalments
E Repayment Commencement Year - 0; 3rd Qtr.
F Rate of Interest(General) xxxx% p.a.
F Rate of Interest(Initial) 0.00% p.a.
G Apply Gen. Int. Rate from Year x Quarter :: x
H Interest Calculation Quarterly
Debt Service Coverage Ratio
Funds Available to Service Debts
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** **********
Technical Knowhow Fees & Expenses ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
Debt Service Obligations ********** ********** ********** ********** **********
Repayment of Long/Medium Term ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
********** ********** ********** ********** **********
D. S. C. R. (Individual) ********** ********** ********** ********** **********
D. S. C. R. (Cumulative) ..... ********** ********** ********** ********** **********
D. S. C. R. (Overall) ........ ********** ********** ********** ********** **********
DEPRECIATION CHARGES AS PER BOOKS (TOTAL)
Operating Year F.Assets Type A-1 F.Assets Type A-2 F.Assets Type B F.Assets Type C F.Assets Type D-1 F.Assets Type D-2 Total
Particulars Factory Building - Office Buildings PLANT & MACHINERY Office Vehicles Office Automation Equipments (Telephone/ Fax/ Computer) Furniture & Fixtures
1-2 ********** ********** ********** ********** ********** ********** **********
2-3 ********** ********** ********** ********** ********** ********** **********
3-4 ********** ********** ********** ********** ********** ********** **********
4-5 ********** ********** ********** ********** ********** ********** **********
5-6 ********** ********** ********** ********** ********** ********** **********
Particulars Method Deprn.Rate Part Consideration (for Asset put to use less than xx months)
Type A :: Buildings
Factory Building - WDV ********** **********
Office Buildings WDV ********** **********
Type C
Office Vehicles WDV ********** **********
Type D :: Misc. Fixed Assets
Office Automation Equipments (Telephone/ Fax/ Computer) WDV ********** **********
Furniture & Fixtures WDV ********** **********
Projected Pay Back Period
Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
Year 1 2 3 4 5
Initial Investment *********
Total Initial Investment *********
Yearly Cash Flow ********* ********* ********* ********* *********
Accumulated Cash Flow ********* ********* ********* ********* *********
Pay Back Period xx Years xx Months xx Years xx months
Projected IRR
Year CFAT PV factor @**% *********
Initial Investment ********* ********* *********
1-2 ********* ********* *********
2-3 ********* ********* *********
3-4 ********* ********* *********
4-5 ********* ********* *********
5-6 ********* ********* *********
Total PV ********* *********
IRR ********* *********
PROJECTED BALANCE SHEET
Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
Equity Share Capital ********** ********** ********** ********** **********
Surplus of Previous Year ********** ********** ********** ********** **********
Add : Net Profit After Taxes ********** ********** ********** ********** **********
Surplus at the End of Year ********** ********** ********** ********** **********
Unsecured Deposits ********** ********** ********** ********** **********
Long/Medium Term Borrowings Proposed-FROM BANK ********** ********** ********** ********** **********
Bank Borrowing for Wkg. Capital ********** ********** ********** ********** **********
Current Liabilities ********** ********** ********** ********** **********
Sundry Creditors ********** ********** ********** ********** **********
Other Current Liabilities ********** ********** ********** ********** **********
Total Current Liabilities ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Total of Liabilities ********** ********** ********** ********** **********
********** ********** ********** ********** **********
A S S E T S ********** ********** ********** ********** **********
Fixed Assets ********** ********** ********** ********** **********
Gross Block ********** ********** ********** ********** **********
Less : Depreciation to Date ********** ********** ********** ********** **********
Net Block ********** ********** ********** ********** **********
Current Assets ********** ********** ********** ********** **********
Stocks on Hand ********** ********** ********** ********** **********
Receivables ********** ********** ********** ********** **********
Other Current Assets ********** ********** ********** ********** **********
Cash and Bank Balances ********** ********** ********** ********** **********
Total Current Assets ********** ********** ********** ********** **********
P & P Exp. and/or Other Dvp.Exp. ********** ********** ********** ********** **********
(To The Extent Not W/Off) ********** ********** ********** ********** **********
Other Non Current Assets ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Total of Assets ********** ********** ********** ********** **********
********** ********** ********** ********** **********
ROI (Average of Fixed Assets) ********** ********** ********** ********** **********
RONW (Average of Share Capital) ********** ********** ********** ********** **********
ROI (Average of Total Assets) ********** ********** ********** ********** **********
COMPANY SUMMARY

NIIR PROJECT CONSULTANCY SERVICES (NPCS)is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Selection of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

REASONS FOR BUYING THE REPORT
  1. This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  2. This report provides vital information on the product like its definition, characteristics and segmentation.
  3. This report helps you market and place the product correctly by identifying the target customer group of the product.
  4. This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  5. The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
OUR APPROACH
  1. Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  2. The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  3. We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.
TABLE OF CONTENT
Introduction
Project Introduction
Project Objective and Strategy
Concise History of the Product
Properties
BIS (Bureau of Indian Standards) Provision & Specification
Uses & Applications

Market Study and Assessment
Current Indian Market Scenario
Present Market Demand and Supply
Estimated Future Market Demand and Forecast
Statistics of Import & Export
Names & Addresses of Existing Units (Present Players)
Market Opportunity

Raw Material
List of Raw Materials
Properties of Raw Materials
Prescribed Quality of Raw Materials
List of Suppliers and Manufacturers

Personnel (Manpower) Requirements
Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

Plant and Machinery
List of Plant & Machinery
Miscellaneous Items
Appliances & Equipments
Laboratory Equipments & Accessories
Electrification
Electric Load & Water
Maintenance Cost
Sources of Plant & Machinery (Suppliers and Manufacturers)

Manufacturing Process and Formulations
Detailed Process of Manufacture with Formulation
Packaging Required
Process Flow Sheet Diagram

Infrastructure and Utilities
Project Location
Requirement of Land Area
Rates of the Land
Built Up Area
Construction Schedule
Plant Layout and Requirement of Utilities

FINANCIAL PLAN
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR
INFORMATION/ DISCLAIMER
  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.
GAS BASED POWER PLANT
Capacity 25 MW Plant and Machinery cost 10000.00 Lakhs
Working Capital 0.00 Rate of Return (ROR) 44.00 %
Break Even Point (BEP) 20.00 % TCI 11000.00 Lakhs
Cost of Project 11000.00Lakhs
Add to Inquiry Basket Download Page as PDF.

GAS BASED POWER PLANT
Capacity 1014 MWh Plant and Machinery cost 437000.00 Lakhs
Working Capital 0.00 Rate of Return (ROR) 48.00 %
Break Even Point (BEP) 24.00 % TCI 467200.00 Lakhs
Cost of Project 467200.00Lakhs
Add to Inquiry Basket Download Page as PDF.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR