• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit

 

Active Pharmaceut... Read More

Capacity :
Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs
Plant and Machinery cost:
1111.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
5246.00Lakhs
Add To Inquiry Basket
Start Pharmaceutical Unit (Paracetamol Tablets)
Start Pharmaceutical Unit (Paracetamol Tablets)

Paracetamol, also known as acetaminophen in the United States and Canada, is a widely... Read More

Capacity :
Paracetamol Tablets (500mg) 25,000 No. of Strips Per Day
Plant and Machinery cost:
37.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
213.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Paracetamol 0 0.00 0.00
Paracetamol Used Phenol A... 5 Mt/Day 39.00 1219.78
Paracetamol 500.00 KGS./day 0.00 0.00
Pharmaceutical Unit (Tabl... 69 Lakh Nos./Annum,Bruphen Tablets(10 Pcs):9 Lakh Nos./Annum (Strips),Paracetamol Syrup: 24 Lakh Nos 27.00 584.00
Paracetamol 0 0.00 0.00
Paracetamol Paracetamol Tablets: 1500mt/annum Paracetamol Powder: 420mt/annum 27.00 863.00
Production of Paracetamol... Paracetamol Tablets: 1500mt/annum Paracetamol Powder: 420mt/annum 27.00 863.00
Active Pharma Ingredients... Paracetamol : 1,000.0 Kgs / day Azithromycin: 500.0 Kgs / day Amoxicillin Trihydrate: 500.0 Kg 29.00 1322.00
Active Pharma Ingredients... Paracetamol:1,000 Kgs / day Azithromycin:500 Kgs / day Amoxicillin Trihydrate:500 Kgs / day 29.00 1322.00
Active Pharma Ingredients... Paracetamol: 500 Kgs / day Cephalexin : 500 Kgs / day Ampicillin Trihydrate: 500 Kgs / day Ibuprofen 32.00 1656.00
API Production. Cephalexi... 0 0.00 0.00
Paracetamol Paracetamol Tablets:5 MT per day Paracetamol Powder:1.4 MT per day 29.00 794.00
Setting up Paracetamol Ac... 0 0.00 0.00
Start Production of Para... Paracetamol Powder (IP/BP Grade 50 MT Per Day Acetic Acid (31% Conc.) By Product 72 MT Per Day 32.00 2887.00
Active Pharmaceutical Ing... - 12.00 963.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Setup Pharmaceutical Tabl... - 27.00 786.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
Start Pharmaceutical Unit... Paracetamol Tablets (500mg) 25,000 No. of Strips Per Day 34.00 213.00
« Back1 2Next »

Showing 19 - 20 of 20 Product(s)

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.