• 0

Project Consultancy, Reports & Profiles

Best Business Opportunities in Madhya Pradesh - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship


Why start your own Business?

Entrepreneurs frequently start their own businesses as a result of their dreams and passions. It might be tough to find the drive to put out your best efforts when you work for someone else. 

Entrepreneurs get the freedom to set their schedules. You will be able to spend more time with your family and friends once the company is established and you have hired people to do the majority of the critical tasks.  

You have the potential to manipulate your surroundings. By creating new job opportunities, you may create employment and strengthen the economy. There is no limit to how profitable your own company will be if you work hard and stay focused. Your established business can be passed down to your kids or grandsons.

 

What makes Madhya Pradesh an excellent place to start a Business?

 

Infrastructure and industries in Madhya Pradesh; 

The state, located in central India and is known as the “heart of India,” has benefited from substantial infrastructure projects, with both North-South and East-West corridors passing through it. 

Madhya Pradesh has an excellent infrastructure to assist industrial development. There are 550 trains crossing the state every day, a 5,000-kilometer National Highway network, five commercial airports with 100+ flights, and six inland container depots (ICDs). The state owns an oil refinery at Bina with an annual capacity of 6 MMT. The state’s installed power capacity is about 23,400 MW, with renewable energy sources accounting for 35% of that. 

The state is a significant producer of horticulture crops and provides attractive opportunities for the food processing industry. There are many business options available in Madhya Pradesh, including textile manufacturing, automobile manufacturing, cement production, food production, soya farming, and agricultural equipment manufacturing.

 

Railways in Madhya Pradesh; 

Uttar Pradesh (northeast), Rajasthan (northwest), Maharashtra (south), Gujarat (west) and Chhattisgarh (southeast) surround Madhya Pradesh. With a total of 20 important junctions, Madhya Pradesh has excellent rail connectivity. Several criss-cross rail networks operate through the state. The West Central Railway Zone of Indian Railways is headquartered in Jabalpur Junction. Every day, more than 455 trains pass through Madhya Pradesh. Bhopal, the state capital, has 220 trains passing through it. The North-South and East-West corridors go across the state of Madhya Pradesh.

 

Airports in Madhya Pradesh;

Madhya Pradesh is easily accessible from all parts of India. In Madhya Pradesh, there are several airports: Raja Bhoj International Airport (Bhopal Airport), Devi Ahilyabai Holkar Airport (Indore Airport) (International), Rajmata Vijaya Raje Scindia Air Terminal (Gwalior Airport) (Domestic), Dumna Airport (Jabalpur Airport) (Domestic), and Khajuraho Airport (Domestic).

 

Road connectivity in Madhya Pradesh; 

Madhya Pradesh has a 160,000-kilometer road network. Thirty-eight national highways cross the state with a total length of 7,854 kilometres. The length of state roadways is around 11,000 kilometres. The Narmada Expressway is a proposed 8-lane expressway in Madhya Pradesh that will connect Amarkantak in the state’s eastern end to the state’s western end along the Narmada River through Dindori, Shahpura, Jabalpur, and Alirajpur. Gujarat and Chhattisgarh would be connected by 1,300 km of roadways.

 

Agriculture in Madhya Pradesh; 

The Chambal valley, the Malwa Plateau, and the Rewa Plateau are the main farmed areas. Another fertile area is the Narmada valley, which is covered in river-borne alluvium. Rice, wheat, sorghum (jowar), corn (maise), pulses (legumes such as peas, beans, or lentils), and peanuts are the most important crops (groundnuts). Rice is farmed mostly in the east, where there is greater rainfall, although wheat and sorghum are more important in western Madhya Pradesh. In India, the state produces the most soybeans. Linseed, sesame, sugarcane, cotton, and inferior millets are other crops grown in hilly terrain.

In the western district of Mandsaur, near Rajasthan, along with the southwestern district of Khandwa [East Nimar]) the state is a major producer of opium and marijuana.

 

Madhya Pradesh’s Mineral Resources; 

Manganese is the most abundant mineral in the state, along with Glass sand, dolomite, and rock phosphate. It is India’s largest cement producer, accounting for 14% of its total cement production. Malanjkhand, Balaghat, is home to India’s largest open-cast copper mine. Singrauli coalfield has Asia’s thickest coal seam (135 mm). The state is India’s only diamond-producing state and a key producer of coal, limestone, copper, diaspora, and pyrophyllite.

 

Business-Friendly Policies in Madhya Pradesh; 

The state is situated in a key geographic location and is rich in natural resources. One of Madhya Pradesh’s focus areas for economic growth is increasing investments in industrial development. The state is quickly expanding and provides numerous business potential in a variety of industries. Madhya Pradesh’s industry-oriented transparent policies and hassle-free investment procedures aim to make the state a global investment hub. 

A huge land bank, a 24x7 power supply, and an improved law and order situation distinguish Madhya Pradesh as an investment-friendly state. The state has implemented a “single table” model to expedite project approvals and clear applications. The state is ranked in the top 10 states for business ease. There is a conducive climate for investors to visit and invest.

 

What are the steps for Starting a Business in Madhya Pradesh?

 

Decide on a Business Structure; 

Conducting research and reflecting on the following questions is the first step in beginning your business: 

What are my goals and objectives?

Do I wish to hire employees or operate as a sole proprietor?

What are my financial needs, and how much funds do I have on hand? 

This data will assist you in the construction of your business structure. Each company has its own set of needs, and legal organisations are not a one-size-fits-all solution.

 

2. Develop a Business Plan; 

Entrepreneurs who are planning to start a business usually ignore the importance of a business plan. You should have a sound business strategy even if your venture is self-funded. A business plan will essentially describe how much money you’ll need to invest upfront, how much money you’ll need to spend each month or quarter, and when you’ll, you’ll be able to start making money.

 

List of options to consider while forming a business in Madhya Pradesh; 

Limited Liability Company (LLC)

A sole proprietorship 

Partnership Deed 

 

Establishing a Business in Madhya Pradesh requires the following documents; 

Among the crucial steps in starting a business in Madhya Pradesh is to ensure you have all relevant permits and licences. Any paperwork error can negate your efforts. 

When it comes to starting a business, there are several legal regulations and documents that must be completed. Some of those  documents;

 

Digital Signature Certificate (DSC)

Director Identification Number (DIN)

Registration on the MCA Portal

Certificate of Incorporation

 

1. Create a strategy for Ensuring Compliance; 

Even if you own a small business, you are bound by some laws and regulations that govern larger corporations. Regulations controlling advertising, marketing, financing, intellectual property, and consumer privacy are just a few examples. Businesses with employees may be subject to additional state and local requirements in Madhya Pradesh.

 

2. Get Commercial Insurance ; 

Any legal or financial concerns that threaten your business will have an immediate impact on you. It’s crucial to protect your company against liability damages, not only because many clients want it, but also to protect yourself and your future stability. Naturally, the insurance that is right for your company will differ greatly, depending on your industry, the size of your company, and the kind of clients you work with, among other factors.

 

3. Register the name of Your Business; 

The name of your company is frequently used as a label. Prospective customers build an impression of a company based on its name. The name should be easy to recall and understand. Make sure your company’s name is recognisable and describes the services you offer. It’s important to remember that your company name should not already be in use. You must register your business name and, if necessary, copyright it to ensure that no one else uses it.

 

4. Build an effective Business Policy; 

An enterprise’s success will be aided by the development of an efficient business policy. It is something that both employees and management benefit from. It makes it simple to achieve the required planned growth.

 

 

AD_20Art21

Reasons for buying our reports:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, market potential of the product and reasons for investing in the product

• This report provides vital information on the product like its characteristics and segmentation

• This report helps you market and place the product correctly by identifying the target customer group of the product 

• This report helps you understand the viability of the project by disclosing details like machinery required, project costs and snapshot of other project financials

• The report provides a glimpse of government regulations applicable on the industry

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decisions.

 

Our Approach:

• Our research reports broadly cover Indian markets, present analysis, outlook and forecast for a period of five years.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players

• We use reliable sources of information and databases. And information from such sources is processed by us and included in the report



We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
A Business Plan For Sanitary Napkins
A Business Plan For Sanitary Napkins

A sanitary napkin, also kno... Read More

Capacity :
Sanitary Napkins 4,800 PKTS per day
Plant and Machinery cost:
26.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
84.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Blood Collection Tubes (Vacutainer)
Start Manufacturing Of Blood Collection Tubes (Vacutainer)

Blood collection tubes, also known as Vacutainer, are essential tools used in the med... Read More

Capacity :
-
Plant and Machinery cost:
464.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
985.00Lakhs
Add To Inquiry Basket
Start Production Of Potato Flakes
Start Production Of Potato Flakes

Capacity :
Potato Flakes 2 MT Per Day
Plant and Machinery cost:
178.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
563.00Lakhs
Add To Inquiry Basket
Setup Manufacturing Unit Of Bicycle Saddle & Pedals
Setup Manufacturing Unit Of Bicycle Saddle & Pedals

Bicycle saddles and pedals are two crucial components that di... Read More

Capacity :
Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day
Plant and Machinery cost:
208.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
575.00Lakhs
Add To Inquiry Basket
Opportunity in Sodium Sulfide Flakes Business From Sulfur and Caustic Soda
Opportunity in Sodium Sulfide Flakes Business From Sulfur and Caustic Soda

Sodium Sulfide Flakes, scie... Read More

Capacity :
Sodium Sulfide Flakes 10,000 MT Per Annum
Plant and Machinery cost:
282.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1426.00Lakhs
Add To Inquiry Basket
Business Plan for Lithium Ion Battery (Battery Assembly)
Business Plan for Lithium Ion Battery (Battery Assembly)

A lithium ion battery (Battery Assembly) is a rechargeable battery that is typically ... Read More

Capacity :
-
Plant and Machinery cost:
172.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
812.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business of Steel Containers (Cargo Containers)
Start Manufacturing Business of Steel Containers (Cargo Containers)


Read More

Capacity :
Cargo Containers (Size 20 Feet) 34 Nos Per Day
Plant and Machinery cost:
272.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1992.00Lakhs
Add To Inquiry Basket
Start Cutting and Grinding Disc Business
Start Cutting and Grinding Disc Business

 

Cutting and grind... Read More

Capacity :
Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day
Plant and Machinery cost:
141.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
423.00Lakhs
Add To Inquiry Basket
Mink Blankets Production
Mink Blankets Production

 

Mink blankets, de... Read More

Capacity :
-
Plant and Machinery cost:
2700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
6000.00Lakhs
Add To Inquiry Basket
A Business Plan for Micronutrient Fortified Energy Dense Food (Rice Based)
A Business Plan for Micronutrient Fortified Energy Dense Food (Rice Based)

 

Micronutrient For... Read More

Capacity :
Micronutrient Fortified Energy Dense Food 100 MT Per Day
Plant and Machinery cost:
1300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
3500.00Lakhs
Add To Inquiry Basket
Start Business of Caustic Soda (Solids, Liquids, Flakes & Pearls)
Start Business of Caustic Soda (Solids, Liquids, Flakes & Pearls)


Read More

Capacity :
-
Plant and Machinery cost:
29000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
33.00 %
TCI :
0.00 Lakhs
Cost of Project :
56500.00Lakhs
Add To Inquiry Basket
Start Crumb Rubber Powder Business from Waste Tyre (with Shredding Process)
Start Crumb Rubber Powder Business from Waste Tyre (with Shredding Process)

Crumb Rubber Powder represents a finely milled material produ... Read More

Capacity :
Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day
Plant and Machinery cost:
97.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
303.00Lakhs
Add To Inquiry Basket
Start Rice Milling Plant
Start Rice Milling Plant

The rice milling process is a crucial series of operations aimed at transforming paddy, or rough rice, into edible rice that's ready for the market... Read More

Capacity :
-
Plant and Machinery cost:
173.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
824.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Wooden Pencils
Start Manufacturing of Wooden Pencils

Wooden pencils are traditional writing instruments crafted from a solid wood casing that encloses a strip of graphite, commonly referred to as "lea... Read More

Capacity :
Wooden Pencils 69,444 Gross Per Day
Plant and Machinery cost:
1000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
2400.00Lakhs
Add To Inquiry Basket
A Business Plan for Monocrystalline Silicon Ingots
A Business Plan for Monocrystalline Silicon Ingots

 

Monocrystalline Silicon Ingots are cylindrical-shaped, single-crystal silic... Read More

Capacity :
Monocrystalline Silicon Ingots 400 Kgs Per Day
Plant and Machinery cost:
178.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
555.00Lakhs
Add To Inquiry Basket
A Business Plan for Fiber Glass Tape
A Business Plan for Fiber Glass Tape

 

Fiber Glass Tape ... Read More

Capacity :
Fiberglass Tape 24,000 Mtrs. Per Day
Plant and Machinery cost:
190.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
442.00Lakhs
Add To Inquiry Basket
Setup Plant of Compressed Bio Gas Using Napier Grass
Setup Plant of Compressed Bio Gas Using Napier Grass

Compressed Bio Gas (CBG) is a form of renewable energy derived from the anaerobic dig... Read More

Capacity :
-
Plant and Machinery cost:
421.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
950.00Lakhs
Add To Inquiry Basket
Start Manufacturing of PP Woven Fabric
Start Manufacturing of PP Woven Fabric

Polypropylene, which is also known as PP for short name, is one kind of thermoplastic... Read More

Capacity :
PP Woven Fabric 12 MT per day
Plant and Machinery cost:
943.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
1637.00Lakhs
Add To Inquiry Basket
Business Opportunities in Production of Dicyandiamide  (DCDA)
Business Opportunities in Production of Dicyandiamide (DCDA)

 

Dicyandiamide is ... Read More

Capacity :
Dicyandiamide (DCDA) 5 MT Per Day
Plant and Machinery cost:
45.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
270.00Lakhs
Add To Inquiry Basket
Emerging Business of Shrimp Processing  (EOU)
Emerging Business of Shrimp Processing (EOU)

 

Shrimp are decapo... Read More

Capacity :
Shrimp Processing (per Pack 1 Kg Size) 19,500 Kgs Per Day
Plant and Machinery cost:
202.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
1465.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Business of IV Fluids (BFS Technology)
Investment Opportunities in Business of IV Fluids (BFS Technology)

 

Intravenous fluid... Read More

Capacity :
IV Fluids (500 ml Size Bottle) 50,000 Bottles per day
Plant and Machinery cost:
3449.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
20.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
4089.00Lakhs
Add To Inquiry Basket
Start Business of A-2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)
Start Business of A-2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)

Milk is the most important source of protein and is consumed by people all over the w... Read More

Capacity :
A-2 Milk (1 Ltr Tetra Pack) 2,250 Kgs per day Butter (100 & 500 gms Pack) 46 Kgs per day Paneer (4 P
Plant and Machinery cost:
19.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
484.00Lakhs
Add To Inquiry Basket
Start Production of  Paracetamol (BP,IP,USP Grade)
Start Production of Paracetamol (BP,IP,USP Grade)

Read More

Capacity :
Paracetamol Powder (IP/BP Grade 50 MT Per Day Acetic Acid (31% Conc.) By Product 72 MT Per Day
Plant and Machinery cost:
962.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
2887.00Lakhs
Add To Inquiry Basket
Industrial and Pharmaceutical Grade Starch from Cassava, Maize and Tacca Roots
Industrial and Pharmaceutical Grade Starch from Cassava, Maize and Tacca Roots

 

Cassava, sorghum,... Read More

Capacity :
Industrial Grade Starch 37.5 MT Per Day Pharmaceutical Grade Starch 12.5 MT Per Day
Plant and Machinery cost:
257.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
76.00 %
TCI :
0.00 Lakhs
Cost of Project :
1255.00Lakhs
Add To Inquiry Basket
Production of  Copper Wire Drawing & Enamelling
Production of Copper Wire Drawing & Enamelling

 

Copper is one of ... Read More

Capacity :
Copper Wire (0.914 to 0.376 mm) 350 Kgs per day Enamelled Copper Wire (0.914 to 0.376 mm) 350 Kgs pe
Plant and Machinery cost:
432.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
1233.00Lakhs
Add To Inquiry Basket
Profitable Industry of Bamboo Sticks
Profitable Industry of Bamboo Sticks

 

Bamboo is a tribe... Read More

Capacity :
Bamboo Sticks 4 MT Per Day
Plant and Machinery cost:
443.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
791.00Lakhs
Add To Inquiry Basket
Profit Making Manufacturing Business of Alloy Wheels for 2 Wheeler Motorcycle, Bikes Best Business in Automobile Sector
Profit Making Manufacturing Business of Alloy Wheels for 2 Wheeler Motorcycle, Bikes Best Business in Automobile Sector

 

Allo... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Lucrative Manufacturing Business of Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)
Start Lucrative Manufacturing Business of Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)

Milk... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production Business of Eco Friendly Bamboo Toothbrush Most Profitable Business Ideas in Bamboo Industry
Production Business of Eco Friendly Bamboo Toothbrush Most Profitable Business Ideas in Bamboo Industry

Bamboo toothbrushes Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Profitable Business Industry of  Electric Motors
Profitable Business Industry of Electric Motors

 

An e... Read More

Capacity :
5 KW Three Phase Induction Motors120 Nos Per Day 10 KW Three Phase Induction Motors 20 Nos Per Day 1
Plant and Machinery cost:
467.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
3949.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Carbonated Health Drinks
Investment Opportunities in Carbonated Health Drinks

 

Carb... Read More

Capacity :
Carbonated Health Drinks Size 250 ml 8,000 Packs Per Day Carbonated Health Drinks Size 330 ml 4,000
Plant and Machinery cost:
49.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
299.00Lakhs
Add To Inquiry Basket
Business Industry of  Stone Plastic Composite (SPC) Flooring Tiles
Business Industry of Stone Plastic Composite (SPC) Flooring Tiles

 

Stone plastic com... Read More

Capacity :
Stone Plastic Composite (SPC) Flooring Tiles 3,000 Sq,mtr Per Day
Plant and Machinery cost:
408.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
1011.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Waste Lubricating Oil  Recycling Plant
Investment Opportunities in Waste Lubricating Oil Recycling Plant

 

Waste oil is made... Read More

Capacity :
Used Lubricating Oil 20,000 Ltrs per day Spent Clay as by product 2,105 Ltrs per day
Plant and Machinery cost:
127.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
753.00Lakhs
Add To Inquiry Basket
Automated Vehicle Scrapping  and Recycling Unit
Automated Vehicle Scrapping and Recycling Unit

 

The disassembly o... Read More

Capacity :
1000 Vehicles per Month
Plant and Machinery cost:
497.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
2090.00Lakhs
Add To Inquiry Basket
Azodicarbonamide Using Urea and Hydrazine Hydrate
Azodicarbonamide Using Urea and Hydrazine Hydrate

 

The chemical comp... Read More

Capacity :
Azodicarbonamide Powder 40 MT Per Day Ammonia 10.6 MT Per Day Hydrochloric Acid (38% Conc.) 20.1 MT
Plant and Machinery cost:
1951.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
3109.00Lakhs
Add To Inquiry Basket
Rising Demand of  Rice Husk based Biodegradable Cutlery
Rising Demand of Rice Husk based Biodegradable Cutlery

 

People have been ... Read More

Capacity :
Biodegradable Cutlery (Per Set 6 Pcs. Flatware) 1,852 Sets per day
Plant and Machinery cost:
29.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
135.00Lakhs
Add To Inquiry Basket
Profitable Business of Magnesium Sulphate
Profitable Business of Magnesium Sulphate

Magnesium sulphate is an inorganic salt with the formula MgSO4 Read More

Capacity :
72 MT Per Day
Plant and Machinery cost:
256.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
900.00Lakhs
Add To Inquiry Basket
Business Industry of Grain Processing (Grading, Cleaning & Packaging of Rice & Pulses)
Business Industry of Grain Processing (Grading, Cleaning & Packaging of Rice & Pulses)

Grain processing, as exempli... Read More

Capacity :
Moong Dal 1 MT Per Day Masur Dal 1 MT Per Day Toor Dal 1.5 MT Per Day Chana Dal 1 MT Per Day Kabul
Plant and Machinery cost:
63.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
165.00Lakhs
Add To Inquiry Basket
Setting up a Multispeciality Hospital (200 Bedded)
Setting up a Multispeciality Hospital (200 Bedded)

A hospital is a health care institution providing patient treatment with specialized m... Read More

Capacity :
200 Bedded Hospital
Plant and Machinery cost:
14000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
21248.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Aluminium Ingots from Aluminium Scrap
Start Manufacturing of Aluminium Ingots from Aluminium Scrap

Aluminum, is a light weight,... Read More

Capacity :
Aluminium Alloy Ingots14 MT per day Aluminium Scrap 0.23 MT per day
Plant and Machinery cost:
700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
3315.00Lakhs
Add To Inquiry Basket
Calcium Sennosides from Senna Leaves Production Business Plan
Calcium Sennosides from Senna Leaves Production Business Plan

Calcium Sennoside are the m... Read More

Capacity :
400 Kgs per Day
Plant and Machinery cost:
291.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
607.00Lakhs
Add To Inquiry Basket
Start a Production Of Compressed Biogas
Start a Production Of Compressed Biogas

Compressed bio gas (CBG) is a renewable energy source produced from organic material such as agricultural... Read More

Capacity :
Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day
Plant and Machinery cost:
172.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
522.00Lakhs
Add To Inquiry Basket
Start Industry Of Craft Beer
Start Industry Of Craft Beer

Craft beer is a term used to describe a beer that has been made in a traditional and independent fashion. It is usually made in smaller batches wit... Read More

Capacity :
Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot
Plant and Machinery cost:
780.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
2007.00Lakhs
Add To Inquiry Basket
Setup plant of  Acetate Tow  for Cigarette Filters
Setup plant of Acetate Tow for Cigarette Filters

Acetate tow is a type of material used in the cigarette industry to make filters. It is made of cellulose acet... Read More

Capacity :
Acetate Tow 8 MT Per Day
Plant and Machinery cost:
542.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
1426.00Lakhs
Add To Inquiry Basket
Setup Plant  Of Titanium Dioxide From Rutile Ilmenite Ore
Setup Plant Of Titanium Dioxide From Rutile Ilmenite Ore

Titanium dioxide from rutil... Read More

Capacity :
Titanium Dioxide 4 MT Per Day
Plant and Machinery cost:
390.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
1455.00Lakhs
Add To Inquiry Basket
Setup Plant Of  Lab Cultured Diamonds From Graphite
Setup Plant Of Lab Cultured Diamonds From Graphite

Lab-cultured diamonds are quickly becoming the new standard for luxury jewelry, offering many of the same qualities as trad... Read More

Capacity :
Lab Cultured Diamonds (1 Carat) 30 Carat Per Day
Plant and Machinery cost:
200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
361.00Lakhs
Add To Inquiry Basket
Start Lemon Processing Unit (Lemon Juice Powder, Lemon Peel Oil, Lemon Pectin)
Start Lemon Processing Unit (Lemon Juice Powder, Lemon Peel Oil, Lemon Pectin)

Lemon processing is the pro... Read More

Capacity :
Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs
Plant and Machinery cost:
163.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
314.00Lakhs
Add To Inquiry Basket
Solar PV (Photovoltaic) Glass Industry Manufacturing Business
Solar PV (Photovoltaic) Glass Industry Manufacturing Business

The global energy transition towards renewable sources is well underway, and solar po... Read More

Capacity :
Solar PV (Photovoltaic) Glass 90,000 MT Per Annum
Plant and Machinery cost:
2800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
69.00 %
TCI :
0.00 Lakhs
Cost of Project :
4200.00Lakhs
Add To Inquiry Basket
A Business Plan For Pea Protein Isolate or Concentrate
A Business Plan For Pea Protein Isolate or Concentrate

Yellow peas are the source of the pea protein isolate and concentrate. These goods of... Read More

Capacity :
Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day
Plant and Machinery cost:
118.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
614.00Lakhs
Add To Inquiry Basket
Setup Plant  Of  Acrylate Resins and Emulsions
Setup Plant Of Acrylate Resins and Emulsions

An important class of materials that have acquired extensive application in numerous ... Read More

Capacity :
Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum
Plant and Machinery cost:
500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
2291.00Lakhs
Add To Inquiry Basket
Start Latex Rubber Thread Manufacturing Business
Start Latex Rubber Thread Manufacturing Business

A sort of elastic material created from either natural rubber... Read More

Capacity :
Latex Rubber Thread 200 Kg. Per Day
Plant and Machinery cost:
145.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
412.00Lakhs
Add To Inquiry Basket
Start Cosmetic Unit (Serum, Cream, Shampoo & Lipstick) Manufacturing Business
Start Cosmetic Unit (Serum, Cream, Shampoo & Lipstick) Manufacturing Business

Serum, cream, shampoo, and lipstick are frequently seen in cosmetic units, which are ... Read More

Capacity :
-
Plant and Machinery cost:
46.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
37.00 %
TCI :
0.00 Lakhs
Cost of Project :
1617.00Lakhs
Add To Inquiry Basket
Pioneering Pea Protein Building a Successful Business Venture
Pioneering Pea Protein Building a Successful Business Venture

Healthy protein powder called pea healthy protein isolate/con... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production Of Silica  From Rice Husk Ash
Start Production Of Silica From Rice Husk Ash

Silica is a mineral compound composed of silicon and oxygen, and is one of the most a... Read More

Capacity :
-
Plant and Machinery cost:
2995.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
4716.00Lakhs
Add To Inquiry Basket
A Business Plan for IV Fluid (BFS Technology)
A Business Plan for IV Fluid (BFS Technology)

 

IV fluids, also k... Read More

Capacity :
IV Fluids (500 ml Size Pack) 78,000 Packs Per Day
Plant and Machinery cost:
744.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1263.00Lakhs
Add To Inquiry Basket
Start Industry of Liquor from Mahua (Wine and Hard Liquor)
Start Industry of Liquor from Mahua (Wine and Hard Liquor)

Mahua is a tropical tree native to the Indian subcontinent and Southeast Asia. It is ... Read More

Capacity :
Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B
Plant and Machinery cost:
782.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
1880.00Lakhs
Add To Inquiry Basket
Start Industry with Serum, Cream, and Shampoo | Turning Your Passion for Cosmetics into a Thriving Business with Serum, Cream, and Shampoo
Start Industry with Serum, Cream, and Shampoo | Turning Your Passion for Cosmetics into a Thriving Business with Serum, Cream, and Shampoo

Why The Beauty Indu... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Unit Of Cement Plant with Power Generation
Setup Unit Of Cement Plant with Power Generation

Cement is a crucial binding agent that is use... Read More

Capacity :
Cement Plant 40,000 Bags per Day
Plant and Machinery cost:
16500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
25200.00Lakhs
Add To Inquiry Basket
A Business Plan for Sterile Water for Injection
A Business Plan for Sterile Water for Injection

Sterile water refers to water that is completely free from any living organisms, such... Read More

Capacity :
Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day
Plant and Machinery cost:
572.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
1234.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Start Manufacturing of PP... PP Woven Fabric 12 MT per day 27.00 1637.00
Business Opportunities in... Dicyandiamide (DCDA) 5 MT Per Day 29.00 270.00
Emerging Business of Shri... Shrimp Processing (per Pack 1 Kg Size) 19,500 Kgs Per Day 30.00 1465.00
Investment Opportunities ... IV Fluids (500 ml Size Bottle) 50,000 Bottles per day 20.00 4089.00
Start Business of A-2 Cow... A-2 Milk (1 Ltr Tetra Pack) 2,250 Kgs per day Butter (100 & 500 gms Pack) 46 Kgs per day Paneer (4 P 25.00 484.00
Start Production of Para... Paracetamol Powder (IP/BP Grade 50 MT Per Day Acetic Acid (31% Conc.) By Product 72 MT Per Day 32.00 2887.00
Industrial and Pharmaceut... Industrial Grade Starch 37.5 MT Per Day Pharmaceutical Grade Starch 12.5 MT Per Day 28.00 1255.00
Production of Copper Wir... Copper Wire (0.914 to 0.376 mm) 350 Kgs per day Enamelled Copper Wire (0.914 to 0.376 mm) 350 Kgs pe 28.00 1233.00
Profitable Industry of Ba... Bamboo Sticks 4 MT Per Day 26.00 791.00
Profit Making Manufacturi... 0 0.00 0.00
Start Lucrative Manufactu... 0 0.00 0.00
Production Business of Ec... 0 0.00 0.00
Profitable Business Indus... 5 KW Three Phase Induction Motors120 Nos Per Day 10 KW Three Phase Induction Motors 20 Nos Per Day 1 26.00 3949.00
12345678910...
« Back1 2 3 4 5Next »

Showing 1 - 60 of 3004 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR