• 0

Project Consultancy, Reports & Profiles

Tripura is a state in Northeast India. The third-smallest state in the country, it covers 10,491 km2 (4,051 sq mi) and is bordered by Bangladesh (East Bengal) to the north, south, and west, and the Indian states of Assam and Mizoram to the east. Tripura is a landlocked state in North East India. The state has a tropical savanna climate, designated Aw under the Köppen climate classification. The undulating topography leads to local variations, particularly in the hill ranges. The four main seasons are winter, from December to February; pre-monsoon or summer, from March to April; monsoon, from May to September; and post-monsoon, from October to November.

Tripura's gross state domestic product for 2010–11 was 129.47 billion (US$2.1 billion) at constant price (2004–05), recording 5.71 per cent growth over the previous year. In the same period, the GDP of India was 48778.42 billion (US$790 billion), with a growth rate of 8.55 per cent. Tripura is an agrarian state with more than half of the population dependent on agriculture and allied activities. However, due to hilly terrain and forest cover, only 27 per cent of the land is available for cultivation. Rice, the major crop of the state, is cultivated in 91 per cent of the cropped area.

TOURISM

Tripura has a geographical area of about 10,492 sq. km. almost two-thirds of the state is under hilly terrain and it is surrounded on three sides by the deltaic basin of Bangladesh. The Tripura tribal’s are divided into two groups: Puran Tripuras and Natun Tripuras. The Puran Tripuras are the original inhabitants of the State and constitute a little over 16% of the total and 57% of the tribal population of the State. The Department of Tourism, Govt. of India, under the ministry of Tourism and Culture has been providing liberal financial and technical support for the tourism development in the state based on the projects received from the states. It is quite clear that Tripura has tremendous and quite unique tourism potential. This could be tapped mainly through the concept of Eco-tourism and Heritage tourism. Nature / wildlife tourism, adventure tourism, rural tourism, leisure tourism, pilgrimage tourism, international border tourism could be some special tourist packages. The Tourism Development in the Northeast region will depend on integrated approach, involving various government departments, private entrepreneurs, voluntary organizations and local community. This approach will also help in evolving local people’s perception towards tourism development as a strong tool for socio-economic up liftment.

INDUSTRIAL SECTOR

The State Government offers a package of incentives for setting up of industrial units, which is comparable to other states. Besides, the special incentive package i.e. North East Industrial and Investment Promotion Policy (NEIIP) declared by the Government of India for the North East Region is available to industrial units.

State Package of Incentives under Tripura Industrial Investment Promotion Incentive Scheme-

•                    Capital Investment Subsidy @ 30% and additional subsidy @ 2.5% for enterprises of ST, SC, & women individuals on Fixed Capital Investment.

•                    Full Reimbursement of Standard Certification Fees /Charges / other expenses on account of obtaining a standard Certification.

•                    Provides State Transport Subsidy for covering the portion for which Central Transport Subsidy is not available

•                    85% Exemption from the payment of Earnest Money and Security Deposits on tenders floated by State Govt. Department / Agencies.

Incentives declared by Central Government:

•                    Exemption of Excise Duty on finished products.

•                    Central Transport Subsidy.

•                    Income Tax Benefit.

•                    Capital Investment Subsidy.

•                    Comprehensive Insurance Scheme for insurance coverage. Subsidies to service sector, bio-technology and power generating industries.

INVESTMENT OPPORTUNITIES

Tripura offers an investor-friendly environment. The Government welcomes investments into the State, from both domestic and foreign investors.

•        Natural gas

Tripura has vast reserves of natural gas in non-associate form. The gas is of high quality, with high methane content of up to 97%. The availability of superior quality natural gas, at concessional price, offers a great opportunity to prospective investors, to set up gas-based industrial units, using natural gas

•        Information Technology (IT)

Tripura has been considered the second best IT destination in the North East. IT sector (including IT-enabled services) has been identified as one of the major potential growth sectors by the state. The high literacy rate of the State provides additional advantage for development of the sector.

•        Food Processing

The State government has identified food processing as a major thrust area. There is a vast potential for setting up of food processing units in the State. The agro-climatic conditions in Tripura are ideally suited for production of a large variety of horticultural crops.

•        Handicrafts

From time immemorial, Tripura has carved out a name for itself in the field of handicrafts. The gifted artisans produce wonderful objects of crafts from simple material like cane, bamboo and wood.

•        Tourism

Tripura is an attractive tourist destination. The state has a rich cultural heritage. There are number of historical Hindu and Buddhist sites.


INDUSTRIAL POLICY

•        To improve Basic as well Industrial Infrastructure.

•        Industrial Growth by attracting Private Investment.

•        To improve investment climate towards better regulation by removing barriers to competition.

•        Creation of hassle-free and congenial investment climate.

•        To bring significant increase in the State Domestic Product.

•        Widening of resources base of the state.

•        Development of connectivity (Internal road, railways and air & telecom).

•        Better social infrastructure Enabling Entrepreneurship -building capacities through entrepreneurial and technical skills, training and promotion of self-employment.

THRUST AREAS

•        Natural Gas

•        Food Processing

•        Rubber

•        Tea

•        Handicraft

•        Bamboo

•        Handloom

•        Tourism

•        Information Technology

•        Education

  •           Healthcare

The Department of Industries & Commerce was established to promote Village and Small-scale industries as well as medium and large scale industries in the State. While efforts are being made to promote entrepreneurship within the State, the outside investors in the public and private sectors are also encouraged both for their financial capabilities and technical expertise, for the medium and large-scale units. The major existing industrial area is the Industrial Growth Centre Complex at Bodhjungnagar which also includes Food Park, Rubber Park and Export Promotion Industrial Park. The other industrial sites near Agartala as the main business and industrial centres are Dukli, Arundhatinagar and Badharghat. The mineral resources are minor amounts of glass sands, limestone, plastic clay and hard rock and all of these materials are being used in varying degrees. Setting up of ceramic tiles unit and other mineral based industries are being encouraged in the private sector.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Pharmaceutical Unit (Tablet And Capsules)
Pharmaceutical Unit (Tablet And Capsules)

The Indian pharmaceutical sector has come a long way, being almost non-existent before 1970 to a prominent provider of healthcare products, meeting... Read More

Capacity :
Tablets:10,000 Strips/Day •Capsules:10,000 Strips/Day
Plant and Machinery cost:
262.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
554.00 Lakhs
Cost of Project :
554.00Lakhs
Add To Inquiry Basket
PVC Flex Banner (Frontlit, Backlit & Vinyl)
PVC Flex Banner (Frontlit, Backlit & Vinyl)

PVC flex is made out of PVC and fabric raw material, specially designed for solve... Read More

Capacity :
PVC Flex Banner (Frontlit/Backlit) 440 g/m2:20 MT/Day •PVC Flex Banner Vinyl 440 g/m2:5 MT/Day
Plant and Machinery cost:
550.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
50.00 %
TCI :
1196.00 Lakhs
Cost of Project :
1196.00Lakhs
Add To Inquiry Basket
Reclamation of Used Engine Oil by Alkali Refining Process(Caustic Soda)
Reclamation of Used Engine Oil by Alkali Refining Process(Caustic Soda)

Huge amounts of used lubricating oils from automotive sources are disposed of as a harmful waste into the environment. The cost and availability of... Read More

Capacity :
Reclaimed Engine Oil :5000 Litres/Day
Plant and Machinery cost:
49.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
57.00 %
TCI :
161.00 Lakhs
Cost of Project :
161.00Lakhs
Add To Inquiry Basket
Polyethylene Wax
Polyethylene Wax

Waxes are among the oldest worked materials used by humans. Their value as versatile construction materials (man's first plastic) was discovered ve... Read More

Capacity :
20 MT/ Day
Plant and Machinery cost:
258.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
704.00 Lakhs
Cost of Project :
704.00Lakhs
Add To Inquiry Basket
Acrylic Emulsion Paints
Acrylic Emulsion Paints

Paint is used to decorate, protect and prolong the life of natural and synthetic materials, and acts as a barrier against environmental conditions.... Read More

Capacity :
Pure Acrylic Emulsion Paint :66 MT/Day •Styrene Acrylic Emulsion Paint :50 MT/Day •Vinyl Acrylic Emu
Plant and Machinery cost:
298.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
50.00 %
TCI :
1874.00 Lakhs
Cost of Project :
1874.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable Syringes made of plastic ... Read More

Capacity :
Disposable Plastic Syringes (2 ml Size):40000 Pcs/Day•Disposable Plastic Syringes (5 ml Size):40000
Plant and Machinery cost:
490.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
15.24%
Break Even Point (BEP):
61.07 %
TCI :
757.00 Lakhs
Cost of Project :
757.00Lakhs
Add To Inquiry Basket
PVC Membrane for Waterproofing
PVC Membrane for Waterproofing

The sheet of polyvinyl chloride is used as waterproof barrier in construction for all types of roofs, terraces, walls also in civil engineering in ... Read More

Capacity :
PVC Membrane (2 mm Thickness):3,333 SQM/Day
Plant and Machinery cost:
238.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.76%
Break Even Point (BEP):
57.50 %
TCI :
469.00 Lakhs
Cost of Project :
469.00Lakhs
Add To Inquiry Basket
Sanitary Napkins
Sanitary Napkins

A sanitary napkin or a sanitary towe... Read More

Capacity :
18000 Packets/Day
Plant and Machinery cost:
99.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.32%
Break Even Point (BEP):
45.69 %
TCI :
321.00 Lakhs
Cost of Project :
321.00Lakhs
Add To Inquiry Basket
IV Fluid and Dialysis Solution
IV Fluid and Dialysis Solution

Intravenous therapy IV therapy is th... Read More

Capacity :
IV Fluid NS5 (500 ml Size):8,000 Bottles/Day •IV Fluid DNS (500 ml Size): 8,000 Bottles/Day •IV Flui
Plant and Machinery cost:
315.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.41%
Break Even Point (BEP):
43.11 %
TCI :
1151.00 Lakhs
Cost of Project :
1151.00Lakhs
Add To Inquiry Basket
Export House
Export House

Export means taking goods out of India to a place outside India.” Export trade in India is regulated by the Directorate General of Foreign Tr... Read More

Capacity :
Fruits – Apple 800.0 Kgs/Day•Banana 600 Kgs/Day •Mango 600 Kgs/Day •Grapes 400 Kgs/Day •Pomogranates
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.98%
Break Even Point (BEP):
59.05 %
TCI :
697.00 Lakhs
Cost of Project :
697.00Lakhs
Add To Inquiry Basket
Freeze Dried Vegetables
Freeze Dried Vegetables

Most foods contain very high percentage of water. Microorganisms thrive when there is water, spoiling the food and altering its taste. Removing wat... Read More

Capacity :
Freeze Dried Vegetables 730 Kgs/Day
Plant and Machinery cost:
336.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.19%
Break Even Point (BEP):
53.97 %
TCI :
572.00 Lakhs
Cost of Project :
572.00Lakhs
Add To Inquiry Basket
Complex NPK Fertilizer
Complex NPK Fertilizer

Fertilizers are chemical compounds applied to promote plant and fruit growth. Fertilizers are usually applied either through the soil (for uptake b... Read More

Capacity :
Complex NPK Fertilizer 17:17:17 Grade: 600 MT/Day
Plant and Machinery cost:
2745.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
65.63 %
TCI :
6946.00 Lakhs
Cost of Project :
6946.00Lakhs
Add To Inquiry Basket
Pharmaceutical Unit (Tablets, Syrup, Capsules & Ointment)
Pharmaceutical Unit (Tablets, Syrup, Capsules & Ointment)

The pharmaceutical industry develops, produces, and markets drugs or pharmaceuticals licensed for use as medications. Pharmaceutical companies are ... Read More

Capacity :
0
Plant and Machinery cost:
840.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.84%
Break Even Point (BEP):
29.39 %
TCI :
136219.00 Lakhs
Cost of Project :
136219.00Lakhs
Add To Inquiry Basket
Ayurvedic Churna & Tablets
Ayurvedic Churna & Tablets

Ayurvedic medicine is a traditional type of medicine. It is now being recognized all over the world as one of the best type of medicine. It was ing... Read More

Capacity :
Gastritis Sugar Coated Tablets :1000 Bottles/Day •Liver Tablets :1000 Bottles/Day •Panchsakara Churn
Plant and Machinery cost:
91.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.83%
Break Even Point (BEP):
44.75 %
TCI :
354.00 Lakhs
Cost of Project :
354.00Lakhs
Add To Inquiry Basket
METHYL METHACRYLATE
METHYL METHACRYLATE

Methyl methacrylate (MMA) is an organic compound with the formula CH2=C(CH3)COOCH3<... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
1.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Maltodextrin
Maltodextrin

Maltodextrin is a mixture of glucose, maltose, oligosaccharides and polysaccharides. Maltodextrin is 15 to 20%... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
1.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
LDPE LLDPE Pouch Films
LDPE LLDPE Pouch Films

LDPE/LLDPE Pouch Films

Plastic, today, is being increasingly utilized in almost eve... Read More

Capacity :
LDPE/LLDPE Pouch Films :1.2 MT/Day
Plant and Machinery cost:
30.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.32%
Break Even Point (BEP):
41.09 %
TCI :
254.00 Lakhs
Cost of Project :
254.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse

Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice stra... Read More

Capacity :
Disposable Paper Cups :7.5 MT/Day Disposable Paper Plates:7.5 MT/Day
Plant and Machinery cost:
32.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.18%
Break Even Point (BEP):
56.37 %
TCI :
314.00 Lakhs
Cost of Project :
314.00Lakhs
Add To Inquiry Basket
Pomegranate Farming
Pomegranate Farming

Pomegranate (Punica granatum) is an ancient favorite table fruit of tropical and sub-tropical regions of the world. The fruit is symbolic of plenty... Read More

Capacity :
•Pomogranate Fruits :600 Kgs/Day •Wheat:10 Kgs/Day
Plant and Machinery cost:
33.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
8.34%
Break Even Point (BEP):
22.53 %
TCI :
533.00 Lakhs
Cost of Project :
533.00Lakhs
Add To Inquiry Basket
PVC Shrink Sleeves
PVC Shrink Sleeves

Shrink sleeve labels are sleeves constructed from film material that, rather than using adhesive, shrinks to a product’s surface... Read More

Capacity :
PVC Shrink Sleeves:400 Pkts/Day
Plant and Machinery cost:
72.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
13.16%
Break Even Point (BEP):
66.91 %
TCI :
202.00 Lakhs
Cost of Project :
202.00Lakhs
Add To Inquiry Basket
Transmission Tower & Tele Communication Tower with Galvanizing Plant
Transmission Tower & Tele Communication Tower with Galvanizing Plant

A transmission tower (colloquially termed an electricity pylon in the United Kingdom and parts of Europe, an ironman in Australia, and a hydro towe... Read More

Capacity :
Transmission & Tele Communication Tower: 80 MT/ Day
Plant and Machinery cost:
239.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
1309.00 Lakhs
Cost of Project :
1309.00Lakhs
Add To Inquiry Basket
Tractor Manufacturing
Tractor Manufacturing

Tractor is one of the most important farm machineries. We can say that tractor is the forehand of the farming industry. This is the blessing of god... Read More

Capacity :
Tractors: 84 Nos./Day
Plant and Machinery cost:
258.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
51.00 %
TCI :
1771.00 Lakhs
Cost of Project :
1771.00Lakhs
Add To Inquiry Basket
Sanitary Napkins
Sanitary Napkins

Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile. A sanitary napkin or a san... Read More

Capacity :
30,000 Pkts./Day
Plant and Machinery cost:
345.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
42.00 %
TCI :
685.00 Lakhs
Cost of Project :
685.00Lakhs
Add To Inquiry Basket
Tobacco Cultivation and Processing (E O U)
Tobacco Cultivation and Processing (E O U)

In modern tobacco farming, Nicotiana seeds are scattered onto the surface of the soil, as their germination is activated by light, then covered in ... Read More

Capacity :
Processed Tobacco Leaves: 24 MT/Day
Plant and Machinery cost:
1265.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
80.00 %
TCI :
2267.00 Lakhs
Cost of Project :
2267.00Lakhs
Add To Inquiry Basket
SAW (Spiral & Longitudinal) PIPES (Mobile Plant)
SAW (Spiral & Longitudinal) PIPES (Mobile Plant)

SAW pipe is Submerged Arc Welded pipe. They are the pipes formed by the process called Submerged Arc welding. There can be two types of SAW pipes: ... Read More

Capacity :
SAW (Spiral & Longitudinal) Pipes: 83.3 MT/Day
Plant and Machinery cost:
1387.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
11.00%
Break Even Point (BEP):
57.00 %
TCI :
1802.00 Lakhs
Cost of Project :
1802.00Lakhs
Add To Inquiry Basket
Clinker Grinding for Cement
Clinker Grinding for Cement

Cement is an inorganic, non-metallic substance with hydraulic binding properties, and is used as a bonding agent in building materials. It is a fin... Read More

Capacity :
Clinker for Cement: 100 MT/Day
Plant and Machinery cost:
436.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
55.00 %
TCI :
907.00 Lakhs
Cost of Project :
907.00Lakhs
Add To Inquiry Basket
Mattress & Quilt
Mattress & Quilt

A mattress is a large pad for supporting the reclining body, used as or on a bed. Mattresses may consist of a quilted or similarly fastened case, u... Read More

Capacity :
Mattress 200 Nos/Day, Quilt:1000 Nos/Day
Plant and Machinery cost:
63.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
364.00 Lakhs
Cost of Project :
364.00Lakhs
Add To Inquiry Basket
PVC Wire & Cables
PVC Wire & Cables

The generation, transmission, and distribution of power involve electrical facilities, apparatus, and components, to carry the electrical energy fr... Read More

Capacity :
Single Core Wires (THHN/THWN) 60 KM/Day,Single Core Stranded (CU/PVC)45 KM/Day,Multiple-Core Flexibl
Plant and Machinery cost:
55.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
71.00 %
TCI :
189.00 Lakhs
Cost of Project :
189.00Lakhs
Add To Inquiry Basket
Edible Nuts Processing & Packing (Peanuts, Cashew Nuts, Almonds and Pistachio)
Edible Nuts Processing & Packing (Peanuts, Cashew Nuts, Almonds and Pistachio)

Edible nuts are used by mankind for food, edible oils, spices, condiments or beverages. They have been an important food source from prehistoric ti... Read More

Capacity :
Pea Nuts:500 Kgs./Day • Cashew Nuts:500 Kgs./Day •Almonds:500 Kgs./Day •Pistachio:500 Kgs./Day
Plant and Machinery cost:
26.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
222.00 Lakhs
Cost of Project :
222.00Lakhs
Add To Inquiry Basket
Water Treatment Chemicals (Antiscalants and Membrane Cleaners)
Water Treatment Chemicals (Antiscalants and Membrane Cleaners)

There has been a dramatic increase in the number of reverse osmosis and nano-filtration plant over the past ten years. There has also been a prolif... Read More

Capacity :
Capacity Antiscalants: 5MT/Day, Membrane Cleaners: 5 MT/Day
Plant and Machinery cost:
88.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.82%
Break Even Point (BEP):
63.96 %
TCI :
613.00 Lakhs
Cost of Project :
613.00Lakhs
Add To Inquiry Basket
Aluminium Collapsible Tubes (Printed)
Aluminium Collapsible Tubes (Printed)

A collapsible tube is defined as a cylinder of pliable metal that can be sealed in such a manner that its contents, although readily discharged in ... Read More

Capacity :
Aluminium Collapsible Tubes (Printed): 2,00,000 Nos/Day
Plant and Machinery cost:
608.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.40%
Break Even Point (BEP):
41.58 %
TCI :
1158.00 Lakhs
Cost of Project :
1158.00Lakhs
Add To Inquiry Basket
Thermocol Glass and Plates (Low Investment Project)
Thermocol Glass and Plates (Low Investment Project)

There are many kinds of plastics in the world, any plastics when react with the Blowing Agent will become "Foam" which generally called "Foam Plast... Read More

Capacity :
Glasses: 324000 Glasses/Day, Plates: 162000 Plates/Day
Plant and Machinery cost:
73.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
49.00%
Break Even Point (BEP):
35.00 %
TCI :
245.00 Lakhs
Cost of Project :
245.00Lakhs
Add To Inquiry Basket
BLOOD BAGS
BLOOD BAGS

Blood bag is a disposable bio-medical device used for collection, storage, transportation and transfusion of human blood and blood components. The ... Read More

Capacity :
30000 Nos./Day
Plant and Machinery cost:
426.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
48.00 %
TCI :
1465.00 Lakhs
Cost of Project :
1465.00Lakhs
Add To Inquiry Basket
Biomass Power Generation Plant
Biomass Power Generation Plant

Biomass is biological material derived from living, or recently living organisms. In the context of biomass for energy this is often used to mean p... Read More

Capacity :
1 MW
Plant and Machinery cost:
373.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
50.00%
Break Even Point (BEP):
51.00 %
TCI :
543.00 Lakhs
Cost of Project :
543.00Lakhs
Add To Inquiry Basket
IV (intravenous) Fluids [Form Fill Seal (FFS) Technology]
IV (intravenous) Fluids [Form Fill Seal (FFS) Technology]

Intravenous fluids are fluids which ... Read More

Capacity :
9000000 Nos. Bottles/ Annum(Each 1000 ml. Bottles)
Plant and Machinery cost:
851.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
49.00 %
TCI :
1251.00 Lakhs
Cost of Project :
1251.00Lakhs
Add To Inquiry Basket
ACTIVATED CARBON FROM BAMBOO
ACTIVATED CARBON FROM BAMBOO

Activated carbon is a non graphite form of carbon and is micro crystalline in nature. It is extensively used in various industries as a very good a... Read More

Capacity :
1500 Ton/Annum
Plant and Machinery cost:
82.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
46.00 %
TCI :
313.00 Lakhs
Cost of Project :
313.00Lakhs
Add To Inquiry Basket
INDUSTRIAL TRAINING INSTITUTE (ITI)
INDUSTRIAL TRAINING INSTITUTE (ITI)

India has one of the largest technical manpower in the world. However, compared to its population it is not significant and there is a tremendous s... Read More

Capacity :
0
Plant and Machinery cost:
300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
47.00 %
TCI :
988.00 Lakhs
Cost of Project :
988.00Lakhs
Add To Inquiry Basket
Premixed  Tea and Coffee with Sugar and  Milk Powder
Premixed Tea and Coffee with Sugar and Milk Powder

Coffee and tea are important in any office. Working professionals feel the need for these beverages intermittently during their hectic schedule. In... Read More

Capacity :
1 M.T/Day Premixed Tea, 1 M.T/Day Premixed Coffee
Plant and Machinery cost:
31.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
63.00 %
TCI :
82.00 Lakhs
Cost of Project :
82.00Lakhs
Add To Inquiry Basket
Departmental Store
Departmental Store

A departmenta... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Copper Strip Coils from Scraps
Copper Strip Coils from Scraps

Copper strip is produced in a wide va... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Tennis-Ball Factory. Cricket Tennis Ball Manufacturing Business
Tennis-Ball Factory. Cricket Tennis Ball Manufacturing Business

A tennis ball consists of a pressurized rubber core covered with high-quality cloth, usually wool mixed with up to 35 percent nylon. Balls graduall... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Optical Fiber Cable
Optical Fiber Cable

Cabling is the process of packaging optical fibers in a cable structure for handling and protection.An optical fiber (... Read More

Capacity :
125000KM./Day
Plant and Machinery cost:
3886.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
38.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
136992.00Lakhs
Add To Inquiry Basket
HDPE and uPVC Pipes
HDPE and uPVC Pipes

HDPE resins with low ductility can lead to unexpected cracking in the pipe. These HDPE pipes and fittings have a high ... Read More

Capacity :
HDPE Pipes : 5 MT/Day uPVC Pipes : 11 MT/Day
Plant and Machinery cost:
385.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
720.00Lakhs
Add To Inquiry Basket
Biodegradable Plastic Bags from Corn Starch
Biodegradable Plastic Bags from Corn Starch

Corn starch has 25% amylose and 75% amylopectin. The amylose molecules loose lose water increase biodegradation charac... Read More

Capacity :
Biodegradable Plastic Bags (Per Bag 25 gms wt.) : 360 MT/Annum
Plant and Machinery cost:
298.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
606.00Lakhs
Add To Inquiry Basket
Residential Apartment
Residential Apartment

Residential Apartment is a part of Housing, which has encouraging scope or development. House is a very complex term.A standard residential buildin... Read More

Capacity :
312 Nos./Annum
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
10676.00Lakhs
Add To Inquiry Basket
Chocolate, Toffee and Candy Manufacturing Industry
Chocolate, Toffee and Candy Manufacturing Industry

Chocolate, Toffee and Candy Manufacturing Industry. Start your own Confectionery Busi... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Cow Urine Distillate Concentrate Gau Mutra Ark Kamdhenu Ark
Cow Urine Distillate Concentrate Gau Mutra Ark Kamdhenu Ark

Cow Urine Distillate/Concentrate. Gau Mutra Ark (Kamdhenu Ark). Cow Urine (Gomutra) P... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
White Cement Manufacturing Industry
White Cement Manufacturing Industry

White Cement Manufacturing Industry. How to Start a Cement Manufacturing Factory? Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Paraffin Wax Manufacturing Industry
Paraffin Wax Manufacturing Industry

Paraffin Wax Manufacturing Industry. Investment Opportunities in Wax Production Busin... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Dehydrated Fruits
Dehydrated Fruits

Dehydration is a process by which shelf life of the fruits can be extended by evaporating water while preserving the t... Read More

Capacity :
400 Kgs./day
Plant and Machinery cost:
1084.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
1425.00Lakhs
Add To Inquiry Basket
Chilli Oleoresin
Chilli Oleoresin

Paprika oleoresin is a natural food colorant used to obtain a deep red colour in any food that has a liquid/fat phase.... Read More

Capacity :
250 Kgs./day
Plant and Machinery cost:
75.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
237.00Lakhs
Add To Inquiry Basket
PVC Pipes
PVC Pipes

PVC pipes are produced by extrusion process followed by calibration to ensure maintenance of accurate internal dia wit... Read More

Capacity :
PVC Pipes (Size 1 inches) : 510 MT/Annum PVC Pipes (Size 1.50 inches) : 825 MT/Annum PVC Pipes (Si
Plant and Machinery cost:
58.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
71.00 %
TCI :
0.00 Lakhs
Cost of Project :
184.00Lakhs
Add To Inquiry Basket
Herbal Products (Amla, Triphala, and Tooth Powder)  Herbal Pellet (Tablet)  Herbal Oil (Hair Oil and Skin Oil)
Herbal Products (Amla, Triphala, and Tooth Powder) Herbal Pellet (Tablet) Herbal Oil (Hair Oil and Skin Oil)

Herbal products are medicines derived from plants. They are used as supplements to improve health and wellbeing, and m... Read More

Capacity :
Amla Powder (200 gms Per Pack) : 1000 Packs/Day Triphala Powder (200 gms Per Pack) : 1000 Packs/Da
Plant and Machinery cost:
28.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
295.00Lakhs
Add To Inquiry Basket
Bakelite Electrical Accessories (Ws-5)
Bakelite Electrical Accessories (Ws-5)

Bakelite is used as an adhesive compound, molding compound, and as a protective coating in major industrial applications. High resistance property ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Grinding Media Ball
Grinding Media Ball

A ball mill is a type of grinder used to grind and blend materials for use in mineral dressing processes, paints, pyro... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Tobacco Tooth Powder, Tooth Powder from Tobacco Dust
Tobacco Tooth Powder, Tooth Powder from Tobacco Dust

In India, there is a widespread misconception that tobacco is good for the teeth. Tobacco products are popular as a de... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Metal Spectacle Frame
Metal Spectacle Frame

Metal frames are basically the classic in the glasses world, they are like what a Ford Thunderbird is to the car world... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Investment Opportunity in Bicycle and Cycle Rickshaw Manufacturing Industry
Investment Opportunity in Bicycle and Cycle Rickshaw Manufacturing Industry

Investment Opportunity in Bicycle and Cycle Rickshaw Manufacturing Industry. Best Industry for Starting a Business. Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Baby Cereal Food Manufacturing Industry
Baby Cereal Food Manufacturing Industry

Baby Cereal Food Manufacturing Industry. Start a Profitable Baby Food Production Business Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Aluminium Cans Manufacturing
Aluminium Cans Manufacturing

Aluminium cans are every day commodities that people come across on a regular basis, whether i... Read More

Capacity :
Aluminium Cans for Brewery : 15,000,000 Pcs./Annum Aluminium Scraps (Waste) : 50,000 Kgs./Annum
Plant and Machinery cost:
172.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
712.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Manufacturing of Gum Arab... Arabic Gum (Talha): 6.73 MT / Day 26.00 535.00
Eco-Friendly Bamboo Based... 0 0.00 0.00
Business Ideas in Product... 0 0.00 0.00
Production of Woven PP Ce... PP Woven Sacks (for Cement Bag 50 Kgs Size):258000 Nos/ day PP Woven Jumboo Sacks (for Cement Bag 15 14.00 891.00
Vitamin ‘C’ Manufacturing... 600 kg/day 24.00 717.00
Start A Single Wall Steel... 2,000 Nos/ day 29.00 439.00
Invest in Linear Alkyl Be... 0 0.00 0.00
Weaving of Fiberglass Fab... 0 0.00 0.00
Business opportunities in... Maize Starch: 30 MT per day Liquid Glucose: 30 MT per day Gluten: 4.50 MT per day Germs: 6 MT per d 21.00 4496.00
Emerging business opportu... 1.0 MT per Day 27.00 165.00
Business Ideas and Invest... 0 0.00 0.00
Most Profitable Manufactu... 0 0.00 0.00
Best Manufacturing Busine... 0 0.00 0.00
Dal Mill, Split Pulses, R... 0 0.00 0.00
Start a Production Unit o... 0 0.00 0.00
How to Manufacture the En... 0 0.00 0.00
Best Profitable Manufactu... 0 0.00 0.00
How to set up a Chocolate... Milk Chocolate:1,600 Kgs Per Day Dark Chocolate:1,600 Kgs Per Day White Chocolate:1,600 Kgs Per Day 29.00 671.00
Set up a Unit of Carbon B... 167 MT per day 49.00 8249.00
Profitable Business Idea ... 0 0.00 0.00
Start a Production Unit o... 0 0.00 0.00
Business Opportunities in... 0 0.00 0.00
Set up an Manufacturing U... 0 0.00 0.00
How to Manufacture Carbon... 0 0.00 0.00
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
12345678910...

Showing 1261 - 1320 of 2609 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR