• 0

Project Consultancy, Reports & Profiles

Tripura is a state in Northeast India. The third-smallest state in the country, it covers 10,491 km2 (4,051 sq mi) and is bordered by Bangladesh (East Bengal) to the north, south, and west, and the Indian states of Assam and Mizoram to the east. Tripura is a landlocked state in North East India. The state has a tropical savanna climate, designated Aw under the Köppen climate classification. The undulating topography leads to local variations, particularly in the hill ranges. The four main seasons are winter, from December to February; pre-monsoon or summer, from March to April; monsoon, from May to September; and post-monsoon, from October to November.

Tripura's gross state domestic product for 2010–11 was 129.47 billion (US$2.1 billion) at constant price (2004–05), recording 5.71 per cent growth over the previous year. In the same period, the GDP of India was 48778.42 billion (US$790 billion), with a growth rate of 8.55 per cent. Tripura is an agrarian state with more than half of the population dependent on agriculture and allied activities. However, due to hilly terrain and forest cover, only 27 per cent of the land is available for cultivation. Rice, the major crop of the state, is cultivated in 91 per cent of the cropped area.

TOURISM

Tripura has a geographical area of about 10,492 sq. km. almost two-thirds of the state is under hilly terrain and it is surrounded on three sides by the deltaic basin of Bangladesh. The Tripura tribal’s are divided into two groups: Puran Tripuras and Natun Tripuras. The Puran Tripuras are the original inhabitants of the State and constitute a little over 16% of the total and 57% of the tribal population of the State. The Department of Tourism, Govt. of India, under the ministry of Tourism and Culture has been providing liberal financial and technical support for the tourism development in the state based on the projects received from the states. It is quite clear that Tripura has tremendous and quite unique tourism potential. This could be tapped mainly through the concept of Eco-tourism and Heritage tourism. Nature / wildlife tourism, adventure tourism, rural tourism, leisure tourism, pilgrimage tourism, international border tourism could be some special tourist packages. The Tourism Development in the Northeast region will depend on integrated approach, involving various government departments, private entrepreneurs, voluntary organizations and local community. This approach will also help in evolving local people’s perception towards tourism development as a strong tool for socio-economic up liftment.

INDUSTRIAL SECTOR

The State Government offers a package of incentives for setting up of industrial units, which is comparable to other states. Besides, the special incentive package i.e. North East Industrial and Investment Promotion Policy (NEIIP) declared by the Government of India for the North East Region is available to industrial units.

State Package of Incentives under Tripura Industrial Investment Promotion Incentive Scheme-

•                    Capital Investment Subsidy @ 30% and additional subsidy @ 2.5% for enterprises of ST, SC, & women individuals on Fixed Capital Investment.

•                    Full Reimbursement of Standard Certification Fees /Charges / other expenses on account of obtaining a standard Certification.

•                    Provides State Transport Subsidy for covering the portion for which Central Transport Subsidy is not available

•                    85% Exemption from the payment of Earnest Money and Security Deposits on tenders floated by State Govt. Department / Agencies.

Incentives declared by Central Government:

•                    Exemption of Excise Duty on finished products.

•                    Central Transport Subsidy.

•                    Income Tax Benefit.

•                    Capital Investment Subsidy.

•                    Comprehensive Insurance Scheme for insurance coverage. Subsidies to service sector, bio-technology and power generating industries.

INVESTMENT OPPORTUNITIES

Tripura offers an investor-friendly environment. The Government welcomes investments into the State, from both domestic and foreign investors.

•        Natural gas

Tripura has vast reserves of natural gas in non-associate form. The gas is of high quality, with high methane content of up to 97%. The availability of superior quality natural gas, at concessional price, offers a great opportunity to prospective investors, to set up gas-based industrial units, using natural gas

•        Information Technology (IT)

Tripura has been considered the second best IT destination in the North East. IT sector (including IT-enabled services) has been identified as one of the major potential growth sectors by the state. The high literacy rate of the State provides additional advantage for development of the sector.

•        Food Processing

The State government has identified food processing as a major thrust area. There is a vast potential for setting up of food processing units in the State. The agro-climatic conditions in Tripura are ideally suited for production of a large variety of horticultural crops.

•        Handicrafts

From time immemorial, Tripura has carved out a name for itself in the field of handicrafts. The gifted artisans produce wonderful objects of crafts from simple material like cane, bamboo and wood.

•        Tourism

Tripura is an attractive tourist destination. The state has a rich cultural heritage. There are number of historical Hindu and Buddhist sites.


INDUSTRIAL POLICY

•        To improve Basic as well Industrial Infrastructure.

•        Industrial Growth by attracting Private Investment.

•        To improve investment climate towards better regulation by removing barriers to competition.

•        Creation of hassle-free and congenial investment climate.

•        To bring significant increase in the State Domestic Product.

•        Widening of resources base of the state.

•        Development of connectivity (Internal road, railways and air & telecom).

•        Better social infrastructure Enabling Entrepreneurship -building capacities through entrepreneurial and technical skills, training and promotion of self-employment.

THRUST AREAS

•        Natural Gas

•        Food Processing

•        Rubber

•        Tea

•        Handicraft

•        Bamboo

•        Handloom

•        Tourism

•        Information Technology

•        Education

  •           Healthcare

The Department of Industries & Commerce was established to promote Village and Small-scale industries as well as medium and large scale industries in the State. While efforts are being made to promote entrepreneurship within the State, the outside investors in the public and private sectors are also encouraged both for their financial capabilities and technical expertise, for the medium and large-scale units. The major existing industrial area is the Industrial Growth Centre Complex at Bodhjungnagar which also includes Food Park, Rubber Park and Export Promotion Industrial Park. The other industrial sites near Agartala as the main business and industrial centres are Dukli, Arundhatinagar and Badharghat. The mineral resources are minor amounts of glass sands, limestone, plastic clay and hard rock and all of these materials are being used in varying degrees. Setting up of ceramic tiles unit and other mineral based industries are being encouraged in the private sector.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Processing and Manufacturing of Cocoa Cocoa Butter, Cocoa Couverture and Cocoa Powder Processing Business Further Processed Products Spreads and Chocolate Syrups
Processing and Manufacturing of Cocoa Cocoa Butter, Cocoa Couverture and Cocoa Powder Processing Business Further Processed Products Spreads and Chocolate Syrups

To extract cocoa from raw, roaste... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery Pack Manufacturing Business A Profitable Business Opportunities for Entrepreneurs
Lithium Ion Battery Pack Manufacturing Business A Profitable Business Opportunities for Entrepreneurs

 

Lithium ion (Li-ion) ba... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan for PVC Edge Banding Tape Manufacturing Business
Business Plan for PVC Edge Banding Tape Manufacturing Business

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How to setup Plastic Waste Recycling Plant
How to setup Plastic Waste Recycling Plant

A Plastic Waste Recycling Plant (also known as a Pla... Read More

Capacity :
-
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
401.00Lakhs
Add To Inquiry Basket
Business Plan for Setting up Automated Vehicle Scrapping and Recycling Unit
Business Plan for Setting up Automated Vehicle Scrapping and Recycling Unit

Vehicle recycling is the de... Read More

Capacity :
-
Plant and Machinery cost:
300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
2500.00Lakhs
Add To Inquiry Basket
Badminton Rackets Manufacturing Business
Badminton Rackets Manufacturing Business

Badminton rackets productio... Read More

Capacity :
1000 Pcs Per Day
Plant and Machinery cost:
81.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
353.00Lakhs
Add To Inquiry Basket
Production of Stainless Steel Cold Rolled Coil using Stainless Steel Scrap
Production of Stainless Steel Cold Rolled Coil using Stainless Steel Scrap

Cold rolling is a work hard... Read More

Capacity :
-
Plant and Machinery cost:
2400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
8300.00Lakhs
Add To Inquiry Basket
Kids Wear Apparel T-Shirts & Bottom Wear Business Plan
Kids Wear Apparel T-Shirts & Bottom Wear Business Plan

Children's clothing may not... Read More

Capacity :
T-Shirts: 84 Pcs. per day | Bottom Wear: 84 Pcs. per day
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
68.00Lakhs
Add To Inquiry Basket
Start Traction Motors Permanent Magnet Synchronous Motors, Brushless DC Motors and Flux Motors Business
Start Traction Motors Permanent Magnet Synchronous Motors, Brushless DC Motors and Flux Motors Business

 

Start Traction Motors Permanent Magnet Synchronous Motors, Br... Read More

Capacity :
Permanent Magnet Synchronious Motors (5 KW, 48/72 Volt with 3000 RPM) 40 Nos. Per Day Brushless
Plant and Machinery cost:
114.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
510.00Lakhs
Add To Inquiry Basket
Dental Care Products GI Cement & Composite Lite Cure Business Plan
Dental Care Products GI Cement & Composite Lite Cure Business Plan

Consider starting a glass i... Read More

Capacity :
GI Cement (Part A Powder 5 gms each & Part B Liquid 5 ml each) 20000 Pcs. per Day | Compsite Lite Cu
Plant and Machinery cost:
39.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
340.00Lakhs
Add To Inquiry Basket
Citric Acid Production Business Plan
Citric Acid Production Business Plan

Citrus fruits have a sour t... Read More

Capacity :
100 MT Per Day
Plant and Machinery cost:
8400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
13200.00Lakhs
Add To Inquiry Basket
Lucrative Badminton Racket Manufacturing Business Manufacturing of Badminton Racket Business
Lucrative Badminton Racket Manufacturing Business Manufacturing of Badminton Racket Business

A Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Set Up Epoxy Hardener Plant
Set Up Epoxy Hardener Plant

In order to create an epoxy resin for its intended use, epoxy hardeners are nearly always required. Epoxies do not com... Read More

Capacity :
Polyamide Hardener: 6 MT per Day Cycloaliphatic Amine Hardener:1.2 MT per Day
Plant and Machinery cost:
400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
1300.00Lakhs
Add To Inquiry Basket
ZINC INGOTS Manufacturing Business Plan
ZINC INGOTS Manufacturing Business Plan

 

Zn, zinc is a chemical element. At normal temperature, zinc is a slightly brittle metal that, when its oxida... Read More

Capacity :
6 MT per Day
Plant and Machinery cost:
4500000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
52500000.00Lakhs
Add To Inquiry Basket
Medium Density Fiberboard (MDF) Manufacturing Business
Medium Density Fiberboard (MDF) Manufacturing Business

As a dry-formed panel product made from lignocellulosic fibers mixed with a synthetic resin or other suitable binder, ... Read More

Capacity :
100 CBM per Day
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
3100.00Lakhs
Add To Inquiry Basket
Best Plan of Tennis Rackets Manufacturing Business Start Your Own Tennis Rackets Manufacturing Business
Best Plan of Tennis Rackets Manufacturing Business Start Your Own Tennis Rackets Manufacturing Business

 

A Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Silica From Rice Husk Ash
A Business Plan for Silica From Rice Husk Ash

 

The high silica content in the rice husk ash has attract... Read More

Capacity :
0
Plant and Machinery cost:
745.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
1288.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Biodegradable Plastic Bags From Corn & Cassava Starch Granules
Manufacturing Business Of Biodegradable Plastic Bags From Corn & Cassava Starch Granules

 

Biodegradable plastic is plastic that decomposes naturally in t... Read More

Capacity :
0
Plant and Machinery cost:
101.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
324.00Lakhs
Add To Inquiry Basket
Red Chilli Oleoresin Manufacturing Business
Red Chilli Oleoresin Manufacturing Business

 

Chili oleoresin is a natural extract of chili pepp... Read More

Capacity :
Chilli Oleoresin 6,250 Kg Per Day
Plant and Machinery cost:
1988.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
3250.00Lakhs
Add To Inquiry Basket
Start a Business of Low Relaxation Pre-stressed Concrete Steel Strand (LRPC)
Start a Business of Low Relaxation Pre-stressed Concrete Steel Strand (LRPC)

Since the 1950s, Low Relaxation Pre-stressed Concrete Steel ... Read More

Capacity :
Low Relaxation Pre-stressed Concrete 83.3 MT Per Day Steel Strand (LRPC)
Plant and Machinery cost:
3561.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
5370.00Lakhs
Add To Inquiry Basket
Moringa Leaf Powder Production Business
Moringa Leaf Powder Production Business

 

India is the prime producer of Moringa (Drumstick) with an annual production of... Read More

Capacity :
Moringa Leaf Powder 1,000 Kg Per Day
Plant and Machinery cost:
55.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
189.00Lakhs
Add To Inquiry Basket
Manufacturing Business Aluminium Cans & Easy Open End (EOE) for Beverages
Manufacturing Business Aluminium Cans & Easy Open End (EOE) for Beverages

Aluminium cans and easy open end (EOE) for beverages are a t... Read More

Capacity :
Aluminium Cans & Easy Open End (EOE) 40 Lakh Pcs. Per Day
Plant and Machinery cost:
46000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
27.00 %
TCI :
0.00 Lakhs
Cost of Project :
72100.00Lakhs
Add To Inquiry Basket
Production Business Of Medium-Density Polyethylene (MDPE) Pipes
Production Business Of Medium-Density Polyethylene (MDPE) Pipes

Medium-density polyethylene (MDPE) is a type of polyethylene... Read More

Capacity :
MDPE Pipes 5,400 Kgs per day
Plant and Machinery cost:
94.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
376.00Lakhs
Add To Inquiry Basket
Set Up Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan
Set Up Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan

 

Activated carbon is a type of carbon that has been... Read More

Capacity :
Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
606.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Milk and Milk Powder | Most Profitable and High Demandable Business of Milk Processing
Manufacturing Business of Milk and Milk Powder | Most Profitable and High Demandable Business of Milk Processing

The Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Plant of Red Chili Oleoresin Production Red Chili Oleoresin Manufacturing Business Plant
Plant of Red Chili Oleoresin Production Red Chili Oleoresin Manufacturing Business Plant

The oil-soluble red chilli extract known as Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
The Fuel of the Future Compressed Bio Gas CBG Bio CNG plant Save Money and Help save Our Planet with This Eco-Friendly Fuel
The Fuel of the Future Compressed Bio Gas CBG Bio CNG plant Save Money and Help save Our Planet with This Eco-Friendly Fuel

Energy production using Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Copper Powder  Using Electrolytic Copper Refining and  Water Atomization Technology
Copper Powder Using Electrolytic Copper Refining and Water Atomization Technology

Copper powder is an essenti... Read More

Capacity :
1,20,000 Kgs Per Annum
Plant and Machinery cost:
170.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
338.00Lakhs
Add To Inquiry Basket
ISO Freight Containers
ISO Freight Containers

 

An ISO freight co... Read More

Capacity :
15,000 Nos. Per Annum 15,000 Nos. Per Annum
Plant and Machinery cost:
4560.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
9658.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Potassium Permanganate
Manufacturing Business of Potassium Permanganate

 

Potassium permang... Read More

Capacity :
5,000 MT Per Annum
Plant and Machinery cost:
176.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
1287.00Lakhs
Add To Inquiry Basket
Start a Business Of Ethyl Acetate
Start a Business Of Ethyl Acetate

 

Ethyl Acetate, al... Read More

Capacity :
30,000 MT Per Annum
Plant and Machinery cost:
2665.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
39.00 %
TCI :
0.00 Lakhs
Cost of Project :
7206.00Lakhs
Add To Inquiry Basket
Business Plan of Cultivation of Oil Bearing Rose and Rose Oil Production
Business Plan of Cultivation of Oil Bearing Rose and Rose Oil Production

There are over 5000 sorts of rose in India of which only a couple of yield essential oils. The varieties that are grown in India for obtaining esse... Read More

Capacity :
Rose Oil (Packed in 100 ml size Bottle): 0.7 Ltrs / Day Rose Water (Packed in 100 ml size Bottle): 2
Plant and Machinery cost:
150.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
564.00Lakhs
Add To Inquiry Basket
Liquid Glucose & Fructose (Fruit Sugar) Manufacturing from Broken Rice
Liquid Glucose & Fructose (Fruit Sugar) Manufacturing from Broken Rice

Liquid glucose may be a solution of glucose suspended in liquid and sold in jars or tubs. Many companies manufacture glucose in powdered form to wh... Read More

Capacity :
Liquid Glucose: 112 MT / Day Fructose: 80 MT / Day Broken Rice Protein (Bye Product) : 8 MT / Day
Plant and Machinery cost:
3936.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
5941.00Lakhs
Add To Inquiry Basket
Corn Starch (Maize Starch or Corn Flour) Based Manufacturing of Biodegradable (Eco-Friendly or Compostable) Tableware
Corn Starch (Maize Starch or Corn Flour) Based Manufacturing of Biodegradable (Eco-Friendly or Compostable) Tableware

Biodegradable tableware, because the name suggests, are fully compostable and biodegradable; hence, they're widely used globally so as to reduce pl... Read More

Capacity :
Biodegradable Plate 9" Size (10 Pcs. Each Box): 6,000 Nos / Day Biodegradable Bowl 6" Size (10 Pcs.
Plant and Machinery cost:
40.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
159.00Lakhs
Add To Inquiry Basket
Business Plan of Cellulose (Cellulosic) Fiber
Business Plan of Cellulose (Cellulosic) Fiber

Cellulose or cellulosic fibers are fibers structured from cellulose, a starch-like carbohydrate. They’re created... Read More

Capacity :
Cellulose Fiber: 20 MT / Day
Plant and Machinery cost:
154.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
686.00Lakhs
Add To Inquiry Basket
Egg Shell Powder Business Plan
Egg Shell Powder Business Plan

Egg shell may be a solid waste, with production of several tons per day. Eggshell is usually sent to the landfill with... Read More

Capacity :
Eggshell Powder : 2 MT / Day
Plant and Machinery cost:
11.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
79.00 %
TCI :
0.00 Lakhs
Cost of Project :
42.00Lakhs
Add To Inquiry Basket
Production of 7-Aminocephalosporanic Acid (7-ACA) – Active Pharma Ingredient
Production of 7-Aminocephalosporanic Acid (7-ACA) – Active Pharma Ingredient

Cephalosporin’s a large group of β-lactam antibiotics, contain a 7-aminocephalosporanic acid (7-ACA) nucleu... Read More

Capacity :
7-Aminocephalosporanic Acid: 2 MT / Day
Plant and Machinery cost:
1791.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
3419.00Lakhs
Add To Inquiry Basket
Spice Powder-Masala Powder (Cryogenic Grinding) Production of (Turmeric, Red Chilli, Coriander, Cumin, Cardamom, Cloves, Cassia, Shah Jeera, & Nutmeg Mace Powder)
Spice Powder-Masala Powder (Cryogenic Grinding) Production of (Turmeric, Red Chilli, Coriander, Cumin, Cardamom, Cloves, Cassia, Shah Jeera, & Nutmeg Mace Powder)

Spices are non-leafy parts (e.g. bud, fruit, seed, bark, rhizome, and bulb) of plants used as a flavoring or sea... Read More

Capacity :
Turmeric Powder: 900 Kgs / Day Red Chilli Powder: 900 Kgs / Day Cardamom Powder: 900 Kgs / Day Cori
Plant and Machinery cost:
184.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
844.00Lakhs
Add To Inquiry Basket
Business Plan of Surgical Blades Production
Business Plan of Surgical Blades Production

A Surgical Blade is a small and extremely sharp bladed instrument used for surgery, anatomical dissection, Read More

Capacity :
Surgical Blades (10 Pcs. per Packets):21,600Packets/Day
Plant and Machinery cost:
99.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
69.00 %
TCI :
0.00 Lakhs
Cost of Project :
365.00Lakhs
Add To Inquiry Basket
Business Plan - Curcumin Extraction Unit -Plant
Business Plan - Curcumin Extraction Unit -Plant

Curcumin is the main biologically active photochemical compound of Turmeric. It is extracted, ... Read More

Capacity :
Curcumin Powder: 100 Kgs / Day Turmeric Oil: 47.60 Kgs / Day Deoiled Turmeric: 1,842 Kgs / Day
Plant and Machinery cost:
216.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
487.00Lakhs
Add To Inquiry Basket
Tomato Processing Plant- Tomato Products Tomato Ketchup, Sauce and Soup
Tomato Processing Plant- Tomato Products Tomato Ketchup, Sauce and Soup

Tomatoes are widely consumed and worldwide cultivated. They are one of the most important crops around the world. Toma... Read More

Capacity :
Tomato Ketchup (500 gms Size Glass Bottle): 2,000 Kgs / Day Tomato Sauce (500 gms Size Glass Bottle)
Plant and Machinery cost:
387.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
686.00Lakhs
Add To Inquiry Basket
Banana Powder Manufacturing Unit
Banana Powder Manufacturing Unit

Banana is the common name for a type of fruit and also the herbaceous plants of the genus Musa. Banana is amongst... Read More

Capacity :
Banana Powder : 1,000 Kgs / Day
Plant and Machinery cost:
190.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
417.00Lakhs
Add To Inquiry Basket
Set Up Grain and Molasses-Based Ethanol Distillery- Government Approves Scheme for Increasing Ethanol Production
Set Up Grain and Molasses-Based Ethanol Distillery- Government Approves Scheme for Increasing Ethanol Production

Set Up Grain and Molasses-Based Ethanol Distillery- Gov... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Wheat Starch and Gluten Manufacturing
Wheat Starch and Gluten Manufacturing

Wheat Starch and Gluten Manufacturing. Opportunities for Ent... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Vacutainer Blood Collection Tube Production
Investment Opportunities in Vacutainer Blood Collection Tube Production

 

A vacutainer blood collection tube may be a sterile glass or plastic test tube with&n... Read More

Capacity :
Blood Collection Tubes (Vacutainer) 13x100 with EDTA: 96,000 Nos / Day Blood Collection Tubes (Vac
Plant and Machinery cost:
464.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1105.00Lakhs
Add To Inquiry Basket
Business Plan-GI Metal Sheet Products (Octagonal, Square, Rectangle Poles)
Business Plan-GI Metal Sheet Products (Octagonal, Square, Rectangle Poles)

Utility poles are commonly used to carry two sorts of electrical p... Read More

Capacity :
GI Octagonal Poles, 6 Meter with base Plate, Foundation Bolts : 107.5 Nos. / Day GI Square Poles, 6
Plant and Machinery cost:
600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
1966.00Lakhs
Add To Inquiry Basket
Sodium Percarbonate (Sodium Carbonate Peroxide) Manufacturing
Sodium Percarbonate (Sodium Carbonate Peroxide) Manufacturing

Sodium Percarbonate is a chemical substance with formula Na2H3CO6. It is an adduct of sodi... Read More

Capacity :
Sodium Percarbonate : 10 MT / Day
Plant and Machinery cost:
46.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
295.00Lakhs
Add To Inquiry Basket
Automated Vehicle Scrapping and Recycling Unit
Automated Vehicle Scrapping and Recycling Unit

Automated Vehicle Scrapping and Recycling Unit... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Surgical Blade (Scalpel)
Production of Surgical Blade (Scalpel)

Production of Surgical Blade (Scalpel). Opportunities for E... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Sodium Percarbonate (Sodium Carbonate Peroxide)
Production of Sodium Percarbonate (Sodium Carbonate Peroxide)

Production of Sodium Percarbonate (Sodium Carbonate Peroxid... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Cold Storage Business
Investment Opportunities in Cold Storage Business

 

A cold storage is a temperature-managed supply chain network, with storage and distribution activities perfo... Read More

Capacity :
33 MT /day
Plant and Machinery cost:
179.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
20.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
514.00Lakhs
Add To Inquiry Basket
Business Plan for Set up Manufacturing Unit of Intravenous (IV) Cannulas
Business Plan for Set up Manufacturing Unit of Intravenous (IV) Cannulas

 

Intravenous (IV) cannulation is a venous access procedure that involves inserting a cannula into a vein. Blo... Read More

Capacity :
IV Cannula with Wings & with Injection Port Needle: 40000 pcs/day IV Cannula with Wings & with Injec
Plant and Machinery cost:
1705.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
31.00 %
TCI :
0.00 Lakhs
Cost of Project :
14615.00Lakhs
Add To Inquiry Basket
Investment opportunity in manufacturing of Lithium Ion (LiFePO4) Cell
Investment opportunity in manufacturing of Lithium Ion (LiFePO4) Cell

 

The Lithium Iron Phosphate Battery (LiFePO4 battery) or LFP Battery (lithium ferrophosphate) is a lithium-io... Read More

Capacity :
25000 Nos/day
Plant and Machinery cost:
3618.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
39.00 %
TCI :
0.00 Lakhs
Cost of Project :
4626.00Lakhs
Add To Inquiry Basket
Production of Magnesium Powder from Dolomite Stone
Production of Magnesium Powder from Dolomite Stone

 

Magnesium (Mg) is a silvery white metal that resembles aluminium in colour but is one-third the weight. Magn... Read More

Capacity :
166.7 MT/day
Plant and Machinery cost:
4160.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
72.00 %
TCI :
0.00 Lakhs
Cost of Project :
13904.00Lakhs
Add To Inquiry Basket
Emerging Opportunities of Dal Mill (Roasted Gram Split, Dal & Chana)
Emerging Opportunities of Dal Mill (Roasted Gram Split, Dal & Chana)

 

India is destined ... Read More

Capacity :
Annagiri Roasted Gram Split:6.5 MT Per Day Mosambi Roasted Gram Split:6.5 MT Per Day Radhe Roasted G
Plant and Machinery cost:
138.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
909.00Lakhs
Add To Inquiry Basket
Start A Wood Plastic Composite Manufacturing Business.
Start A Wood Plastic Composite Manufacturing Business.

 

Wood-plastic compo... Read More

Capacity :
10,000,000 Sq.Ft. per annum
Plant and Machinery cost:
142.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
687.00Lakhs
Add To Inquiry Basket
Business opportunities in Packaged Drinking Water with PET Bottle
Business opportunities in Packaged Drinking Water with PET Bottle

 

When humans are th... Read More

Capacity :
Packaged Drinking Water 200 ml Size Bottle: 28,800 Bottles per Day Packaged Drinking Water 500 ml Si
Plant and Machinery cost:
306.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
632.00Lakhs
Add To Inquiry Basket
Production of Bitumen (Polymer Modified Bitumen, Bitumen Emulsion, Cutback Bitumen)
Production of Bitumen (Polymer Modified Bitumen, Bitumen Emulsion, Cutback Bitumen)

 

Bitumen is a typical low-cost thermoplasti... Read More

Capacity :
Polymer Modified Bitumen: 4.0 MT Per Day Bitumen Emulsion: 8.0 MT Per Day Cutback Bitumen : 8.0 MT P
Plant and Machinery cost:
95.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
80.00 %
TCI :
0.00 Lakhs
Cost of Project :
540.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Cold Storage 5000 MT 29.00 507.00
Truck Body Building M.S. Oil Tanker Truck Body Cap.. 28 KL : 144 Nos./Annum S.S. Milk Tanker Truck Body Cap. 20 KL : 30.00 310.00
Production of Disposable ... 0 0.00 0.00
Agriculture Storage and W... 0 0.00 0.00
LPG Cylinders (Domestic a... LPG Cylinders (Domestic 14.2 Kgs Size) 640 nos. per day LPG Cylinders (Commerical 18 Kgs Size) 5 32.00 391.00
Grain & Potato Based Vodk... Vodka from Grain & Potato:30 KLs/Day 25.00 6316.00
NPK Compound Fertilizer (... 400 Mt/Day 27.00 2613.00
Oxygen Gas Plant (Industr... 300000 Cylinders/Annum 30.00 1006.00
Milk Processing (Milk, P... Milk Processing 10000 Ltrs/Day Pasteurised Milk (1 Ltr Pouch) :1000 Kgs/day Skimmed Milk (1 Ltr 15.00 519.00
Sanitary Napkins 18000 PKTS/day Each Pkt = 8 Pcs. 29.00 460.00
Button Mushroom Cultivati... 5000 Kgs./day 28.00 1277.00
Baker’s Yeast Baker's Yeast Cream :7000 Kgs/day Baker's Yeast Powder :3000 Kgs/day 28.00 1101.00
Goat Rearing & Breeding Goat Meat :31,320 Kgs/annum Goat Skin :2000 Nos/annum Goat Milk :360,000 Ltrs/annum Goat Ma 12.00 558.00
Mustard Oil Mustard Oil :3000 MT/annum Deoiled cake :5,700 MT/annum 27.00 373.00
Activated Carbon from Coc... Activated Carbon :900 MT/annum Bio-Oil by Product :1,140 MT/annum 25.00 283.00
Liquor from Mahua (Wine a... Wine (750 ml Size) :4,000,000 Bottles/annum Whiskey (375 ml Size) : 4,000,000 Bottles/annum Brand 27.00 3019.00
HDPE Pipes 1,440,000 Kgs. /annum 27.00 357.00
Electronic Toys 1,500,000 PCS/annum 28.00 234.00
Aluminium Cans for Brewer... 15,050,000 Pcs. /annum 26.00 712.00
ADHESIVE FROM MAIZE STARC... 1,500,000 Kgs/annum 26.00 134.00
Amusement Park Detailed ... 4000.00 ENT/day 27.00 2041.00
Beer Plant Manufacturing ... 5169000 Bottles/Annum 22.00 1290.00
Baby Wet Wipes and Facial... Baby Wet Wipes (100 Pcs/ Pkt.) : 3,600,000 Pkts/Annum Facial Wet Tissues (30 Pcs/ Pkt.) : 3,600 29.00 842.00
Production of Soft Gelati... 1,800,000 Th.Nos./annum 27.00 478.00
Electric Motors 60,000 Nos/annum 29.00 313.00
Virgin Coconut Oil Virgin Coconut Oil (Packed in 1 Ltr Glass Bottle) : 180,000Ltrs/Annum Deffated Coconut Powder (Bye P 15.00 258.00
Dish Wash (Liquid & Soap... Dishwash Liquid :300,000 Kgs/annum Dishwash Soap Bar : 300,000 Kgs/annum Detergent 27.00 204.00
PORCELAIN INSULATOR 3,500MT/Annum 25.00 1010.00
Chilli Oil from Red Chill... Chilli Oil : 6000 kg/annum Paprika Oleoresin : 18000 kg/annum 24.00 135.00
Production of Pectin from... 150,000Kgs/annum 23.00 1660.00
12345678910...

Showing 241 - 300 of 2609 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR