Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Project Report on Catenary Wires and Conductors used in Railway Electrification
Project Report on Catenary Wires and Conductors used in Railway Electrification

The Catenary wire comprises 19 strands of cadmium copper, each strand of 2.10 mm dia, with overall dia of 10.5 m... Read More

Capacity :
Catenary Wire (Hard Drawn Stranded Magnesium Copper Conductor) Size 24 sq.mm. (7/2.10 mm) : 5.3 MT
Plant and Machinery cost:
260.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
871.00Lakhs
Add To Inquiry Basket
MS Binding Wires
MS Binding Wires

Wire binding is a popular commercial book binding method, and is known by a number of different names including twin l... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Optical Fiber Cable (OFC) Manufacturing Industry
Optical Fiber Cable (OFC) Manufacturing Industry

Optical Fiber Cable (OFC) Manufacturing Industry. Production of Fiber Optic Cables. H... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Optical Fiber Cable
Optical Fiber Cable

An optical fiber (or fiber) is a glass or plastic fiber that carries light along its length. Fiber optics is the overl... Read More

Capacity :
1000000 Kmtrs./Annum
Plant and Machinery cost:
1411.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
8342.00Lakhs
Add To Inquiry Basket
Fiber Optic Cable Production
Fiber Optic Cable Production

Fiber Optic Cable Production. Optical Fiber Cable Manufacturing Industry

...
Read More
Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Low Tension Cables, LT Power Cables Manufacturing Industry
Low Tension Cables, LT Power Cables Manufacturing Industry

Low Tension Cables, LT Power Cables Manufacturing Industry. Industrial LT Cables Prod... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Resin Cored Soldering Wire
Resin Cored Soldering Wire

Resin cored solder wire is suitable for safe use on electrical and electronic work such as com... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Armoured Cable
Armoured Cable

Armoured cable has an extra layer of protection to keep it from being cut or abraded. The armor layer of coax cable is a foil wrap that is ribbed l... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Wire Nail
Wire Nail

-

Read More
Capacity :
200 Ton/Annum
Plant and Machinery cost:
4.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
52.00%
Break Even Point (BEP):
32.00 %
TCI :
45.00 Lakhs
Cost of Project :
45.00Lakhs
Add To Inquiry Basket
COPPER FLATS AND COPPER TUBES
COPPER FLATS AND COPPER TUBES

Copper is the most commonly used architectural metal now-a-days. Copper plays an essential role in the modern building. From recycled cladding and ... Read More

Capacity :
12 MT/day
Plant and Machinery cost:
198.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
56.00 %
TCI :
567.00 Lakhs
Cost of Project :
567.00Lakhs
Add To Inquiry Basket
Wire Nail & Wire Drawing Plant
Wire Nail & Wire Drawing Plant

Wire nail is a common product, which is normally used in daily life. It is manufactured from low carbon and high carbon, hard or soft drawn steel w... Read More

Capacity :
1.00 MT/day
Plant and Machinery cost:
5.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
40.00 %
TCI :
47.00 Lakhs
Cost of Project :
47.00Lakhs
Add To Inquiry Basket
Business Plan of Copper Wire Manufacturing (Wire Drawing & Enameling)
Business Plan of Copper Wire Manufacturing (Wire Drawing & Enameling)

Copper is definitely stretched, molded, and shaped; is resistant to corrosion; and conducts heat and electricity effic... Read More

Capacity :
Copper Wire (0.914 to 0.376 mm): 350 Kgs / Day Enamelled Copper Wire (0.914 to 0.376 mm): 350 Kgs /
Plant and Machinery cost:
437.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
951.00Lakhs
Add To Inquiry Basket
HT (High Tensile Wire) Manufacturing Industry
HT (High Tensile Wire) Manufacturing Industry

HT (High Tensile Wire) Manufacturing Industry. Production of High Tensile Steel Wire ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Wire Drawing with Galvanizing Plant
Wire Drawing with Galvanizing Plant

Wire drawing is an important industrial process, providing commercial products. Drawing of wire from metal rod is a me... Read More

Capacity :
12 MT/Day
Plant and Machinery cost:
171.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
532.00Lakhs
Add To Inquiry Basket
PVC Wires and Cables
PVC Wires and Cables

Cables are the source of carrying power and signal in power plants, refineries, process industries. PVC cables are extensiv... Read More

Capacity :
10 Kmtrs./Day
Plant and Machinery cost:
90.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
444.00Lakhs
Add To Inquiry Basket
Steel Wire Rope
Steel Wire Rope

A steel wire rope is made up of individual steel wires spun into a strand. A number of strands are closed over a centr... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
High Tensile Wire Used in Prestressed Concrete Poles and Railway Sleepers
High Tensile Wire Used in Prestressed Concrete Poles and Railway Sleepers

High tensile wires are those which can withstand great strain without breaking or becoming deformed. High tensile wire is made with higher carbon s... Read More

Capacity :
60 MT/day
Plant and Machinery cost:
224.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
958.00 Lakhs
Cost of Project :
958.00Lakhs
Add To Inquiry Basket
MIG Welding Wire
MIG Welding Wire

MIG ... Read More

Capacity :
MIG Welding Wire : 12000 MT/annum
Plant and Machinery cost:
921.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
2052.00 Lakhs
Cost of Project :
2052.00Lakhs
Add To Inquiry Basket
COPPER WIRE DRAWING (From Higher Size to Very Thin Size Used in Electrical Cables)
COPPER WIRE DRAWING (From Higher Size to Very Thin Size Used in Electrical Cables)

Copper wire is an essential material for electrical cables, motor and transformer winding. It is available in different gauges. The gauge of the co... Read More

Capacity :
500 Kg. / Day
Plant and Machinery cost:
68.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
46.00 %
TCI :
167.00 Lakhs
Cost of Project :
167.00Lakhs
Add To Inquiry Basket
WIRE MESH (HEXAGONAL SQUARE)
WIRE MESH (HEXAGONAL SQUARE)

Wire mesh is known as wire netting, which is supplied in various types of meshes and for various purposes. It is used by the builders i.e. fencing ... Read More

Capacity :
10 MT/Day
Plant and Machinery cost:
23.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
53.00%
Break Even Point (BEP):
34.00 %
TCI :
181.00 Lakhs
Cost of Project :
181.00Lakhs
Add To Inquiry Basket
Enameled Copper Wire
Enameled Copper Wire

Enameled wire is an insulated wire used in winding of armatures in transformers, switch gears and other electrical equipments. When connected to th... Read More

Capacity :
500 Kgs/Day
Plant and Machinery cost:
22.00 Lakhs
Working Capital :
52.00
Rate of Return (ROR):
37.43%
Break Even Point (BEP):
46.95 %
TCI :
114.00 Lakhs
Cost of Project :
114.00Lakhs
Add To Inquiry Basket
Setup plant  Of WIRE NAILS
Setup plant Of WIRE NAILS

Wire nails are a type of fastener, often used in construction and building projects. ... Read More

Capacity :
Wire Nails 160 MT Per Day
Plant and Machinery cost:
2635.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
3550.00Lakhs
Add To Inquiry Basket
Manufacturing of Catenary Wires and Conductors used in Railway Electrification
Manufacturing of Catenary Wires and Conductors used in Railway Electrification

Manufacturing of Catenary Wires and Conductors used in Railway Electrification. Booming Industry for Startups in Railway ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Wire Drawing with Wire Galvanizing Plant
Wire Drawing with Wire Galvanizing Plant

Wire Drawing with Wire Galvanizing Plant. Hot Dip Galvanizing Plant. Galvanized Mild Steel (MS) Wire

<...
Read More
Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Aluminium Wire & Cables
Aluminium Wire & Cables

Wire means Solid conductor or Insula... Read More

Capacity :
Aluminium Wire (AAAC) Conductor: 900 MT/Annum Aluminium Wire (ACSR) Conductor: 400 MT/Annum Aluminiu
Plant and Machinery cost:
314.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
62.00 %
TCI :
579.00 Lakhs
Cost of Project :
579.00Lakhs
Add To Inquiry Basket
PVC ELECTRIC WIRES & CABLES
PVC ELECTRIC WIRES & CABLES

In the field of insulated cables, PVC cables have occupied an important place and in fact these are most popularly used in homes for domestic wirin... Read More

Capacity :
3000000 Mtrs/Annum
Plant and Machinery cost:
36.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
48.00%
Break Even Point (BEP):
38.00 %
TCI :
151.00 Lakhs
Cost of Project :
151.00Lakhs
Add To Inquiry Basket
Power Cable
Power Cable

Electrical power cables used for transmission and distribution purposes consist of conductors stranded from plain high conductively annealed copper... Read More

Capacity :
2050 MT Aluminium Power Cable/Annum 350 MT Copper Power Cable/Annum
Plant and Machinery cost:
80.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
60.00 %
TCI :
305.00 Lakhs
Cost of Project :
305.00Lakhs
Add To Inquiry Basket
Nylon Coating on Zinc Wire (Wire “O“ Wire)
Nylon Coating on Zinc Wire (Wire “O“ Wire)

Polyamides are a group of thermoplastic polymers containing amid groups in the main chain. They are popularly known as Nylons, which is the trade ... Read More

Capacity :
20000 Meters/day
Plant and Machinery cost:
45.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
38.00%
Break Even Point (BEP):
48.00 %
TCI :
211.00 Lakhs
Cost of Project :
211.00Lakhs
Add To Inquiry Basket
WIRE DRAWING LUBRICANTS
WIRE DRAWING LUBRICANTS

Lubricants are the products used for the lubrication of sliding or rolling elements. Product similar to these with respect to composition, manufact... Read More

Capacity :
600 Kg./day
Plant and Machinery cost:
21.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
48.00%
Break Even Point (BEP):
36.00 %
TCI :
125.00 Lakhs
Cost of Project :
125.00Lakhs
Add To Inquiry Basket
GALVANIZED IRON WIRE
GALVANIZED IRON WIRE

The production of G.I. Wire from H.B. wire is not complicated. In case of H.B. wire drawing from H.B. bars, certain mechanical process is used. An ... Read More

Capacity :
8.00 MT./day
Plant and Machinery cost:
70.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
32.00 %
TCI :
419.00 Lakhs
Cost of Project :
419.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Wire Nails
Manufacturing Business Of Wire Nails

Wire nails are a type of fastener typically used... Read More

Capacity :
Wire Nails: 48,000 MT Per Annum
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
2600.00Lakhs
Add To Inquiry Basket
Instrument Cable
Instrument Cable

Instrumentation cables are multiple conductor cables that convey low energy electrical signals used for monitoring or ... Read More

Capacity :
500V Overall Screened Single and Multipair Armoured Instrumentation Cable 90 Meter : 44297 Pkts./D
Plant and Machinery cost:
94.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
953.00Lakhs
Add To Inquiry Basket
MIG Welding Wire
MIG Welding Wire

MIG Wire is Copper coated strong wire. MIG wires are applied to weld numerous ferrous and non-ferrou... Read More

Capacity :
840 MT/Annum
Plant and Machinery cost:
122.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
318.00Lakhs
Add To Inquiry Basket
Aluminium Wire & Cables Manufacturing Industry
Aluminium Wire & Cables Manufacturing Industry

Aluminium Wire & Cables Manufacturing Industry. Start an Electric Wire & Cable Busine... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
PVC Insulated Winding Wires for Submersible Motors
PVC Insulated Winding Wires for Submersible Motors

Winding wires are insulated with a ve... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Solder Wire & Flux
Solder Wire & Flux

Solder wire is an alloy used in the electronics industry for soldering electronic components onto the printed circuit board or two pieces of metal.... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
COPPER WIRE DRAWING (From Higher Size To Very Thin Size Used In Electrical Cables)
COPPER WIRE DRAWING (From Higher Size To Very Thin Size Used In Electrical Cables)

Copper wire is an essential material for electrical cables and motor and transformer winding. Copper wire is available in different gauges (42 gaug... Read More

Capacity :
150 MT/Annum
Plant and Machinery cost:
69.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
42.00 %
TCI :
167.00 Lakhs
Cost of Project :
167.00Lakhs
Add To Inquiry Basket
R-F Coaxial Cable
R-F Coaxial Cable

A coaxial Cable is one that consists of two conductors that share a common axis. The inner conductor is typically a straight wire, either solid or ... Read More

Capacity :
20000 Meters/Day
Plant and Machinery cost:
100.00 Lakhs
Working Capital :
200.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
38.00 %
TCI :
400.00 Lakhs
Cost of Project :
400.00Lakhs
Add To Inquiry Basket
Wire Drawing Lubricant
Wire Drawing Lubricant

The wire drawing lubricant is a special type of product in the field of lubricant. Wire drawing lubrication is an extremely complicated, often poor... Read More

Capacity :
600 kg/Day
Plant and Machinery cost:
13.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
44.00 %
TCI :
68.00 Lakhs
Cost of Project :
68.00Lakhs
Add To Inquiry Basket
Rosin Cored Soft Soldering Wire
Rosin Cored Soft Soldering Wire

Soldering is a process of joining solid components by introduction between them a molten alloy (solder) having a lower melting poing than that of ... Read More

Capacity :
500 Kg Soldering Wire/Day
Plant and Machinery cost:
38.40 Lakhs
Working Capital :
86.65
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
35.70 Lakhs
Cost of Project :
35.70Lakhs
Add To Inquiry Basket
PVC Wire & Cables
PVC Wire & Cables

P.V.C. coated cable and wire are extensively used in all electrical linings, domestic lighting and all other purposes. The demand for PVC coating e... Read More

Capacity :
1600 Mtrs/ Day
Plant and Machinery cost:
23.00 Lakhs
Working Capital :
87.00
Rate of Return (ROR):
26.18%
Break Even Point (BEP):
59.65 %
TCI :
163.00 Lakhs
Cost of Project :
163.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Project Report on Catenar... Catenary Wire (Hard Drawn Stranded Magnesium Copper Conductor) Size 24 sq.mm. (7/2.10 mm) : 5.3 MT 30.00 871.00
MS Binding Wires 0 0.00 0.00
Optical Fiber Cable (OFC)... 0 0.00 0.00
Optical Fiber Cable 1000000 Kmtrs./Annum 32.00 8342.00
Fiber Optic Cable Product... 0 0.00 0.00
Low Tension Cables, LT Po... 0 0.00 0.00
Resin Cored Soldering Wir... 0 0.00 0.00
Armoured Cable 0 0.00 0.00
Wire Nail 200 Ton/Annum 52.00 45.00
COPPER FLATS AND COPPER T... 12 MT/day 47.00 567.00
Wire Nail & Wire Drawing ... 1.00 MT/day 45.00 47.00
Business Plan of Copper W... Copper Wire (0.914 to 0.376 mm): 350 Kgs / Day Enamelled Copper Wire (0.914 to 0.376 mm): 350 Kgs / 30.00 951.00
HT (High Tensile Wire) Ma... 0 0.00 0.00
Wire Drawing with Galvani... 12 MT/Day 29.00 532.00
PVC Wires and Cables 10 Kmtrs./Day 29.00 444.00
Steel Wire Rope 0 0.00 0.00
High Tensile Wire Used in... 60 MT/day 27.00 958.00
MIG Welding Wire MIG Welding Wire : 12000 MT/annum 27.00 2052.00
COPPER WIRE DRAWING (From... 500 Kg. / Day 43.00 167.00
WIRE MESH (HEXAGONAL SQUA... 10 MT/Day 53.00 181.00
Enameled Copper Wire 500 Kgs/Day 37.43 114.00
Setup plant Of WIRE NAIL... Wire Nails 160 MT Per Day 27.00 3550.00
Manufacturing of Catenary... 0 0.00 0.00
Wire Drawing with Wire Ga... 0 0.00 0.00
Aluminium Wire & Cables Aluminium Wire (AAAC) Conductor: 900 MT/Annum Aluminium Wire (ACSR) Conductor: 400 MT/Annum Aluminiu 28.00 579.00
PVC ELECTRIC WIRES & CABL... 3000000 Mtrs/Annum 48.00 151.00
Power Cable 2050 MT Aluminium Power Cable/Annum 350 MT Copper Power Cable/Annum 45.00 305.00
Nylon Coating on Zinc Wir... 20000 Meters/day 38.00 211.00
WIRE DRAWING LUBRICANTS 600 Kg./day 48.00 125.00
GALVANIZED IRON WIRE 8.00 MT./day 46.00 419.00
12

Showing 41 Product(s)

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR