• 0

Project Consultancy, Reports & Profiles

1.   What are The Natural Resources in the Congo

The Republic of Congo has enormous potential for hydroelectric power. In 2006, it agreed to a $9 billion project with U.S.-based Tri-Star Power, which would have created a dam on the Sangha River, requiring that 40 square miles (103 km2) of rainforest be cleared and hundreds of people resettled. The project is on hold because residents are opposed to it. There is also potential for mining—the country contains an estimated US$24 trillion worth of minerals, including copper, cobalt, diamonds, gold and uranium. These resources remain largely untapped. Congolese exports consist mainly of raw materials such as wood, coffee and cocoa beans.


2. What are the Business Opportunities in Congo?

Though it may not be the first country to consider where to start a business, the Congo offers some unique opportunities for small businesses. The costs are low, and taxes are low, but plenty of potential consumers and business opportunities are still to explore. If you’re looking at investing in another country, consider the Congo; here’s why this might be the right move for your business. Several factors have made Congo an attractive place for foreign investors, including its favourable geographical location. The Democratic Republic of Congo lies at a crossroads of land, sea and air transport. This has made it an important transport corridor between Europe and Asia on one side and Africa on another. It is also rich in natural resources, including gold, diamonds and coltan (used to make cell phones). In addition to abundant natural resources, there are also many human resources available: 45 million people live here. Congolese citizens are educated and multilingual; they speak French as well as at least two local languages—Swahili or Lingala—and often English as well.


3. What Businesses are Successful in Congo?

One of Africa’s largest economies and one of its fastest-growing, The Democratic Republic of Congo (DRC) has a population estimated at 68 million people. With more than 80 per cent living on less than $1 per day, but with vast mineral resources and an educated workforce, now is a good time to invest in DRC. There have been extensive efforts to improve infrastructure in recent years, including roads and railways. Investing here could be extremely profitable for companies willing to take a risk. The country also boasts impressive human capital. Over 90% of Congolese are literate, and 50% have completed secondary education. This makes it easier to find skilled workers, often very inexpensive due to low wages and high unemployment rates in urban areas. The government is also open to foreign investment. It offers incentives like tax holidays or other benefits through special economic zones such as Kinshasa Industrial Park, where investors can get tax breaks for up to 20 years if they build factories within these zones.

 

4. Business-Friendly Policies and Government Initiatives;

The government of Congo has been working to make doing business easier for its citizens and investors, enacting a host of policies that enhance outlining procedures regarding public-private partnerships (PPP) agreements. This is an important step forward in attracting investors who are interested in PPPs as a means of funding infrastructure projects.


5. Congo Industrial Infrastructure

The government is making efforts to improve infrastructure and build a better economy by focusing on industrial development. The government has also set up free trade zones in Boma, Matadi, and Lubumbashi. Over 1 million tourists visit Congo each year and spend more than $500 million on travel alone. The country is also rich with natural resources, including cobalt, diamonds, copper ore, gold, iron ore, tin ore, as well as uranium reserves and other precious metals. These resources have been exploited for many years but were not developed properly due to corruption within governments of previous regimes. This led to no proper funding of infrastructure or maintenance of existing infrastructures, which are now starting to fail. Many investors are taking advantage of these opportunities and investing heavily in building new roads, railways, ports etc., leading to further economic growth.

 

6. What are the steps for Starting a Business in Congo?

In order to start a business in Congo, it’s important to learn about local regulations first. Here are some things you need to know:

1. A Congolese company can be created under three forms of legal entity: General Partnership (Société en Nom Collectif), Limited Liability Company (Société à Responsabilité Limitée) and Joint-Stock Company (Société Anonyme).

2. Foreigners cannot own land in Congo; however, they can lease land for 50 years.

3. The minimum capital requirement for all companies is 100 million CFA francs (USD 175,000).

4. All companies must have at least one shareholder and one director/manager; shareholders may not act as directors or managers unless they are directors or managers at another company.

5. Shareholders do not enjoy limited liability protection, so any debts incurred by the company will become their responsibility.

6. Director/managers must reside in Congo and hold a Congolese passport. 7. The government charges an annual tax on profits between 0% and 10%. 8. If you want to hire employees, you will have to register with SONAPI (the national social security fund); however, there are no restrictions on foreign ownership when it comes to hiring workers.

9. There are no restrictions on foreign ownership when setting up a business.

10. To register your new company, you will need two copies of your articles of incorporation and five copies of your registration form from SONAPI. It would help if you took care to select a name that does not infringe upon that of another registered company; otherwise, your application could be rejected.

 

7. Market Size of Congo

The total size of a market is important for any business. However, knowing how large or small it is and where you might fit into it can be vital to identifying business opportunities. The market in Congo may seem like a small one, with a population of 79 million people and a gross domestic product (GDP) per capita of $2,600 in 2015. However, Congo’s GDP has been growing at an average rate of 7% per year over the past decade.

 

8. Spending power in Congo

With a population of over 80 million, and a GDP of over $30 billion, there is plenty of room for new businesses to succeed. The country is also rich in natural resources such as diamonds, gold, and oil. This means that there are large corporations looking to invest or exploit these resources. You may even be able to partner with one of these companies to achieve your goals. The only issue is that corruption can be rampant, and deals could get complicated quickly.


9. Industrial growth of Congo

The DRC has several mines with mineral resources, including cobalt, copper, diamonds, gold, silver, and zinc. The nation also has considerable petroleum reserves; however, oil deposits are largely untapped. Other sectors such as forestry, farming and fishing are also important to Congo’s economy. According to reports published by the National Bank of Congo (BNC), gross domestic product (GDP) growth reached 7.5 per cent in 2015. The report also revealed that a 6 per cent growth rate was expected for 2016. This is due to an increase in mining activities which contributed to a 4.7 per cent increase in GDP during the first quarter of 2016. This is compared to the 2.8 per cent growth registered during the same period last year. This will be further boosted by government initiatives toward developing infrastructure, agriculture, and the services sector, including banking services.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
WOODEN DOORS AND FRAMES
WOODEN DOORS AND FRAMES

Carpentry and joinery are common terms used with any class of work with wood. Strictly speaking carpentry deals with all works of a carpentry such ... Read More

Capacity :
80 Pcs./day
Plant and Machinery cost:
10.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
50.00%
Break Even Point (BEP):
42.00 %
TCI :
93.00 Lakhs
Cost of Project :
93.00Lakhs
Add To Inquiry Basket
FOOD PROCESSING UNIT(CASSAVA PROCESSING INTO FLOUR STARCH, GARI AND CUSCUS)
FOOD PROCESSING UNIT(CASSAVA PROCESSING INTO FLOUR STARCH, GARI AND CUSCUS)

There are hundreds of commercial varieties of cassava in various equatorial regions. These varieties fall into two main categories: Manihot palmate... Read More

Capacity :
(Cassava Flour 3000, Starch 30000, Gari 1500, Cuscus 1500) MT / Annum
Plant and Machinery cost:
400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
84.00 %
TCI :
1500.00 Lakhs
Cost of Project :
1500.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes and Needles Manufacturing
Disposable Plastic Syringes and Needles Manufacturing

With the development of pharmaceutica... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

The disposable plastic syringe ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen (CO2, gas at 00/1 matm., 1.429g./l, crit. Pressure, 49.7 Matm.) is a colorless, odourless, and tasteless gas, somewhat heavier than air. It ... Read More

Capacity :
1440 Cubie Meter/Day
Plant and Machinery cost:
50.00 Lakhs
Working Capital :
18.00
Rate of Return (ROR):
18.19%
Break Even Point (BEP):
75.00 %
TCI :
101.00 Lakhs
Cost of Project :
101.00Lakhs
Add To Inquiry Basket
Fully Automatic Match Box With Match Sticks (Wooden Match Sticks & Waxed Strips)
Fully Automatic Match Box With Match Sticks (Wooden Match Sticks & Waxed Strips)

The various sizes and type of match boxes are largely used in all the homes commercial section shops and industries. The Match phosphorus coating l... Read More

Capacity :
1500 Lacs/Annum
Plant and Machinery cost:
86.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
43.00 %
TCI :
213.00 Lakhs
Cost of Project :
213.00Lakhs
Add To Inquiry Basket
Nerol Soap and Detergent
Nerol Soap and Detergent

Chemically speaking soaps are salt of fatty acid, generally mixture of various such salts. Based upon their properties, soaps are broadly classifie... Read More

Capacity :
1200.00 MT/Year
Plant and Machinery cost:
54.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
48.00%
Break Even Point (BEP):
66.00 %
TCI :
131.00 Lakhs
Cost of Project :
131.00Lakhs
Add To Inquiry Basket
Paper Napkins, Toilet Rolls & Facial Tissue
Paper Napkins, Toilet Rolls & Facial Tissue

Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world with out a printed books and news... Read More

Capacity :
1000 Kgs/Day
Plant and Machinery cost:
6.00 Lakhs
Working Capital :
38.00
Rate of Return (ROR):
96.61%
Break Even Point (BEP):
25.40 %
TCI :
53.00 Lakhs
Cost of Project :
53.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate

 

L-Glutamic acid a... Read More

Capacity :
L-Glutamic Acid 50 MT Per Day Monosodium Glutamate 15 MT Per Day
Plant and Machinery cost:
867.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
2590.00Lakhs
Add To Inquiry Basket
Business Plan For Sanitary Napkins
Business Plan For Sanitary Napkins

Feminine napkins, generally called sanitary napkins or menstruation pads, are absorbe... Read More

Capacity :
Sanitary Napkins 1,440,000 Pkts Per Annum
Plant and Machinery cost:
26.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
84.00Lakhs
Add To Inquiry Basket
Start Production of Expandable & High Purity Graphite
Start Production of Expandable & High Purity Graphite

Expandable Graphite refers to a form of graphite that has bee... Read More

Capacity :
Expandable Graphite 10 MT Per Day High Purity Graphite 10 MT Per Day
Plant and Machinery cost:
206.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1598.00Lakhs
Add To Inquiry Basket
Start  Waste Lubricating Oil Recycling Plant
Start Waste Lubricating Oil Recycling Plant

Waste Lubricating Oil Recyc... Read More

Capacity :
Recycled Lubricating Oil 18,000 KLs per Annum Spent Clay as by product 1,890 KLs per Annum
Plant and Machinery cost:
355.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
32.00 %
TCI :
0.00 Lakhs
Cost of Project :
3101.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Carbon Composite Bicycle
Start Manufacturing Of Carbon Composite Bicycle

Carbon composite bicycles a... Read More

Capacity :
Carbon Composite Bicycle 12 Nos per Day
Plant and Machinery cost:
413.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
594.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Latex Toy Balloons
Start Manufacturing Of Latex Toy Balloons

Latex toy balloons are flexible, inflatable objects made prim... Read More

Capacity :
Latex Toy Balloons 20,000 PKTS per Day
Plant and Machinery cost:
373.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
883.00Lakhs
Add To Inquiry Basket
Setup Plant Of Craft Beer
Setup Plant Of Craft Beer

 

Craft beer is a t... Read More

Capacity :
-
Plant and Machinery cost:
1519.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
4060.00Lakhs
Add To Inquiry Basket
Start Production Of Ammonium Nitrate
Start Production Of Ammonium Nitrate

 

Are you an entrepreneur looking for... Read More

Capacity :
Ammonium Nitrate 2 MT per Day
Plant and Machinery cost:
53.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
215.00Lakhs
Add To Inquiry Basket
Start Silicon Wafers Business From Electronic Grade Silicon Ingots (Using Metallurgical Grade Silicon)
Start Silicon Wafers Business From Electronic Grade Silicon Ingots (Using Metallurgical Grade Silicon)

 

Silicon wafers are crucial componen... Read More

Capacity :
Silicon Wafers 20 MT Per Day
Plant and Machinery cost:
2505.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
4235.00Lakhs
Add To Inquiry Basket
A Business Plan For Recycling of Lithium Ion Battery
A Business Plan For Recycling of Lithium Ion Battery

Recycling of lithium-ion batteries refers to the process of recovering valuable mater... Read More

Capacity :
-
Plant and Machinery cost:
189.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
468.00Lakhs
Add To Inquiry Basket
Setup Plant of Extraction from Tobacco Waste
Setup Plant of Extraction from Tobacco Waste

Nicotine is a chemical compound that is naturally present in the leaves of the tobacco plant. It is a powerful sti... Read More

Capacity :
-
Plant and Machinery cost:
289.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
32.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Ferro Alloys (Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), Ferro Titanium (FeTi))
A Business Plan for Ferro Alloys (Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), Ferro Titanium (FeTi))

Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), and Fer... Read More

Capacity :
-
Plant and Machinery cost:
1783.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
71.00 %
TCI :
0.00 Lakhs
Cost of Project :
9775.00Lakhs
Add To Inquiry Basket
Setup Egg Powder Industry
Setup Egg Powder Industry

Egg powder is essentially a... Read More

Capacity :
Egg Powder 2,400 Kgs Per Day
Plant and Machinery cost:
489.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
930.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business of Laundry Soap Bars
Start Manufacturing Business of Laundry Soap Bars

 

Laundry soap bars... Read More

Capacity :
Laundry Soap 1,000 Kgs Per Day (1 Kgs Pack 10 Pcs. each 100gms Size)
Plant and Machinery cost:
27.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
72.00 %
TCI :
0.00 Lakhs
Cost of Project :
65.00Lakhs
Add To Inquiry Basket
Start Business of Solar Panel
Start Business of Solar Panel

 

Solar panels are the bac... Read More

Capacity :
Solar Panel 19,980 KW Per Annum
Plant and Machinery cost:
160.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
581.00Lakhs
Add To Inquiry Basket
A Business Plan for Calcium Gluconate
A Business Plan for Calcium Gluconate

Calcium Gluconate is a chemical compound that serves as a crucial supplement for thos... Read More

Capacity :
Calcium Gluonate 20 MT Per Day
Plant and Machinery cost:
293.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
1130.00Lakhs
Add To Inquiry Basket
Start Business of Steel Containers (Cargo Containers)
Start Business of Steel Containers (Cargo Containers)

 

Explore the robust world of steel cargo containers used globally for shipping, storage, and modular construc... Read More

Capacity :
Cargo Containers (Size 20 Feet) 40,000 Nos Per Annum
Plant and Machinery cost:
300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
3105.00Lakhs
Add To Inquiry Basket
A Business Plan for Latex Mattress
A Business Plan for Latex Mattress

Latex Mattresses are distinguished by their core material, which is derived from the sap of the rubber tree (Hevea bra... Read More

Capacity :
Latex Mattress Size: 75 x 72 x 5 inch 90 Nos. Per Day
Plant and Machinery cost:
204.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
626.00Lakhs
Add To Inquiry Basket
Opportunity in Spices Business (Red Chili, Turmeric, Coriander, Cumin & Garam Masala)
Opportunity in Spices Business (Red Chili, Turmeric, Coriander, Cumin & Garam Masala)

Spices are naturally occurring substances derived from parts of plants such as seeds, fruits, roots... Read More

Capacity :
-
Plant and Machinery cost:
150.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
418.00Lakhs
Add To Inquiry Basket
Start Prodcution of Poultry Farming with Manure Treatment & Egg Tray Production
Start Prodcution of Poultry Farming with Manure Treatment & Egg Tray Production


Th... Read More

Capacity :
-
Plant and Machinery cost:
324.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
684.00Lakhs
Add To Inquiry Basket
Setup Coking Coal Washing Unit
Setup Coking Coal Washing Unit

 

Coking coal w... Read More

Capacity :
Coal Washing (Job Work) 5,000 MT Per Day By Product (Waste Coal) 1,000 MT Per Day
Plant and Machinery cost:
1600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
6000.00Lakhs
Add To Inquiry Basket
A Business Plan For Sodium Silicate from Silica and Soda Ash
A Business Plan For Sodium Silicate from Silica and Soda Ash

Sodium silicate, commonly known as water glass, is a versatile compound with applications acros... Read More

Capacity :
5,000 MT Per Annum
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
1.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
1.00 Lakhs
Cost of Project :
808.00Lakhs
Add To Inquiry Basket
Production of Sodium Hypochlorite
Production of Sodium Hypochlorite

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
India High Silica Quartz Grit Market
India High Silica Quartz Grit Market

High silica quartz is a type of quartz that contains at least 97% SiO2. It is one of the most abundant minerals on Ear... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan For Packaged Drinking Water From Deep Sea Water
A Business Plan For Packaged Drinking Water From Deep Sea Water

 

Packaged drinking water means water derived from s... Read More

Capacity :
Packaged Drinking Water 80,000 Bottles per day
Plant and Machinery cost:
179.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1204.00Lakhs
Add To Inquiry Basket
Start a Business of Double Wall Corrugated Pipes
Start a Business of Double Wall Corrugated Pipes

Double wall corrugated (DWC) pipes are made from high-densit... Read More

Capacity :
Double Wall Corrugated Pipes 20 MT Per Day
Plant and Machinery cost:
449.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1271.00Lakhs
Add To Inquiry Basket
Set A Paint Rollers Manufacturing Business
Set A Paint Rollers Manufacturing Business

Paint rollers are one of the best ways to get a professional... Read More

Capacity :
Paint Roller 8,000 Pcs Per Day
Plant and Machinery cost:
34.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
227.00Lakhs
Add To Inquiry Basket
A Business Plan for Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse
A Business Plan for Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse

 

Bagasse is primarily found in countries that produ... Read More

Capacity :
Biodegradable Disposable Cups 555.5 Th. Pcs Per Day Biodegradable Disposable Plates 312.5 Th. Pcs Pe
Plant and Machinery cost:
1924.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
2789.00Lakhs
Add To Inquiry Basket
Fatty Alcohol Manufacturing Business Plan
Fatty Alcohol Manufacturing Business Plan

Fatty alcohols, also known as aliphatic alcohols, are slight... Read More

Capacity :
Fatty Alcohol 40 MT Per Day By Product (RBD) Palm Oil 45 MT Per Day
Plant and Machinery cost:
800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
5600.00Lakhs
Add To Inquiry Basket
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan

 

Activated carbon is a type of carbon that has been... Read More

Capacity :
Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
606.00Lakhs
Add To Inquiry Basket
Start a Production Business of Rubber Granules from Waste Tyre  Time to Start Your Own Production Business of Rubber Granules from Waste Tyre
Start a Production Business of Rubber Granules from Waste Tyre Time to Start Your Own Production Business of Rubber Granules from Waste Tyre

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business of uPVC and CPVC Pipes
Manufacturing Business of uPVC and CPVC Pipes

PVC material is used to cre... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Now Own Banana Wine Production Business Banana Products Manufacturing Business Ideas
Start Now Own Banana Wine Production Business Banana Products Manufacturing Business Ideas

A sort of alcoholic beverage created from bananas is called Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Triacetin
Manufacturing Business Of Triacetin

 

Triacetin, also k... Read More

Capacity :
5,000 MT Per Annum
Plant and Machinery cost:
2206.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
3524.00Lakhs
Add To Inquiry Basket
Set Up E-Waste Recycling Plant
Set Up E-Waste Recycling Plant

 

If you haven&rsqu... Read More

Capacity :
1,41,000 Kgs per annum 1,05,900 Kgs per annum 88,200 Kgs per annum 18,000 Kgs per annum 5.760
Plant and Machinery cost:
107.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
336.00Lakhs
Add To Inquiry Basket
The Most Amazing and Easy Business Plan of Creamy Peanut Butter Manufacture Start Now Creamy Peanut Butter Production
The Most Amazing and Easy Business Plan of Creamy Peanut Butter Manufacture Start Now Creamy Peanut Butter Production

The Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Moringa Leaf Powder business Start Now Agriculture Based Moringa Leaves Powder Business Opportunity
Moringa Leaf Powder business Start Now Agriculture Based Moringa Leaves Powder Business Opportunity

The Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan Of ISO Freight Containers Manufacturing
Business Plan Of ISO Freight Containers Manufacturing

The industry standard for shipping is ISO Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Beneficial Business Idea for Ginger Oil & Ginger Powder Start Today Great Business Opportunity of Ginger Oil & Ginger Powder
Beneficial Business Idea for Ginger Oil & Ginger Powder Start Today Great Business Opportunity of Ginger Oil & Ginger Powder

Although ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setting up Aluminium Cans for Beverages (Two Pieces) Business
Setting up Aluminium Cans for Beverages (Two Pieces) Business

 

Aluminium cans are one of the most popular con... Read More

Capacity :
Aluminium Cans for Beverages Each 330 ml Size: 3,450 Lakh Pcs per Annum
Plant and Machinery cost:
2605.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
7760.00Lakhs
Add To Inquiry Basket
Startup Business of Sorbitol
Startup Business of Sorbitol

Sorbitol is a sugar alcohol... Read More

Capacity :
Sorbitol 3,000 MT Per Annum
Plant and Machinery cost:
58.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
575.00Lakhs
Add To Inquiry Basket
Production Business uPVC and CPVC Pipes
Production Business uPVC and CPVC Pipes

UPVC is a type of plastic p... Read More

Capacity :
CPVC Pipes 50 mm 1,200 MT Per Annum uPVC Pipes 150 mm 2,400 MT
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
714.00Lakhs
Add To Inquiry Basket
Setup IV Fluid (FFS Technology) Business
Setup IV Fluid (FFS Technology) Business

IV fluid is a watery soluti... Read More

Capacity :
0
Plant and Machinery cost:
4205.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
5770.00Lakhs
Add To Inquiry Basket
Ferro Alloys, Ferro Silicon, High Carbon Ferro Manganese, Silico Manganese Production Business
Ferro Alloys, Ferro Silicon, High Carbon Ferro Manganese, Silico Manganese Production Business

 

Ferroalloys are alloys consisting of a combina... Read More

Capacity :
0
Plant and Machinery cost:
15692.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
24627.00Lakhs
Add To Inquiry Basket
Start Your Own Business Of Auto Brake Pad And Brake Shoe
Start Your Own Business Of Auto Brake Pad And Brake Shoe

The greatest component of a car's braking system is the Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start production of E-Rickshaw and E-Loader
Start production of E-Rickshaw and E-Loader

An E-Rickshaw is an electric vehicle used as a public transportation. It is an economical, efficient and eco-friendly ... Read More

Capacity :
E-Rickshaw: 6,000 Nos Per Annum, E-Loader: 3,000 Nos Per Annum
Plant and Machinery cost:
56.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
1170.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes with Needles  Manufacturing Plant
Disposable Plastic Syringes with Needles Manufacturing Plant

Disposable plastic syringes with needles are a type of medical device used to inject fluids into or draw ... Read More

Capacity :
-
Plant and Machinery cost:
2533.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
36.00 %
TCI :
0.00 Lakhs
Cost of Project :
5405.00Lakhs
Add To Inquiry Basket
Growing Business of Mix Plaster, Block Jointer, Tile Adhesive and M 20 Concrete (Micro Concrete)
Growing Business of Mix Plaster, Block Jointer, Tile Adhesive and M 20 Concrete (Micro Concrete)

 

Important building supp... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start A Business And Change The World, So Now! Start Your Own Lucrative Business of Protein Based Nutrition Foods
Start A Business And Change The World, So Now! Start Your Own Lucrative Business of Protein Based Nutrition Foods

Foods with a high Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Here Are Some Great Tips on How to Get Started In the Ferro Alloys, Ferro Silicon High Carbon, Ferro Manganese, Silico Manganese Industry
Here Are Some Great Tips on How to Get Started In the Ferro Alloys, Ferro Silicon High Carbon, Ferro Manganese, Silico Manganese Industry

What Are Ferro Alloys, Ferro Silicon High Carbon, Fer... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
Activated Carbon From Ric... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Business of Flat G... 0 0.00 0.00
Set Up Business of Double... 0 0.00 0.00
A Business Plan for Bio-D... 10,000 MT Per Annum 28.00 8100.00
Sulphur Powder Manufactur... 20,000 MT Per Annum 24.00 4318.00
Manufacturing Business Gi... 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum 28.00 528.00
Start a Business of Manuf... 1,500 Dz. Per Annum 35.00 34.00
Start Activated Carbon fr... 0 0.00 0.00
Most Demandable Business ... 0 0.00 0.00
12345678910...

Showing 421 - 480 of 641 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR