• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Setting Up Medical College  With Hospital
Setting Up Medical College With Hospital

A hospital is an institution that provides preventive, curative/ameliorative, palliative, or rehabilitative services i... Read More

Capacity :
100 Students, 500 bedded Hospital
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
12300.00Lakhs
Add To Inquiry Basket
Start Ferrosilicon Production Business
Start Ferrosilicon Production Business

Basically, ferrosilicon is a silica and iron alloy that comprises somewhere between 15% and 90% silicon. A "heat-blocker" c... Read More

Capacity :
26.7 MT per day
Plant and Machinery cost:
1900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
3900.00Lakhs
Add To Inquiry Basket
Solar Panel
Solar Panel

Solar panel refers either to a photovoltaic module, a solar thermal energy panel, or to a set of solar photovoltaic (PV) modules electrically conne... Read More

Capacity :
Solar Panel :83.3 KW / day
Plant and Machinery cost:
162.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
804.00Lakhs
Add To Inquiry Basket
Synthetic Soda Ash Production  from Limestone and Brine
Synthetic Soda Ash Production from Limestone and Brine

Soda ash is the trade name for sodium carbonate, a chemical refined from the mineral trona or sodium-carbonate-bearing... Read More

Capacity :
Synthetic Soda Ash :60.0 MT / day Calcium Chloride : 48.0 MT/ day
Plant and Machinery cost:
685.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
2093.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) (Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol)
Active Pharma Ingredients (API) (Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol)

 

The Active Pharmaceutical Ingredient (API) is the part of any drug that produce... Read More

Capacity :
Paracetamol: 500 Kgs / day Cephalexin : 500 Kgs / day Ampicillin Trihydrate: 500 Kgs / day Ibuprofen
Plant and Machinery cost:
347.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
1656.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery
Lithium Ion Battery

Lithium-ion batteries are all about the movement of lithium ions: the ions move one way when the battery charges (when... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack:100,000 Nos per Annum
Plant and Machinery cost:
1017.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
4978.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol

 

Active pharmaceutical ingredients are the active substances that are used in th... Read More

Capacity :
Paracetamol : 1,000.0 Kgs / day Azithromycin: 500.0 Kgs / day Amoxicillin Trihydrate: 500.0 Kg
Plant and Machinery cost:
175.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1322.00Lakhs
Add To Inquiry Basket
Opportunities in Commercial Vehicles Dealership
Opportunities in Commercial Vehicles Dealership

Opportunities in Commercial Vehicles Dealership (Sale of Commercial Vehicles, Spares ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
E-Waste Recycling for Extraction of Precious Metals
E-Waste Recycling for Extraction of Precious Metals

E-Waste Recycling for Extraction of Precious Metals (Nickel, Tin & Zinc), Gold, S... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Hybrid Electric Scooter Assembling
Hybrid Electric Scooter Assembling

Plug-in hybrids (PHEVs) use an electric motor and battery that can be plugged into the power grid to charge the batter... Read More

Capacity :
15,000 Nos per Annum
Plant and Machinery cost:
95.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
73.00 %
TCI :
0.00 Lakhs
Cost of Project :
279.00Lakhs
Add To Inquiry Basket
Matchbox Manufacturing Business
Matchbox Manufacturing Business

Matchbox Manufacturing Business. Start a Match Box, Matchstick Factory. Safety Matche... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Glass Marble
Glass Marble

Marbles are small balls of colored or... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
ZINC INGOTS Manufacturing Business Plan
ZINC INGOTS Manufacturing Business Plan

 

Zn, zinc is a chemical element. At normal temperature, zinc is a slightly brittle metal that, when its oxida... Read More

Capacity :
6 MT per Day
Plant and Machinery cost:
4500000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
52500000.00Lakhs
Add To Inquiry Basket
Medium Density Fiberboard (MDF) Manufacturing Business
Medium Density Fiberboard (MDF) Manufacturing Business

As a dry-formed panel product made from lignocellulosic fibers mixed with a synthetic resin or other suitable binder, ... Read More

Capacity :
100 CBM per Day
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
3100.00Lakhs
Add To Inquiry Basket
Best Plan of Tennis Rackets Manufacturing Business Start Your Own Tennis Rackets Manufacturing Business
Best Plan of Tennis Rackets Manufacturing Business Start Your Own Tennis Rackets Manufacturing Business

 

A Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Silica From Rice Husk Ash
A Business Plan for Silica From Rice Husk Ash

 

The high silica content in the rice husk ash has attract... Read More

Capacity :
0
Plant and Machinery cost:
745.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
1288.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Biodegradable Plastic Bags From Corn & Cassava Starch Granules
Manufacturing Business Of Biodegradable Plastic Bags From Corn & Cassava Starch Granules

 

Biodegradable plastic is plastic that decomposes naturally in t... Read More

Capacity :
0
Plant and Machinery cost:
101.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
324.00Lakhs
Add To Inquiry Basket
Red Chilli Oleoresin Manufacturing Business
Red Chilli Oleoresin Manufacturing Business

 

Chili oleoresin is a natural extract of chili pepp... Read More

Capacity :
Chilli Oleoresin 6,250 Kg Per Day
Plant and Machinery cost:
1988.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
3250.00Lakhs
Add To Inquiry Basket
Start a Business of Low Relaxation Pre-stressed Concrete Steel Strand (LRPC)
Start a Business of Low Relaxation Pre-stressed Concrete Steel Strand (LRPC)

Since the 1950s, Low Relaxation Pre-stressed Concrete Steel ... Read More

Capacity :
Low Relaxation Pre-stressed Concrete 83.3 MT Per Day Steel Strand (LRPC)
Plant and Machinery cost:
3561.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
5370.00Lakhs
Add To Inquiry Basket
Moringa Leaf Powder Production Business
Moringa Leaf Powder Production Business

 

India is the prime producer of Moringa (Drumstick) with an annual production of... Read More

Capacity :
Moringa Leaf Powder 1,000 Kg Per Day
Plant and Machinery cost:
55.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
189.00Lakhs
Add To Inquiry Basket
Manufacturing Business Aluminium Cans & Easy Open End (EOE) for Beverages
Manufacturing Business Aluminium Cans & Easy Open End (EOE) for Beverages

Aluminium cans and easy open end (EOE) for beverages are a t... Read More

Capacity :
Aluminium Cans & Easy Open End (EOE) 40 Lakh Pcs. Per Day
Plant and Machinery cost:
46000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
27.00 %
TCI :
0.00 Lakhs
Cost of Project :
72100.00Lakhs
Add To Inquiry Basket
Production Business Of Medium-Density Polyethylene (MDPE) Pipes
Production Business Of Medium-Density Polyethylene (MDPE) Pipes

Medium-density polyethylene (MDPE) is a type of polyethylene... Read More

Capacity :
MDPE Pipes 5,400 Kgs per day
Plant and Machinery cost:
94.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
376.00Lakhs
Add To Inquiry Basket
Set Up Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan
Set Up Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan

 

Activated carbon is a type of carbon that has been... Read More

Capacity :
Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
606.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Milk and Milk Powder | Most Profitable and High Demandable Business of Milk Processing
Manufacturing Business of Milk and Milk Powder | Most Profitable and High Demandable Business of Milk Processing

The Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Plant of Red Chili Oleoresin Production Red Chili Oleoresin Manufacturing Business Plant
Plant of Red Chili Oleoresin Production Red Chili Oleoresin Manufacturing Business Plant

The oil-soluble red chilli extract known as Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
The Fuel of the Future Compressed Bio Gas CBG Bio CNG plant Save Money and Help save Our Planet with This Eco-Friendly Fuel
The Fuel of the Future Compressed Bio Gas CBG Bio CNG plant Save Money and Help save Our Planet with This Eco-Friendly Fuel

Energy production using Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Copper Powder  Using Electrolytic Copper Refining and  Water Atomization Technology
Copper Powder Using Electrolytic Copper Refining and Water Atomization Technology

Copper powder is an essenti... Read More

Capacity :
1,20,000 Kgs Per Annum
Plant and Machinery cost:
170.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
338.00Lakhs
Add To Inquiry Basket
ISO Freight Containers
ISO Freight Containers

 

An ISO freight co... Read More

Capacity :
15,000 Nos. Per Annum 15,000 Nos. Per Annum
Plant and Machinery cost:
4560.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
9658.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Potassium Permanganate
Manufacturing Business of Potassium Permanganate

 

Potassium permang... Read More

Capacity :
5,000 MT Per Annum
Plant and Machinery cost:
176.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
1287.00Lakhs
Add To Inquiry Basket
Start a Business Of Ethyl Acetate
Start a Business Of Ethyl Acetate

 

Ethyl Acetate, al... Read More

Capacity :
30,000 MT Per Annum
Plant and Machinery cost:
2665.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
39.00 %
TCI :
0.00 Lakhs
Cost of Project :
7206.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Medical Disposables Gowns and Drapes
Start Manufacturing of Medical Disposables Gowns and Drapes

 

Surgical gowns ar... Read More

Capacity :
Medical Gowns 1,250 Pcs Per Day Medical Drapes 1,250 Pcs Per Day
Plant and Machinery cost:
286.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
611.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients Metformin and Ciprofloxacin Manufacturing Business
Active Pharma Ingredients Metformin and Ciprofloxacin Manufacturing Business

Metformin (also known as Gl... Read More

Capacity :
Metformin 2,000 Kgs. Per Day Ciprofloxacin 1,000 Kgs. Per Day
Plant and Machinery cost:
104.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
584.00Lakhs
Add To Inquiry Basket
Profitable Business of Lithium Ion Battery Pack
Profitable Business of Lithium Ion Battery Pack

In a lithium ion (li-ion) b... Read More

Capacity :
Lithium Ion Battery Module Cap. 0.4 KWH 595.2 Module per day Lithium Ion Battery Module Cap. 4.8 K
Plant and Machinery cost:
3600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
5000.00Lakhs
Add To Inquiry Basket
Production of 7-Aminocephalosporanic Acid (7-ACA) – Active Pharma Ingredient
Production of 7-Aminocephalosporanic Acid (7-ACA) – Active Pharma Ingredient

Cephalosporin’s a large group of β-lactam antibiotics, contain a 7-aminocephalosporanic acid (7-ACA) nucleu... Read More

Capacity :
7-Aminocephalosporanic Acid: 2 MT / Day
Plant and Machinery cost:
1791.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
3419.00Lakhs
Add To Inquiry Basket
Automated Vehicle Scrapping and Recycling Unit
Automated Vehicle Scrapping and Recycling Unit

Automated Vehicle Scrapping and Recycling Unit... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan for Lithium Ion Battery Plant Manufacturing of Lithium Ion Battery-Li-ion battery (Battery Assembly)
Business Plan for Lithium Ion Battery Plant Manufacturing of Lithium Ion Battery-Li-ion battery (Battery Assembly)

Lithium batteries are now powering a good range of electrical and electronically devices, including laptop compu... Read More

Capacity :
48 Volt, 60 AH Lithium-Ion Battery Pack : 5 Nos / Day 48 Volt, 80 AH Lithium-Ion Battery Pack : 5 No
Plant and Machinery cost:
306.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
648.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mo... Read More

Capacity :
48 Volt, 20 AH Lithium-Ion Battery Pack: 3498 Nos Per Day
Plant and Machinery cost:
5053.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
7215.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

E-WASTE is a collective name for discarded electronic devices that enter the waste stream from various sources. It inc... Read More

Capacity :
Plastic Granules : 141000 Kgs./Annum Glass Scrap : 105900 Kgs./Annum Copper Scrap : 88200 Kgs./An
Plant and Machinery cost:
106.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
72.00 %
TCI :
0.00 Lakhs
Cost of Project :
190.00Lakhs
Add To Inquiry Basket
Micronutrients Fertilizer Manufacturing Industry
Micronutrients Fertilizer Manufacturing Industry

Micronutrients Fertilizer Manufacturing Industry. Production of Micronutrients Fertil... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Bicycle Rim
Bicycle Rim

A bicycle wheel is a wheel, most commonly a wire wheel, designed for a bicycle. A pair is often called a wheel set, es... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Kaolin (Paints & Cosmetic Grade)
Kaolin (Paints & Cosmetic Grade)

It is one of the most common minerals on earth and can be easily identified by its fine particle size and plate-like s... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Bioplastic Film
Bioplastic Film

Plastic materials have made entry in every sphere of human life because of its superior characteristics such as durability, strengths, shape and mo... Read More

Capacity :
1,500,000 Kgs per Annum
Plant and Machinery cost:
185.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
617.00Lakhs
Add To Inquiry Basket
Investment Opportunity in Bicycle and Cycle Rickshaw Manufacturing Industry
Investment Opportunity in Bicycle and Cycle Rickshaw Manufacturing Industry

Investment Opportunity in Bicycle and Cycle Rickshaw Manufacturing Industry. Best Industry for Starting a Business. Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a descr... Read More

Capacity :
Copper Wire :1.67 MT/day Plastic Granules :7.43 MT/day Glass :3.23 MT/day Fer
Plant and Machinery cost:
131.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
30.00 %
TCI :
0.00 Lakhs
Cost of Project :
1272.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

Bicycles are one of the oldest forms of transportation. Even today millions of people travel by bicycle daily to the... Read More

Capacity :
2000 Nos./day
Plant and Machinery cost:
336.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
1589.00Lakhs
Add To Inquiry Basket
Solar Panel & Electronic Toys
Solar Panel & Electronic Toys

A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provi... Read More

Capacity :
SOLAR PANEL: 25,000Units/annum ELECTRONIC TOYS :1,500,000 Units/annum
Plant and Machinery cost:
498.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
1348.00Lakhs
Add To Inquiry Basket
Solar Panel
Solar Panel

A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provi... Read More

Capacity :
25,000 KW/annum
Plant and Machinery cost:
449.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1126.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplu... Read More

Capacity :
7500 MT/annum
Plant and Machinery cost:
131.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
30.00 %
TCI :
0.00 Lakhs
Cost of Project :
1272.00Lakhs
Add To Inquiry Basket
Detergent Cake & Powder
Detergent Cake & Powder

Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active ... Read More

Capacity :
Detergent Cake :180,000 Kgs/annum Detergent Powder :180,000 Kgs/annum
Plant and Machinery cost:
15.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
76.00 %
TCI :
0.00 Lakhs
Cost of Project :
36.00Lakhs
Add To Inquiry Basket
Bicycle Tyres & Tubes from Natural Rubber
Bicycle Tyres & Tubes from Natural Rubber

Cycling is amongst the most sustaina... Read More

Capacity :
Bicycle Tyres : 450000 Pcs/annum Bicycle Tubes : 450000 Pcs/annum
Plant and Machinery cost:
405.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
52.00 %
TCI :
646.00 Lakhs
Cost of Project :
646.00Lakhs
Add To Inquiry Basket
Paper Napkins, Toilet Paper Rolls & Facial Tissues
Paper Napkins, Toilet Paper Rolls & Facial Tissues

The tissues paper sector has boomed over the last few years. With a move to more luxurious tissue paper and ultra-absorbent... Read More

Capacity :
Toilet Paper Rolls : 7,200,000 Nos./annum Paper Napkin (100 Pcs.): 558,000 Nos./annum Facial Tissue
Plant and Machinery cost:
59.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
341.00Lakhs
Add To Inquiry Basket
Micronutrients Fertilizer for Banana, Vegetables and Citrus
Micronutrients Fertilizer for Banana, Vegetables and Citrus

Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of the primary nutrients; nit... Read More

Capacity :
Micronutrients Fertilizer for Banana:500 Kgs/Day •Micronutrients Fertilizer for Vegetables:500 Kgs/D
Plant and Machinery cost:
7.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
72.00 %
TCI :
30.00 Lakhs
Cost of Project :
30.00Lakhs
Add To Inquiry Basket
Solar Panel Assembling & Solar Power Inverter On Grid, Off Grid with Solar Pump Controller
Solar Panel Assembling & Solar Power Inverter On Grid, Off Grid with Solar Pump Controller

A solar cell, sometimes called a pho... Read More

Capacity :
Poly Crystaline Solar PV Modules (10, 20, 50,100 & 300 Watt): 74,00,000 Nos per annum Solar Inverte
Plant and Machinery cost:
2162.88 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
31.00 %
TCI :
21918.00 Lakhs
Cost of Project :
21918.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity :
Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.39%
Break Even Point (BEP):
31.24 %
TCI :
3972.00 Lakhs
Cost of Project :
3972.00Lakhs
Add To Inquiry Basket
Plastic Waste Recycling Plant
Plastic Waste Recycling Plant

Waste is now a global problem, and one that must be addressed in order to solve the world's resource and energy challenges. Plastics are made from ... Read More

Capacity :
Plastic Granules 4500 Kgs/Day
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
64.52 %
TCI :
219.00 Lakhs
Cost of Project :
219.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Automated Vehicle Scrappi... 1000 Vehicles per Month 29.00 2090.00
Start an Assembling unit ... 0 0.00 0.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
12345678910...

Showing 481 - 540 of 557 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR