Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Micronutrients Fertilizer for Banana, Vegetables and Citrus
Micronutrients Fertilizer for Banana, Vegetables and Citrus

Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of the primary nutrients; nit... Read More

Capacity :
Micronutrients Fertilizer for Banana:500 Kgs/Day •Micronutrients Fertilizer for Vegetables:500 Kgs/D
Plant and Machinery cost:
7.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
72.00 %
TCI :
30.00 Lakhs
Cost of Project :
30.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity :
Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.39%
Break Even Point (BEP):
31.24 %
TCI :
3972.00 Lakhs
Cost of Project :
3972.00Lakhs
Add To Inquiry Basket
Plastic Waste Recycling Plant
Plastic Waste Recycling Plant

Waste is now a global problem, and one that must be addressed in order to solve the world's resource and energy challenges. Plastics are made from ... Read More

Capacity :
Plastic Granules 4500 Kgs/Day
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
64.52 %
TCI :
219.00 Lakhs
Cost of Project :
219.00Lakhs
Add To Inquiry Basket
Iron Ore Mining (E O U)
Iron Ore Mining (E O U)

An ‘Ore’ may be defined as the aggregate of minerals from which a desired constituent mineral can be extracte... Read More

Capacity :
Iron Ore: 800 MT/Day
Plant and Machinery cost:
779.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
43.00 %
TCI :
2485.00 Lakhs
Cost of Project :
2485.00Lakhs
Add To Inquiry Basket
Detergent Cake
Detergent Cake

Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfacta... Read More

Capacity :
4MT/Day
Plant and Machinery cost:
18.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
43.00 %
TCI :
228.00 Lakhs
Cost of Project :
228.00Lakhs
Add To Inquiry Basket
Automatic Packaged Drinking Water
Automatic Packaged Drinking Water

It is needless to mention that water, a compound of Hydrogen and Oxygen is a precious natural gift which is very essential for survival of mankind ... Read More

Capacity :
Packaged Drinking Water (1 Ltr. Size):120000
Plant and Machinery cost:
65.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
268.00 Lakhs
Cost of Project :
268.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

E-waste is a popular, informal name for electronic products nearing the end of their "useful life." Computers, televisions, VCRs, stereos, copiers,... Read More

Capacity :
Monitors:10 Nos./Day•Plastic Granules: 4,600.00 Kgs/Day •Copper Wire Scraps:20 Kgs/Day •Glass from C
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
8.00%
Break Even Point (BEP):
59.00 %
TCI :
613.00 Lakhs
Cost of Project :
613.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or d... Read More

Capacity :
Monitor : 3000 Pcs. /annum,Plastic Dana: 1559 MT/annum,Copper Wire Scraps: 7.5 MT/annum,Glass from
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
526.00 Lakhs
Cost of Project :
526.00Lakhs
Add To Inquiry Basket
Copper Sulphate from Metallic Scrap Copper
Copper Sulphate from Metallic Scrap Copper

Copper is one of the most widespread materials used in the production of electronic equipment and found in multiple appliances as, e.g. circuit boa... Read More

Capacity :
10000 MT /Annum
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
66.00 %
TCI :
1208.00 Lakhs
Cost of Project :
1208.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients(API)
Active Pharma Ingredients(API)
An active ingredient (AI) is the substance in a pharmaceutical drug or a pesticide that is biologically active. The similar terms active pharmaceutic... Read More
Capacity :
Cephalexin Monohydrate: 500 Kgs/Day, Ampicillin Trihydrate: 500 Kgs/Day,Ibuprofen: 500 Kgs/Day
Plant and Machinery cost:
448.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
44.00 %
TCI :
958.00 Lakhs
Cost of Project :
958.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC SYRINGES
DISPOSABLE PLASTIC SYRINGES

A syringe is a simple piston pump co... Read More

Capacity :
16800 Nos. Syringes (2.5 ml size/day),16800 Nos. Syringes/ (5 ml size/day)
Plant and Machinery cost:
104.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
48.00 %
TCI :
255.00 Lakhs
Cost of Project :
255.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC SYRINGES
DISPOSABLE PLASTIC SYRINGES

A plastic syringe is a cylindrical t... Read More

Capacity :
22500000 Nos. 5 Ml Size/Annum, 22500000 Nos. 10 Ml Size/Annum
Plant and Machinery cost:
636.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
42.00 %
TCI :
837.00 Lakhs
Cost of Project :
837.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER AND PET BOTTLES
PACKAGED DRINKING WATER AND PET BOTTLES

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
6,00,00,000 Bottles/Annum
Plant and Machinery cost:
217.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
60.00 %
TCI :
455.00 Lakhs
Cost of Project :
455.00Lakhs
Add To Inquiry Basket
COPPER WIRE DRAWING (From Higher Size To Very Thin Size Used In Electrical Cables)
COPPER WIRE DRAWING (From Higher Size To Very Thin Size Used In Electrical Cables)

Copper wire is an essential material for electrical cables and motor and transformer winding. Copper wire is available in different gauges (42 gaug... Read More

Capacity :
150 MT/Annum
Plant and Machinery cost:
69.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
42.00 %
TCI :
167.00 Lakhs
Cost of Project :
167.00Lakhs
Add To Inquiry Basket
TYRES AND TUBES FOR BICYCLE AND RICKSHAW
TYRES AND TUBES FOR BICYCLE AND RICKSHAW

Tyres and Tubes are the backbone of the bicycle and rickshaw. Bicycle and rickshaw continues to be the principal mode of transport for the low and ... Read More

Capacity :
300000 Nos. Tyres & 300000 Nos. Tubes
Plant and Machinery cost:
158.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
53.00 %
TCI :
351.00 Lakhs
Cost of Project :
351.00Lakhs
Add To Inquiry Basket
INTEGRATED PRODUCTION UNIT OF GYPSUM POWDER, GYPSUM BOARD AND PVC LAMINATED GYPSUM CEILING TILES
INTEGRATED PRODUCTION UNIT OF GYPSUM POWDER, GYPSUM BOARD AND PVC LAMINATED GYPSUM CEILING TILES

INTEGRATED PRODUCTION UNIT OF GYPSUM POWDER, GYPSUM BOARD AND P.V.C. LAMINATED GYPSUM CEILING TILES... Read More

Capacity :
60,000 MT / A (Gypsum Powder), 3000 Thousand Sq. MT/A (Gypsum Board),600 Thousands Sq. MT/A (PVC Lam
Plant and Machinery cost:
840.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
57.00 %
TCI :
2352.00 Lakhs
Cost of Project :
2352.00Lakhs
Add To Inquiry Basket
IRON ORE PELLETIZATION PLANT
IRON ORE PELLETIZATION PLANT

Iron ore pellets are used in blast / electric furnaces for producing sponge iron and steels. Market by high productivity, lower fuel consumption an... Read More

Capacity :
1008000 MT/Annum
Plant and Machinery cost:
13800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
55.00 %
TCI :
22400.00 Lakhs
Cost of Project :
22400.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC CUPS, PLATES AND GLASSES
DISPOSABLE PLASTIC CUPS, PLATES AND GLASSES

The plastic industry in India plays a very important and key role in industrialization. Disposable cups, glasses, plates are used in daily life now... Read More

Capacity :
150 Lakhs Pcs/Annum Cups, 300 Lakhs Pcs/Annum Glass, 150 Lakhs Pcs/Annum Plates
Plant and Machinery cost:
34.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
48.00 %
TCI :
104.00 Lakhs
Cost of Project :
104.00Lakhs
Add To Inquiry Basket
E Waste Recycling plant (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))
E Waste Recycling plant (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))

E-waste is a popular informal name for electronic product nearing the end of their useful life. Computers, televisions, VCR, stereos, copier, and f... Read More

Capacity :
Monitor -10 Pcs/Day, Plastic Dana “ 5.33 M.T/Day,Copper Wire Scrap-9 Kg/day, Glass Scrap from C.R.
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
40.00 %
TCI :
196.00 Lakhs
Cost of Project :
196.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen and nitrogen are the most important industrial gases finding its application in large quantities in metal fabrication and cutting industries... Read More

Capacity :
1200 Cubic Meter/Day
Plant and Machinery cost:
21.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
52.00 %
TCI :
68.00 Lakhs
Cost of Project :
68.00Lakhs
Add To Inquiry Basket
Start Industry of Geogrid
Start Industry of Geogrid

Geogrid is a polymeric or steel-reinforced plastic grid material used to reinforce soils and create a stronger, more durabl... Read More

Capacity :
Geogrid 30,000 Sq.Mtrs Per Day
Plant and Machinery cost:
879.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
1766.00Lakhs
Add To Inquiry Basket
Start Herbicides Production From Artemisia Annua
Start Herbicides Production From Artemisia Annua

 

Artemisia annua, ... Read More

Capacity :
-
Plant and Machinery cost:
40.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
370.00Lakhs
Add To Inquiry Basket
IV Fluid (Intravenous Fluid) Market (Southern and Eastern African Countries)
IV Fluid (Intravenous Fluid) Market (Southern and Eastern African Countries)


Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Integrated Unit of Soya Nugget, Tea Packaging, Jam, Turmeric Grinding and Packaging
Setup Integrated Unit of Soya Nugget, Tea Packaging, Jam, Turmeric Grinding and Packaging

Four businesses that are now seeing great success in the market are soy nuggets, tea ... Read More

Capacity :
-
Plant and Machinery cost:
202.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
380.00Lakhs
Add To Inquiry Basket
Active Pharmaceutical Ingredients API • Metformin • Amoxicillin • Ibuprofen • Paracetamol Manufacturing Business
Active Pharmaceutical Ingredients API • Metformin • Amoxicillin • Ibuprofen • Paracetamol Manufacturing Business

The active ingredients in pharmaceutical medications that have a therapeutic effect o... Read More

Capacity :
-
Plant and Machinery cost:
275.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
963.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Polyacrylamide
Manufacturing Business Of Polyacrylamide

In many industrial and envi... Read More

Capacity :
Polyacrylamide Liquid 50% Solution 200 MT Per Day
Plant and Machinery cost:
2247.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
4304.00Lakhs
Add To Inquiry Basket
Start Production of Zinc Chloride
Start Production of Zinc Chloride

 

An inorganic subs... Read More

Capacity :
Zinc Chloride from Zinc Ash 2,700 MT Per Annum Zinc Chloride from Zinc Oxide 300 MT Per Annum
Plant and Machinery cost:
229.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
751.00Lakhs
Add To Inquiry Basket
Initiating an Integrated Unit of Soya Nugget, Tea Packaging, Turmeric Grinding & Packaging, Jam
Initiating an Integrated Unit of Soya Nugget, Tea Packaging, Turmeric Grinding & Packaging, Jam

A wide range of food processing operations are consolidated under o... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Plant Of Aluminium from Bauxite
Setup Plant Of Aluminium from Bauxite

Aluminium is a lightweight ... Read More

Capacity :
Aluminium Ingot 10 MT Per Day
Plant and Machinery cost:
818.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
2280.00Lakhs
Add To Inquiry Basket
Setup Unit Of Menthol Crystals From Mint Oil
Setup Unit Of Menthol Crystals From Mint Oil

Menthol crystals are a type of organic compound that have a cooling, minty aroma. The... Read More

Capacity :
Menthol Crystals 300,000 Kg. Per Annum Dementholised Oil (DMO) 100,000 Kg. Per Annum
Plant and Machinery cost:
154.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
701.00Lakhs
Add To Inquiry Basket
A Business Plan For Sodium Sulphate (Anhydrous)
A Business Plan For Sodium Sulphate (Anhydrous)

Sodium sulfate, also known as sodium sulphate, is a white crystalline compound with t... Read More

Capacity :
Sodium Sulphate (Anhydrous) 10 MT Per Day HCl 32% 15 MT Per Day
Plant and Machinery cost:
54.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
336.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Copper Flats & Copper Tubes
Start Manufacturing Business Copper Flats & Copper Tubes

Copper flats and copper tub... Read More

Capacity :
Copper Flats or Sections 2,000 MT Per Annum Copper Tubes 1,600 MT Per Annum Copper Scraps 55 MT P
Plant and Machinery cost:
353.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1333.00Lakhs
Add To Inquiry Basket
Set up Dry Yeast For Bakery and Alcohol Industry
Set up Dry Yeast For Bakery and Alcohol Industry

 

Dry yeast is a ty... Read More

Capacity :
Dry Yeast 5,000 Kgs per day
Plant and Machinery cost:
1080.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1703.00Lakhs
Add To Inquiry Basket
Setup Plant Of Pellet Production from waste Fishing Net (Recycling of fisheries plastic wastes)
Setup Plant Of Pellet Production from waste Fishing Net (Recycling of fisheries plastic wastes)

Fishing Net to Pellet refers to the innovative process of rec... Read More

Capacity :
Hdpe/Pvc/Nylon/Hdpe Pellet 2,000 MT Per Annum
Plant and Machinery cost:
114.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
436.00Lakhs
Add To Inquiry Basket
Setup Unit Of Animal Feed From Bagasse
Setup Unit Of Animal Feed From Bagasse

Animal feed from bagasse re... Read More

Capacity :
Animal Feed 100 MT Per Day
Plant and Machinery cost:
125.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1320.00Lakhs
Add To Inquiry Basket
A Business Plan for Bottling of Refined Oil, Refined Sunflower Oil, Refined Corn Oil, RBD Palm Olein Oil, Extra Virgin Olive Oil
A Business Plan for Bottling of Refined Oil, Refined Sunflower Oil, Refined Corn Oil, RBD Palm Olein Oil, Extra Virgin Olive Oil

Bottling of refined oil refers to the process of packaging hi... Read More

Capacity :
-
Plant and Machinery cost:
402.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1975.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Manganese From Manganese Ore
Start Manufacturing Business Manganese From Manganese Ore

Manganese is a chemical ele... Read More

Capacity :
Manganese Ingot 10 MT Per Day
Plant and Machinery cost:
666.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
2192.00Lakhs
Add To Inquiry Basket
Soda Ash Market of Middle East and North Africa (MENA)
Soda Ash Market of Middle East and North Africa (MENA)

Sodium carbonate, often known as soda ash, is a whit... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production Of Calcium Silicate Blocks
Start Production Of Calcium Silicate Blocks

 

Calcium silicate ... Read More

Capacity :
Calcium Silicate Blocks 100 Sq.Mt. Per Day
Plant and Machinery cost:
82.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
408.00Lakhs
Add To Inquiry Basket
An Investment Opportunity in Lithium Ion Battery (LiFePO4) Manufacturing Plant
An Investment Opportunity in Lithium Ion Battery (LiFePO4) Manufacturing Plant

A lithium iron phosphate (L... Read More

Capacity :
Lithium Ion (LiFePO4) Battery Back of Power 4.8 KWH (No. of Cells 800) for Three Wheeler:26 Nos. Per
Plant and Machinery cost:
300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
1028.00Lakhs
Add To Inquiry Basket
Solar Panel Manufacturing Business (both type of the PV Cells: Polycrystalline and Monocrystalline)
Solar Panel Manufacturing Business (both type of the PV Cells: Polycrystalline and Monocrystalline)

A Solar panel consists of a number of solar modules, which are connected in series an... Read More

Capacity :
Mono Crystalline Solar PV Module Capacity: 250 Watt 466.8 Nos. Per Day Mono Crystalline Solar PV Mod
Plant and Machinery cost:
3635.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
6346.00Lakhs
Add To Inquiry Basket
A Complete Business Plan of Solar Panel Including both type of the PV Cells Polycrystalline and Monocrystalline
A Complete Business Plan of Solar Panel Including both type of the PV Cells Polycrystalline and Monocrystalline

Introduction... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for FREEZE DRIED FRUIT and VEGETABLES Dry Banana Mango Custard Apple Beetroot Sapota Dragon Fruit Jamun and Green Peas
A Business Plan for FREEZE DRIED FRUIT and VEGETABLES Dry Banana Mango Custard Apple Beetroot Sapota Dragon Fruit Jamun and Green Peas

In the sublimation process of freeze-drying, sometimes referr... Read More

Capacity :
0
Plant and Machinery cost:
95.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
200.00Lakhs
Add To Inquiry Basket
Set Up Milk Processing Automatic Plant (Milk and Milk Powder)
Set Up Milk Processing Automatic Plant (Milk and Milk Powder)

A dairy product made from cow milk is powdered milk. Essentially, cow's milk is composed of water, lipids, protein, su... Read More

Capacity :
Pasteurised Milk 10,000 Units per Day Skimmed Milk Powder 10,000 Units per Day Raw Cream by Product
Plant and Machinery cost:
4900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
37.00 %
TCI :
0.00 Lakhs
Cost of Project :
6300.00Lakhs
Add To Inquiry Basket
Setting Up Medical College  With Hospital
Setting Up Medical College With Hospital

A hospital is an institution that provides preventive, curative/ameliorative, palliative, or rehabilitative services i... Read More

Capacity :
100 Students, 500 bedded Hospital
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
12300.00Lakhs
Add To Inquiry Basket
Start Ferrosilicon Production Business
Start Ferrosilicon Production Business

Basically, ferrosilicon is a silica and iron alloy that comprises somewhere between 15% and 90% silicon. A "heat-blocker" c... Read More

Capacity :
26.7 MT per day
Plant and Machinery cost:
1900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
3900.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate

 

L-Glutamic acid a... Read More

Capacity :
L-Glutamic Acid 50 MT Per Day Monosodium Glutamate 15 MT Per Day
Plant and Machinery cost:
867.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
2590.00Lakhs
Add To Inquiry Basket
Business Plan For Sanitary Napkins
Business Plan For Sanitary Napkins

Feminine napkins, generally called sanitary napkins or menstruation pads, are absorbe... Read More

Capacity :
Sanitary Napkins 1,440,000 Pkts Per Annum
Plant and Machinery cost:
26.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
84.00Lakhs
Add To Inquiry Basket
Start Production of Expandable & High Purity Graphite
Start Production of Expandable & High Purity Graphite

Expandable Graphite refers to a form of graphite that has bee... Read More

Capacity :
Expandable Graphite 10 MT Per Day High Purity Graphite 10 MT Per Day
Plant and Machinery cost:
206.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1598.00Lakhs
Add To Inquiry Basket
Start  Waste Lubricating Oil Recycling Plant
Start Waste Lubricating Oil Recycling Plant

Waste Lubricating Oil Recyc... Read More

Capacity :
Recycled Lubricating Oil 18,000 KLs per Annum Spent Clay as by product 1,890 KLs per Annum
Plant and Machinery cost:
355.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
32.00 %
TCI :
0.00 Lakhs
Cost of Project :
3101.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Carbon Composite Bicycle
Start Manufacturing Of Carbon Composite Bicycle

Carbon composite bicycles a... Read More

Capacity :
Carbon Composite Bicycle 12 Nos per Day
Plant and Machinery cost:
413.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
594.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Latex Toy Balloons
Start Manufacturing Of Latex Toy Balloons

Latex toy balloons are flexible, inflatable objects made prim... Read More

Capacity :
Latex Toy Balloons 20,000 PKTS per Day
Plant and Machinery cost:
373.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
883.00Lakhs
Add To Inquiry Basket
Setup Plant Of Craft Beer
Setup Plant Of Craft Beer

 

Craft beer is a t... Read More

Capacity :
-
Plant and Machinery cost:
1519.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
4060.00Lakhs
Add To Inquiry Basket
Start Production Of Ammonium Nitrate
Start Production Of Ammonium Nitrate

 

Are you an entrepreneur looking for... Read More

Capacity :
Ammonium Nitrate 2 MT per Day
Plant and Machinery cost:
53.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
215.00Lakhs
Add To Inquiry Basket
Start Silicon Wafers Business From Electronic Grade Silicon Ingots (Using Metallurgical Grade Silicon)
Start Silicon Wafers Business From Electronic Grade Silicon Ingots (Using Metallurgical Grade Silicon)

 

Silicon wafers are crucial componen... Read More

Capacity :
Silicon Wafers 20 MT Per Day
Plant and Machinery cost:
2505.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
4235.00Lakhs
Add To Inquiry Basket
A Business Plan For Recycling of Lithium Ion Battery
A Business Plan For Recycling of Lithium Ion Battery

Recycling of lithium-ion batteries refers to the process of recovering valuable mater... Read More

Capacity :
-
Plant and Machinery cost:
189.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
468.00Lakhs
Add To Inquiry Basket
Setup Plant of Extraction from Tobacco Waste
Setup Plant of Extraction from Tobacco Waste

Nicotine is a chemical compound that is naturally present in the leaves of the tobacco plant. It is a powerful sti... Read More

Capacity :
-
Plant and Machinery cost:
289.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
32.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Ferro Alloys (Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), Ferro Titanium (FeTi))
A Business Plan for Ferro Alloys (Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), Ferro Titanium (FeTi))

Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), and Fer... Read More

Capacity :
-
Plant and Machinery cost:
1783.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
71.00 %
TCI :
0.00 Lakhs
Cost of Project :
9775.00Lakhs
Add To Inquiry Basket
Setup Egg Powder Industry
Setup Egg Powder Industry

Egg powder is essentially a... Read More

Capacity :
Egg Powder 2,400 Kgs Per Day
Plant and Machinery cost:
489.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
930.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business of Laundry Soap Bars
Start Manufacturing Business of Laundry Soap Bars

 

Laundry soap bars... Read More

Capacity :
Laundry Soap 1,000 Kgs Per Day (1 Kgs Pack 10 Pcs. each 100gms Size)
Plant and Machinery cost:
27.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
72.00 %
TCI :
0.00 Lakhs
Cost of Project :
65.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
How to Start Production o... 0 0.00 0.00
Lithium Ion Battery Pack ... 0 0.00 0.00
How to setup Plastic Wast... - 28.00 401.00
Business Plan for Setting... - 30.00 2500.00
Lucrative Badminton Racke... 0 0.00 0.00
Set Up Epoxy Hardener Pla... Polyamide Hardener: 6 MT per Day Cycloaliphatic Amine Hardener:1.2 MT per Day 28.00 1300.00
ZINC INGOTS Manufacturing... 6 MT per Day 28.00 52500000.00
Medium Density Fiberboard... 100 CBM per Day 25.00 3100.00
Business Plan for Product... 0 31.00 1800.00
Best Plan of Tennis Racke... 0 0.00 0.00
A Business Plan for Silic... 0 23.00 1288.00
Manufacturing Business Of... 0 34.00 324.00
Red Chilli Oleoresin Manu... Chilli Oleoresin 6,250 Kg Per Day 25.00 3250.00
Start a Business of Low R... Low Relaxation Pre-stressed Concrete 83.3 MT Per Day Steel Strand (LRPC) 25.00 5370.00
Moringa Leaf Powder Produ... Moringa Leaf Powder 1,000 Kg Per Day 29.00 189.00
Manufacturing Business Al... Aluminium Cans & Easy Open End (EOE) 40 Lakh Pcs. Per Day 26.00 72100.00
Production Business Of Me... MDPE Pipes 5,400 Kgs per day 27.00 376.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Manufacturing Business of... 0 0.00 0.00
Plant of Red Chili Oleore... 0 0.00 0.00
The Fuel of the Future Co... 0 0.00 0.00
Copper Powder Using Elec... 1,20,000 Kgs Per Annum 27.00 338.00
ISO Freight Containers 15,000 Nos. Per Annum 15,000 Nos. Per Annum 12.00 9658.00
Manufacturing Business of... 5,000 MT Per Annum 28.00 1287.00
Start a Business Of Ethyl... 30,000 MT Per Annum 28.00 7206.00
Manufacturing Plant of Co... 0 0.00 0.00
Business Plan for Lithium... 48 Volt, 60 AH Lithium-Ion Battery Pack : 5 Nos / Day 48 Volt, 80 AH Lithium-Ion Battery Pack : 5 No 28.00 648.00
Lucrative Business of Lit... 0 0.00 0.00
Investment opportunity in... 25000 Nos/day 25.00 4626.00
Business opportunities in... Packaged Drinking Water 200 ml Size Bottle: 28,800 Bottles per Day Packaged Drinking Water 500 ml Si 24.00 632.00
12345678910...

Showing 61 - 120 of 651 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR