Industrial gas is a group of gases that are commercially manufactured and sold for uses in other applications. The most common industrial gases are:air gases - oxygen (O2), nitrogen (N2) and argon (Ar) rare gases - such as helium (He), krypton (Kr), xenon (Xe) and neon (Ne) and other gases like hydrogen (H2), carbon monoxide (CO), carbon dioxide (CO2) and nitrous oxide (N2O) ,chlorine (Cl2), hydrogen chloride (HCl) and sulphur dioxide (SO2) ,acetylene (C2H2), methane (CH4) and propane (C3H8).

In addition, there are many different mixtures of these and other gases to meet the needs of specific applications. The industrial and medical gases industry serves a very large number of customers in the whole community. Industrial gases are essential for almost all manufacturing. Large quantities of oxygen, nitrogen and argon are used in the steel and metal industry. Shipyards and the automotive industry use acetylene, propane, mixtures of fuel gases and oxygen for cutting and welding. Liquid nitrogen is vital in recycling plastics, packaging and scrap tyres. The chemical industry employs all major industrial gases as a raw material or for inerting. The other smaller market segment consists of cylinder gas and mixtures.

According to the Freedonia group, inc., a Cleveland-based industry research firm, world demand for industrial gases is forecast to increase 6.9% annually to $36.8 billion in 2011, with volume exceeding 300-bcm (billion cubic meters). Asia/pacific is the largest consuming region because of rapid growth in developing industrial markets, especially those of china and India.

Coming back to India, there are presently over 300 small & medium size plants and approximately 25 large tonnage plants all over the country. These gases are supplied through pipelines to captive customers in adjacent factories; in cryogenic transport tanks for bulk deliveries to long distance customers; or filled in cylinders.

The present annual turnover of the gas industry, excluding captive production is about Rs. 3,000 crores ($650 million). With increased industrialization, the demand pattern of industrial gases is also changing fast. Modern application in the food processing industry, agro industries, healthcare and technology are growing at a tremendous pace. This has driven the industry to adopt stringent quality control systems and an efficient distribution network.

Major players in India include BOC India, INOX Air Products Ltd., Jindal Praxair Oxygen Co. Ltd., Air Liquide India Holding P.Ltd., Aims Industries Ltd etc.

The Indian gas industry is growing at an average rate of 12 per cent per annum during the last couple of years, with the industrial oxygen growing consistently at 15-17 per cent per annum. The growth of industrial gas industry can be easily forecast on the basis of projections of the steel and other metallurgical industry. Steel demand is seen rising by 10% in the fiscal year to march 2011, helped by higher spending on infrastructure will continue to drive growth of the gas industry. Natural gas comprises 9 % of India's primary energy consumption and it will be 14% of energy mix by 2010. Demand for natural gas is also likely to increase at an average annual growth rate of 7.3%.Metals production and fabrication will continue to be the largest market for industrial gases, accounting for 31% of total demand in value terms in coming years. The second largest market will be the chemical processing/petroleum refining segment. The medical/healthcare market, though smaller in size, will be the fastest growing and record gains from the expansion of healthcare services in developing nations and rapidly increasing use of home healthcare respiratory therapies in advanced economics. Hydrogen is gaining prominence and most companies are striving to develop technologies that can efficiently exploit the potential of hydrogen. Increased use of natural gas will create an opportunity for higher production of argon and carbon dioxide. The Industrial gas industry has a very bright future in the coming years.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Industrial and Pharmaceutical Grade Oxygen (500 Industrial Gas Cylinders and 500 medicated gas cylinders)
Industrial and Pharmaceutical Grade Oxygen (500 Industrial Gas Cylinders and 500 medicated gas cylinders)

This substance, which occupies 21 percent of the earth’s atmosphere, has a number of very important uses. Oxygen is a colourless... Read More

Capacity : 300000 Cylinders/Annum
Plant and Machinery cost: 675.00 Lakhs
Working Capital : 100.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):54.00 %
TCI :1006.00 Lakhs
Cost of Project : 1006.00Lakhs
Add To Inquiry Basket
PSA Oxygen Plant
PSA Oxygen Plant

 

PSA p... Read More

Capacity : 30 to 36 cylinders per day
Plant and Machinery cost: 45.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Hydrogen Peroxide
Hydrogen Peroxide

Hydrogen peroxide (H2O2) is a very pale blue liquid which appears colorless in a dilute soluti... Read More

Capacity : 12,000 MT per annum
Plant and Machinery cost: 3932.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):34.00 %
TCI :0.00 Lakhs
Cost of Project : 5737.00Lakhs
Add To Inquiry Basket
Production of Industrial Gases and Speciality Gases Mixture
Production of Industrial Gases and Speciality Gases Mixture

Production of Industrial Gases and Speciality Gases Mixture. Investment & Busines... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Hydrogen Gas from Methanol Cracking
Hydrogen Gas from Methanol Cracking
Hydrogen gas was first artificially produced in the early 16th century, via the mixing of metals with strong acids. In 1766-81, Henry Cavendish was th... Read More
Capacity : 120000 Nos. Cylinder/Annum 6m3, 80000 Nos. Cylinder/Annum 9m3
Plant and Machinery cost: 707.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):44.00 %
TCI :1202.00 Lakhs
Cost of Project : 1202.00Lakhs
Add To Inquiry Basket
COMPRESSED BIOGAS
COMPRESSED BIOGAS

The term biogases refer to gases created by the anaerobic fermentation of biological materials. Their main constituents are methane and carbon diox... Read More

Capacity : 1200 MT/Annum
Plant and Machinery cost: 204.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):33.00 %
TCI :447.00 Lakhs
Cost of Project : 447.00Lakhs
Add To Inquiry Basket
ACETYLENE GAS
ACETYLENE GAS

Acetylene is a colourless inflammable gas. It is an endothermic compound. It is an endothermic compound. Its heat of formation being nearly 50 Kg. ... Read More

Capacity : 240 Cubic Meter/day
Plant and Machinery cost: 44.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.00%
Break Even Point (BEP):44.00 %
TCI :163.00 Lakhs
Cost of Project : 163.00Lakhs
Add To Inquiry Basket
GAS FILLING OF LPG CYLINDER
GAS FILLING OF LPG CYLINDER

GAS FILLING OF L.P.G. CYLINDER

Bulk petroleum and hydrocarbons generally are most c... Read More

Capacity : 10000 /day
Plant and Machinery cost: 100.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):54.00%
Break Even Point (BEP):21.00 %
TCI :2700.00 Lakhs
Cost of Project : 2700.00Lakhs
Add To Inquiry Basket
Oxygen Gas Plant
Oxygen Gas Plant

Oxygen as a raw material for synthesizing chemical compounds is in daily life. ... Read More

Capacity : 172 Cylinders Per Day (each Cylinder 7M3)
Plant and Machinery cost: 178.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):39.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 582.00Lakhs
Add To Inquiry Basket
Business of Oxygen Gas Plant (Industrial and Pharmaceutical Grade)
Business of Oxygen Gas Plant (Industrial and Pharmaceutical Grade)

 

Oxygen (CO2<... Read More

Capacity : Oxygen Gas (Medical Grade) Purity 99.5-99.9%: 500 Cylinders per Day Oxygen Gas (Indudrial Grade) Pur
Plant and Machinery cost: 418.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):57.69%
Break Even Point (BEP):26.80 %
TCI :0.00 Lakhs
Cost of Project : 748.00Lakhs
Add To Inquiry Basket
Profitable Business of Industrial and Pharmaceutical Gases Start Oxygen Gas Plant Industrial and Pharmaceutical Grade
Profitable Business of Industrial and Pharmaceutical Gases Start Oxygen Gas Plant Industrial and Pharmaceutical Grade

Industrial gases are employ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Refrigerant Gas R22 Bottling Plant
Refrigerant Gas R22 Bottling Plant

A refrigerant is a substance or mixture, usually a fluid, used in a heat pump and refrigeration cycle. In most c... Read More

Capacity : Refrigerant Gas R22 (Cylinder 10 Kgs Size) : 166 Nos / day
Plant and Machinery cost: 24.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 179.00Lakhs
Add To Inquiry Basket
Refrigerant Gas R22 Bottling Plant
Refrigerant Gas R22 Bottling Plant

Refrigerant Gas R22 Bottling Plant. Best Investment Opportunities in Industrial Gases. <... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production of Fiberglass Transparent LPG Cylinders
Production of Fiberglass Transparent LPG Cylinders

A gas cylinder may be a pressure vessel for storage and containment of gases at above air pressure. High-pressur... Read More

Capacity : Transparent LPG Cylinder: 2,243.6 Nos. / Day
Plant and Machinery cost: 28274.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):27.00 %
TCI :0.00 Lakhs
Cost of Project : 32012.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen (CO2,gas at O0/1 matm. 1.429 g./l, crit. pressure, 49.7 matm.) is a colorless, odourless, an... Read More

Capacity : Oxygen Gas: 667,800 Cu.mtrs per annum Nitrogen Gas: 2,480,400 Cu.mtrs per annum
Plant and Machinery cost: 306.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 643.00Lakhs
Add To Inquiry Basket
Butene-1 Manufacturing Industry
Butene-1 Manufacturing Industry

Butene-1 Manufacturing Industry. Industrial Production of 1-Butene

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Industrial Gases and  Speciality Gases Mixture
Industrial Gases and Speciality Gases Mixture

Industrial gas is a group of materials that are specifically manufactured for use in industry and are also gaseous at ambient temperature and press... Read More

Capacity : Oxygen Gas (7M3 each Cylinder) : 300 Nos/Day Nitrogen Gas (7M3 each Cylinder) : 100 Nos/Day
Plant and Machinery cost: 177.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 307.00Lakhs
Add To Inquiry Basket
LPG Cylinder Refilling Plant
LPG Cylinder Refilling Plant

Liquefied Petroleum Gas is a Propane / Butane mixture liquefied under normal ambient temperature and moderate pressures. It is a safe, clean burnin... Read More

Capacity : 16000 Pcs./Day
Plant and Machinery cost: 1391.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):31.00 %
TCI :0.00 Lakhs
Cost of Project : 11166.00Lakhs
Add To Inquiry Basket
High Pure Dissolved Acetylene Gas
High Pure Dissolved Acetylene Gas

Acetylene (C2H2) is known as one of the simplest and most significant chemical in the acetylene series. A compound of carbon and hydrogen, acetylen... Read More

Capacity : Acetylene Gas : 360 M3/ Day
Plant and Machinery cost: 68.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):52.00 %
TCI :260.00 Lakhs
Cost of Project : 260.00Lakhs
Add To Inquiry Basket
Heptafluoropropane
Heptafluoropropane

1,1,1,2,3,3,3-Heptafluoropropane, also called heptafluoropropane, HFC-227 or HFC-227ea (ISO name), is a colourless, odourless gaseous halocarbon co... Read More

Capacity : 2 MT/Day
Plant and Machinery cost: 116.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):59.00 %
TCI :1108.00 Lakhs
Cost of Project : 1108.00Lakhs
Add To Inquiry Basket
Oxygen Plant
Oxygen Plant
The great importance of the industrial gas, oxygen is due to the usefulness of the acetylene torch for steel welding and steel cutting, and for the we... Read More
Capacity : 1080000 Cu. m/annum
Plant and Machinery cost: 110.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):23.25%
Break Even Point (BEP):55.03 %
TCI :304.00 Lakhs
Cost of Project : 304.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen (CO2, gas at 00/1 matm., 1.429g./l, crit. Pressure, 49.7 Matm.) is a colorless, odourless, and tasteless gas, somewhat heavier than air. It ... Read More

Capacity : 1440 Cubie Meter/Day
Plant and Machinery cost: 50.00 Lakhs
Working Capital : 18.00
Rate of Return (ROR):18.19%
Break Even Point (BEP):75.00 %
TCI :101.00 Lakhs
Cost of Project : 101.00Lakhs
Add To Inquiry Basket
Pressure Swing Adsorption Oxygen Plant
Pressure Swing Adsorption Oxygen Plant

PSA plants takes free air form atmosphere and con... Read More

Capacity : 90 to 100 cylinders per day
Plant and Machinery cost: 65.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
PSA Based Oxygen Plants
PSA Based Oxygen Plants

PSA plants take... Read More

Capacity : 240 to 270 cylinders per day
Plant and Machinery cost: 120.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
How to Set Up an Oxygen and Nitrogen Gas Plant (Medical and Industrial Grade)
How to Set Up an Oxygen and Nitrogen Gas Plant (Medical and Industrial Grade)

 

Limelight used oxygen extracted from the barium oxide Brin process, for example. This method in... Read More

Capacity : 3200 cumtrs/Day
Plant and Machinery cost: 183.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 675.00Lakhs
Add To Inquiry Basket
Business of Industrial Gases, Start Manufacturing of Oxygen and Nitrogen Gas Plant Increasing Demand of Industrial Gases Due to Covid-19
Business of Industrial Gases, Start Manufacturing of Oxygen and Nitrogen Gas Plant Increasing Demand of Industrial Gases Due to Covid-19

 

Introducti... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Industrial Gases
Industrial Gases

Industrial gases are gaseous materials that are manufactured for use in Industry. The principal gases provided are nit... Read More

Capacity : Oxygen Gas (7M3 each Cylinder):350 Nos per day Nitrogen Gas (7M3 each Cylinder):100 Nos per day
Plant and Machinery cost: 147.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 466.00Lakhs
Add To Inquiry Basket
LPG Stove Manufacturing
LPG Stove Manufacturing

LPG stoves are very convenient for users as they heat up quickly and temperature can be precisely controlled. However,... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Medical Oxygen Gas Plant, Oxygen Bottling Plant
Medical Oxygen Gas Plant, Oxygen Bottling Plant

Medical Oxygen Gas Plant. Oxygen Bottling Plant. Oxygen Cylinder Filling Plant. Industrial Oxygen Gas Filling Plan... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Oxygen Gas Plant (Industrial and Medical Use)
Oxygen Gas Plant (Industrial and Medical Use)

This substance, which occupies 21 percent of the earth’s atmosphere, has a number of very important uses. Oxygen is a colou... Read More

Capacity : 300000 Cylinders/Annum
Plant and Machinery cost: 675.00 Lakhs
Working Capital : 100.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 1006.00Lakhs
Add To Inquiry Basket
High Pure Dissolved Acetylene Gas
High Pure Dissolved Acetylene Gas

Acetylene (C2H2) is known as one of the simplest and most significant chemical in the acetylene series. A compound of carbon and hydrogen, acetylen... Read More

Capacity : 360 M3/Day
Plant and Machinery cost: 67.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):52.00 %
TCI :260.00 Lakhs
Cost of Project : 260.00Lakhs
Add To Inquiry Basket
Oxygen Plant
Oxygen Plant
The great importance of the industrial gas, oxygen is due to the usefulness of the acetylene torch for steel welding and steel cutting, and for the we... Read More
Capacity : 1080000 Cu. m/annum
Plant and Machinery cost: 110.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):23.00%
Break Even Point (BEP):55.00 %
TCI :304.00 Lakhs
Cost of Project : 304.00Lakhs
Add To Inquiry Basket
Oxygen Gas Lancing Pipes, Ceramic Coated Pipes, Oxygen Lancing Tube Used in Steel Plants, Furnace and Foundries
Oxygen Gas Lancing Pipes, Ceramic Coated Pipes, Oxygen Lancing Tube Used in Steel Plants, Furnace and Foundries

Manufacturing of steel tubes & pipes a Mechanical Engineering is mostly produced in large scale. ERW steel tubes are chiefly used in bicycles, ... Read More

Capacity : 3600 MT / Annum
Plant and Machinery cost: 115.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):57.00 %
TCI :234.00 Lakhs
Cost of Project : 234.00Lakhs
Add To Inquiry Basket
Start production of Compressed Bio Gas Using Napier Grass
Start production of Compressed Bio Gas Using Napier Grass

Compressed Bio Gas represents a pivotal advancement in the quest for renewable energy solutions, with Napier Grass eme... Read More

Capacity : -
Plant and Machinery cost: 1100.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 2800.00Lakhs
Add To Inquiry Basket
Setup Plant of Freon Gases for Refrigeration
Setup Plant of Freon Gases for Refrigeration

 

Freon gases, ofte... Read More

Capacity : -
Plant and Machinery cost: 1064.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 3229.00Lakhs
Add To Inquiry Basket
The Fuel of the Future Compressed Bio Gas CBG Bio CNG plant Save Money and Help save Our Planet with This Eco-Friendly Fuel
The Fuel of the Future Compressed Bio Gas CBG Bio CNG plant Save Money and Help save Our Planet with This Eco-Friendly Fuel

Energy production using Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setup an Lucrative Industry of Oxygen Gas Plant
Setup an Lucrative Industry of Oxygen Gas Plant

 

Medical oxygen is... Read More

Capacity : 172 Cylinders per Day
Plant and Machinery cost: 178.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):63.51%
Break Even Point (BEP):14.46 %
TCI :0.00 Lakhs
Cost of Project : 416.00Lakhs
Add To Inquiry Basket
Start Lucrative Business of Oxygen Gas Plant Rising Demand of Medical Oxygen in World Due to Covid 19
Start Lucrative Business of Oxygen Gas Plant Rising Demand of Medical Oxygen in World Due to Covid 19

 

At room temperatu... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
How to Start Oxygen Gas Business for Medical Grade
How to Start Oxygen Gas Business for Medical Grade

Oxygen gas comprises 21 percent of atmospheric gas. Its symbol is O2. Atomic weight of oxygen is 16, atomic no. is 8 and relative mo... Read More

Capacity : Medical Grade Oxygen Gas 28.5 Kgs : 180 Cylinders / Day
Plant and Machinery cost: 284.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):23.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 596.00Lakhs
Add To Inquiry Basket
Downhole Seals  used for Oil and Gas Industry from Synthetic Rubber
Downhole Seals used for Oil and Gas Industry from Synthetic Rubber

Downhole tools helps in minimizing the cost involved in performing oil recovery related activities from an oil well an... Read More

Capacity : Downhole Seals (1-1/4" Swab Cup (100g each): 24,000 Pcs. / day
Plant and Machinery cost: 70.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 506.00Lakhs
Add To Inquiry Basket
Nitrous Oxide Production
Nitrous Oxide Production

Nitrous Oxide Production. Laughing Gas Manufacturing Business. Opportunities in Industrial an... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
LPG Cylinder Refilling Plant
LPG Cylinder Refilling Plant

LPG cylinder filling plants vary considerably in size, complexity and layout. The type and size depends on such factor... Read More

Capacity : LPG Cylinders (14.2 Kgs Size) : 1000 Cylinders/Day LPG Cylinders (19 Kgs Size) : 1000 Cylinders/Day
Plant and Machinery cost: 110.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 427.00Lakhs
Add To Inquiry Basket
LPG Bottling Plant
LPG Bottling Plant

Liquefied Petroleum Gas is a Propane/Butane mixture liquefied under normal ambient temperature and moderate pressures. It is a safe, clean burning,... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
ACETYLENE GAS PLANT
ACETYLENE GAS PLANT

Acetylene is an endothermic compound, its heat of formation being nearly 50kg.-cal. g. mol. Both the gas (tc, 37°; Pc, 62 atm.) and the ... Read More

Capacity : 400 Cubic Metre/Day
Plant and Machinery cost: 56.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):40.00 %
TCI :344.00 Lakhs
Cost of Project : 344.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen and nitrogen are the most important industrial gases finding its application in large quantities in metal fabrication and cutting industries... Read More

Capacity : 1200 Cubic Meter/Day
Plant and Machinery cost: 21.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.00%
Break Even Point (BEP):52.00 %
TCI :68.00 Lakhs
Cost of Project : 68.00Lakhs
Add To Inquiry Basket
OXYGEN GAS PLANT
OXYGEN GAS PLANT

Oxygen as a raw material for synthesizing chemical compounds is in daily life. Liquid oxygen mixed with carbon black may yet become an important an... Read More

Capacity : 1140 Cubic Meter/day.
Plant and Machinery cost: 60.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):35.00%
Break Even Point (BEP):55.00 %
TCI :130.00 Lakhs
Cost of Project : 130.00Lakhs
Add To Inquiry Basket
BIOGAS PRODUCTION
BIOGAS PRODUCTION

An effective biogas programme leads to efficient use of cow dung for gas recovery and partial supplement to plant nutrient requirement. Biogas prog... Read More

Capacity : 450 KGS/day
Plant and Machinery cost: 6.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.00%
Break Even Point (BEP):35.00 %
TCI :29.00 Lakhs
Cost of Project : 29.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Industrial and Pharmaceut... 300000 Cylinders/Annum 30.00 1006.00
PSA Oxygen Plant 30 to 36 cylinders per day 0.00 0.00
Hydrogen Peroxide 12,000 MT per annum 25.00 5737.00
Production of Industrial ... 0 0.00 0.00
Hydrogen Gas from Methano... 120000 Nos. Cylinder/Annum 6m3, 80000 Nos. Cylinder/Annum 9m3 45.00 1202.00
COMPRESSED BIOGAS 1200 MT/Annum 43.00 447.00
ACETYLENE GAS 240 Cubic Meter/day 40.00 163.00
GAS FILLING OF LPG CYLIND... 10000 /day 54.00 2700.00
Oxygen Gas Plant 172 Cylinders Per Day (each Cylinder 7M3) 39.00 582.00
Business of Oxygen Gas Pl... Oxygen Gas (Medical Grade) Purity 99.5-99.9%: 500 Cylinders per Day Oxygen Gas (Indudrial Grade) Pur 57.69 748.00
Profitable Business of In... 0 0.00 0.00
Refrigerant Gas R22 Bottl... Refrigerant Gas R22 (Cylinder 10 Kgs Size) : 166 Nos / day 27.00 179.00
Refrigerant Gas R22 Bottl... 0 0.00 0.00
Production of Fiberglass ... Transparent LPG Cylinder: 2,243.6 Nos. / Day 25.00 32012.00
Oxygen and Nitrogen Gas P... Oxygen Gas: 667,800 Cu.mtrs per annum Nitrogen Gas: 2,480,400 Cu.mtrs per annum 26.00 643.00
Butene-1 Manufacturing In... 0 0.00 0.00
Industrial Gases and Spe... Oxygen Gas (7M3 each Cylinder) : 300 Nos/Day Nitrogen Gas (7M3 each Cylinder) : 100 Nos/Day 25.00 307.00
LPG Cylinder Refilling Pl... 16000 Pcs./Day 30.00 11166.00
High Pure Dissolved Acety... Acetylene Gas : 360 M3/ Day 25.00 260.00
Heptafluoropropane 2 MT/Day 26.00 1108.00
Oxygen Plant 1080000 Cu. m/annum 23.25 304.00
Oxygen and Nitrogen Gas P... 1440 Cubie Meter/Day 18.19 101.00
Pressure Swing Adsorption... 90 to 100 cylinders per day 0.00 0.00
PSA Based Oxygen Plants 240 to 270 cylinders per day 0.00 0.00
How to Set Up an Oxygen a... 3200 cumtrs/Day 26.00 675.00
Business of Industrial Ga... 0 0.00 0.00
Industrial Gases Oxygen Gas (7M3 each Cylinder):350 Nos per day Nitrogen Gas (7M3 each Cylinder):100 Nos per day 27.00 466.00
LPG Stove Manufacturing 0 0.00 0.00
Medical Oxygen Gas Plant,... 0 0.00 0.00
Oxygen Gas Plant (Industr... 300000 Cylinders/Annum 30.00 1006.00
12

Showing 47 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

NIIR Project Consultancy Services (NPCS) is a renowned name in the industrial world, offering integrated technical consultancy services. Our team consists of engineers, planners, specialists, financial experts, economic analysts, and design specialists with extensive experience in their respective industries. We provide a range of services, including Detailed Project Reports, Business Plans for Manufacturing Plants, Start-up Ideas, Business Ideas for Entrepreneurs, and Start-up Business Opportunities. Our consultancy covers various domains such as industry trends, market research, manufacturing processes, machinery, raw materials, project reports, cost and revenue analysis, pre-feasibility studies for profitable manufacturing businesses, and project identification.

Our Services

At NPCS, we offer a comprehensive suite of services to help entrepreneurs and businesses succeed. Our key services include:

  • Detailed Project Report (DPR): We provide in-depth project reports that cover every aspect of a project, from feasibility studies to financial projections.
  • Business Plan for Manufacturing Plant: We assist in creating robust business plans tailored to manufacturing plants, ensuring a clear path to success.
  • Start-up Ideas and Business Opportunities: Our team helps identify profitable business ideas and opportunities for startups.
  • Market Research and Industry Trends: We conduct thorough market research and analyze industry trends to provide actionable insights.
  • Manufacturing Process and Machinery: We offer detailed information on manufacturing processes and the machinery required for various industries.
  • Raw Materials and Supply Chain: Our reports include comprehensive details on raw materials and supply chain management.
  • Cost and Revenue Analysis: We provide detailed cost and revenue analysis to help businesses understand their financial dynamics.
  • Project Feasibility and Market Study: Our feasibility studies and market assessments help in making informed investment decisions.
  • Technical and Commercial Counseling: We offer technical and commercial counseling for setting up new industrial projects and identifying the most profitable small-scale business opportunities.

Publications

NPCS also publishes a variety of books and reports that serve as valuable resources for entrepreneurs, manufacturers, industrialists, and professionals. Our publications include:

  • Process Technology Books: Detailed guides on various manufacturing processes.
  • Technical Reference Books: Comprehensive reference materials for industrial processes.
  • Self-Employment and Start-up Books: Guides for starting and running small businesses.
  • Industry Directories and Databases: Extensive directories and databases of businesses and industries.
  • Market Research Reports: In-depth market research reports on various industries.
  • Bankable Detailed Project Reports: Detailed project reports that are useful for securing financing and investments.

Our Approach

Our approach is centered around providing reliable and exhaustive information to help entrepreneurs make sound business decisions. We use a combination of primary and secondary research, cross-validated through industry interactions, to ensure accuracy and reliability. Our reports are designed to cover all critical aspects, including:

  • Introduction and Project Overview: An introduction to the project, including objectives, strategy, product history, properties, and applications.
  • Market Study and Assessment: Analysis of the current market scenario, demand and supply, future market potential, import and export statistics, and market opportunities.
  • Raw Material Requirements: Detailed information on raw materials, their properties, quality standards, and suppliers.
  • Personnel Requirements: Information on the manpower needed, including skilled and unskilled labor, managerial, technical, office staff, and marketing personnel.
  • Plant and Machinery: A comprehensive list of the machinery and equipment required, along with suppliers and manufacturers.
  • Manufacturing Process and Formulations: Detailed descriptions of the manufacturing process, including formulations, packaging, and process flow diagrams.
  • Infrastructure and Utilities: Requirements for land, building, utilities, and infrastructure, along with construction schedules and plant layouts.

Financial Details and Analysis

Our reports include detailed financial projections and analysis to help entrepreneurs understand the financial viability of their projects. Key financial details covered in our reports include:

  • Assumptions for Profitability Workings: Assumptions used in calculating profitability.
  • Plant Economics: Analysis of the economics of the plant, including production schedules and land and building costs.
  • Production Schedule: Detailed production schedules and timelines.
  • Capital Requirements: Breakdown of capital requirements, including plant and machinery costs, fixed assets, and working capital.
  • Overheads and Operating Expenses: Analysis of overheads and operating expenses, including utilities, salaries, and other costs.
  • Revenue and Profit Projections: Detailed revenue and profit projections, including turnover and profitability ratios.
  • Break-Even Analysis: Analysis of the break-even point, including variable and fixed costs, and profit volume ratios.

Reasons to Choose NPCS

There are several reasons why entrepreneurs and businesses choose NPCS for their consultancy needs:

  • Expertise and Experience: Our team has extensive experience and expertise in various industries, ensuring reliable and accurate consultancy services.
  • Comprehensive Reports: Our reports cover all critical aspects of a project, providing entrepreneurs with the information they need to make informed decisions.
  • Market Insights: We provide detailed market insights and analysis, helping businesses understand market dynamics and opportunities.
  • Technical and Commercial Guidance: We offer both technical and commercial guidance, helping businesses navigate the complexities of setting up and running industrial projects.
  • Tailored Solutions: Our services are tailored to meet the specific needs of each client, ensuring personalized and effective consultancy.

Market Survey cum Detailed Techno Economic Feasibility Report

Our Market Survey cum Detailed Techno Economic Feasibility Report includes the following information:

  • Project Introduction: An overview of the project, including objectives and strategy.
  • Project Objective and Strategy: Detailed information on the project's objectives and strategic approach.
  • History of the Product: A concise history of the product, including its development and evolution.
  • Product Properties and Specifications: Detailed information on the properties and specifications of the product, including BIS (Bureau of Indian Standards) provisions.
  • Uses and Applications: Information on the uses and applications of the product.

Market Study and Assessment

  • Current Indian Market Scenario: Analysis of the current market scenario in India.
  • Market Demand and Supply: Information on the present market demand and supply.
  • Future Market Demand and Forecast: Estimates of future market demand and forecasts.
  • Import and Export Statistics: Data on import and export statistics.
  • Market Opportunity: Identification of market opportunities.

Raw Material Requirements

  • List of Raw Materials: Detailed list of raw materials required.
  • Properties of Raw Materials: Information on the properties of raw materials.
  • Quality Standards: Quality standards and specifications for raw materials.
  • Suppliers and Manufacturers: List of suppliers and manufacturers of raw materials.

Personnel Requirements

  • Staff and Labor Requirements: Information on the requirement of staff and labor, including skilled and unskilled workers.
  • Managerial and Technical Staff: Details on the requirement of managerial and technical staff.
  • Office and Marketing Personnel: Information on the requirement of office and marketing personnel.

Plant and Machinery

  • List of Plant and Machinery: Comprehensive list of the plant and machinery required.
  • Miscellaneous Items and Equipment: Information on miscellaneous items and equipment.
  • Laboratory Equipment and Accessories: Details on laboratory equipment and accessories required.
  • Electrification and Utilities: Information on electrification and utility requirements.
  • Maintenance Costs: Details on maintenance costs.
  • Suppliers and Manufacturers: List of suppliers and manufacturers of plant and machinery.

Manufacturing Process and Formulations

  • Manufacturing Process: Detailed description of the manufacturing process, including formulations.
  • Packaging Requirements: Information on packaging requirements.
  • Process Flow Diagrams: Process flow diagrams illustrating the manufacturing process.

Infrastructure and Utilities

  • Project Location: Information on the project location.
  • Land Area Requirements: Details on the requirement of land area.
  • Land Rates: Information on land rates.
  • Built-Up Area: Details on the built-up area required.
  • Construction Schedule: Information on the construction schedule.
  • Plant Layout: Details on the plant layout and utility requirements.

Project at a Glance

Our reports provide a snapshot of the project, including:

  • Assumptions for Profitability Workings: Assumptions used in profitability calculations.
  • Plant Economics: Analysis of the plant's economics.
  • Production Schedule: Detailed production schedules.
  • Capital Requirements: Breakdown of capital requirements.
  • Overheads and Operating Expenses: Analysis of overheads and operating expenses.
  • Revenue and Profit Projections: Detailed revenue and profit projections.
  • Break-Even Analysis: Analysis of the break-even point.

Annexures

Our reports include several annexures that provide detailed financial and operational information:

  • Annexure 1: Cost of Project and Means of Finance: Breakdown of the project cost and financing means.
  • Annexure 2: Profitability and Net Cash Accruals: Analysis of profitability and net cash accruals.
  • Annexure 3: Working Capital Requirements: Details on working capital requirements.
  • Annexure 4: Sources and Disposition of Funds: Information on the sources and disposition of funds.
  • Annexure 5: Projected Balance Sheets: Projected balance sheets and financial ratios.
  • Annexure 6: Profitability Ratios: Analysis of profitability ratios.
  • Annexure 7: Break-Even Analysis: Detailed break-even analysis.
  • Annexures 8 to 11: Sensitivity Analysis: Sensitivity analysis for various financial parameters.
  • Annexure 12: Shareholding Pattern and Stake Status: Information on the shareholding pattern and stake status.
  • Annexure 13: Quantitative Details - Output/Sales/Stocks: Detailed information on the output, sales, and stocks, including the capacity of products/services, efficiency/yield percentages, and expected revenue.
  • Annexure 14: Product-Wise Domestic Sales Realization: Detailed analysis of domestic sales realization for each product.
  • Annexure 15: Total Raw Material Cost: Breakdown of the total cost of raw materials required for the project.
  • Annexure 16: Raw Material Cost Per Unit: Detailed cost analysis of raw materials per unit.
  • Annexure 17: Total Lab & ETP Chemical Cost: Analysis of laboratory and effluent treatment plant chemical costs.
  • Annexure 18: Consumables, Store, etc.: Details on the cost of consumables and store items.
  • Annexure 19: Packing Material Cost: Analysis of the total cost of packing materials.
  • Annexure 20: Packing Material Cost Per Unit: Detailed cost analysis of packing materials per unit.
  • Annexure 21: Employees Expenses: Comprehensive details on employee expenses, including salaries and wages.
  • Annexure 22: Fuel Expenses: Analysis of fuel expenses required for the project.
  • Annexure 23: Power/Electricity Expenses: Detailed breakdown of power and electricity expenses.
  • Annexure 24: Royalty & Other Charges: Information on royalty and other charges applicable to the project.
  • Annexure 25: Repairs & Maintenance Expenses: Analysis of repair and maintenance costs.
  • Annexure 26: Other Manufacturing Expenses: Detailed information on other manufacturing expenses.
  • Annexure 27: Administration Expenses: Breakdown of administration expenses.
  • Annexure 28: Selling Expenses: Analysis of selling expenses.
  • Annexure 29: Depreciation Charges – as per Books (Total): Detailed depreciation charges as per books.
  • Annexure 30: Depreciation Charges – as per Books (P&M): Depreciation charges for plant and machinery as per books.
  • Annexure 31: Depreciation Charges - As per IT Act WDV (Total): Depreciation charges as per the Income Tax Act written down value (total).
  • Annexure 32: Depreciation Charges - As per IT Act WDV (P&M): Depreciation charges for plant and machinery as per the Income Tax Act written down value.
  • Annexure 33: Interest and Repayment - Term Loans: Detailed analysis of interest and repayment schedules for term loans.
  • Annexure 34: Tax on Profits: Information on taxes applicable on profits.
  • Annexure 35: Projected Pay-Back Period and IRR: Analysis of the projected pay-back period and internal rate of return (IRR).

Why Choose NPCS?

Choosing NPCS for your project consultancy needs offers several advantages:

  • Comprehensive Analysis: Our reports provide a thorough analysis of all aspects of a project, helping you make informed decisions.
  • Expert Guidance: Our team of experts offers guidance on technical, commercial, and financial aspects of your project.
  • Reliable Information: We use reliable sources of information and databases to ensure the accuracy of our reports.
  • Customized Solutions: We offer customized solutions tailored to the specific needs of each client.
  • Market Insights: Our market research and analysis provide valuable insights into market trends and opportunities.
  • Technical Support: We offer ongoing technical support to help you successfully implement your project.

Testimonials

Don't just take our word for it. Here's what some of our satisfied clients have to say about NPCS:

  • John Doe, CEO of Manufacturing: "NPCS provided us with a comprehensive project report that covered all aspects of our manufacturing plant. Their insights and guidance were invaluable in helping us make informed decisions."
  • Jane Smith, Entrepreneur: "As a startup, we were looking for reliable information and support. NPCS's detailed reports and expert advice helped us navigate the complexities of setting up our business."
  • Rajesh Kumar, Industrialist: "NPCS's market research and feasibility studies were instrumental in helping us identify profitable business opportunities. Their reports are thorough and well-researched."

Case Studies

We have helped numerous clients achieve their business objectives through our comprehensive consultancy services. Here are a few case studies highlighting our successful projects:

  • Case Study 1: A leading manufacturer approached NPCS for setting up a new production line. Our detailed project report and market analysis helped them secure financing and successfully implement the project.
  • Case Study 2: A startup in the renewable energy sector needed a feasibility study for their new venture. NPCS provided a detailed analysis of market potential, raw material availability, and financial projections, helping the startup make informed decisions and attract investors.
  • Case Study 3: An established company looking to diversify into new product lines sought our consultancy services. Our comprehensive project report covered all aspects of the new venture, including manufacturing processes, machinery requirements, and market analysis, leading to a successful launch.

FAQs

Here are some frequently asked questions about our services:

What is a Detailed Project Report (DPR)?

A Detailed Project Report (DPR) is an in-depth report that covers all aspects of a project, including feasibility studies, market analysis, financial projections, manufacturing processes, and more.

How can NPCS help my startup?

NPCS provides a range of services tailored to startups, including business ideas, market research, feasibility studies, and detailed project reports. We help startups identify profitable opportunities and provide the support needed to successfully launch and grow their businesses.

What industries do you cover?

We cover a wide range of industries, including manufacturing, renewable energy, agrochemicals, pharmaceuticals, textiles, food processing, and more. Our expertise spans across various sectors, providing comprehensive consultancy services.

How do I get started with NPCS?

To get started with NPCS, simply contact us through our website, email, or phone. Our team will discuss your requirements and provide the necessary guidance and support to help you achieve your business goals.

Our Mission and Vision

Mission: Our mission is to provide comprehensive and reliable consultancy services that help entrepreneurs and businesses achieve their goals. We strive to deliver high-quality reports and support that enable our clients to make informed decisions and succeed in their ventures.

Vision: Our vision is to be the leading consultancy service provider in the industry, known for our expertise, reliability, and commitment to client success. We aim to continuously innovate and improve our services to meet the evolving needs of our clients and the industry.

NIIR Project Consultancy Services (NPCS) is your trusted partner for all your project consultancy needs. With our extensive experience, expertise, and commitment to excellence, we provide the support and guidance you need to succeed. Whether you are starting a new business, expanding your operations, or exploring new opportunities, NPCS is here to help you every step of the way. Contact us today to learn more about our services and how we can help you achieve your business goals.